首页 澳门金沙新入口玻璃幕墙雨篷施工方案

澳门金沙新入口玻璃幕墙雨篷施工方案

举报
开通vip

澳门金沙新入口玻璃幕墙雨篷施工方案Method Statement For WP942954 – Sands Macau Refresh New Entrance Contents Cover 1. General 1.1 Objective 1.2 Scope of works 1.3 Resources Required 1.4 Programme 2. Works Sequence 2.1 Preparation 2.2 Demolition Concrete Slab and Walls 2.3 Removal of Existing C...

澳门金沙新入口玻璃幕墙雨篷施工方案
Method Statement For WP942954 – Sands Macau Refresh New Entrance Contents Cover 1. General 1.1 Objective 1.2 Scope of works 1.3 Resources Required 1.4 Programme 2. Works Sequence 2.1 Preparation 2.2 Demolition Concrete Slab and Walls 2.3 Removal of Existing Curtain Walls 2.4 Façade & Entrance Installation 2.4.1 Structural Post & Support Stud 2.4.2 Cover up with External Casing 2.4.3 Curtain wall & Glazing Panel 3. Approval of Installation 4. Temporary Works & Hoarding 5. Hazard/Risk Assessment 6. Attachments Working Programme Sketch of External Hoarding 1. General 1.1 Objective This document serves as an outline method statement for the on-site construction activities to be executed under the trade contract for Sands Macau Refresh - New Entrance. The purpose of this method statement is to indicate the sequence of the façade works. 1.2 Scope of works The project is at Sands Paiza North – New Entrance A&A works. 1.3 Resources Required *Temporary site office with appropriate storage area for daily operation during construction period *Logistic planning for material delivery so as to carter for the timely programme; and to carry away of the construction debris. *Scaffolding and Platform System *Hoisting and rigging equipment for handling the steel post and wall glazing panels *Slightly welding work 1.4 Programme Please refer to the attachment 2. Works Sequence 2.1 Preparation Works 3. Prior to the commencement of the installation works, the hoarding(see 4. Temporary Works & Hoarding) and the following preparation will be completed: 2.1.1 Site surveying will be carried out to verify the location of various cast in item. Any discrepancy to be found, and it will be reported duly and on timely attitude and coordinate with relevant parties for follow up action. 2.1.2 Site facilities and services are available at the work places, 2.1.3 Materials delivered and plant mobilized in accordance with the programme 2.1.4 Scaffolding adjusted in accordance with the installation requirement and programme of works. 2.1.5 Erection of temporary works setting up hoisting chain block and lifting mechanism for glazing plane and aluminum cladding 2..l.6 Before delivery of steel posts and glazing panels from factory to site, all will be inspected as per QA requirement. 2.1.7 A site safety implementation planning shall be undertaking to an assigned representative. 3.1 Removal of Existing Curtain Walls Application of the movable & adjustable at height platforms to enhancing the work safety and efficiency; all lifting devices for glazing and aluminum cladding to be checked in advance and store in a proper place. 3.2 Demolition Concrete Slab and Walls To conduct a detail and precious site surveying on the structural features and define the stability of adjacent building works. Reinforcement works will be applied whenever necessary. And coordinate with Trade contractor 942955 to the SB1 installation shall be installed prior the demolition of the Mezz Level. Reinforcement Concrete Drilling and Cutting Circular blade saw cuts reinforced concrete causes absolutely no vibration. The detached piece can be removed immediate after cutting. Circular blade saw cutting, besides cost effective and time saving, is able meet the demand of effective, efficient and high quality performance. Cutting depths range from 50mm to 1,500mm, the blade is fixed with artificial diamond cutting edges that can cut concrete as well as the embedded steel reinforcement clean and sharp at the same time.    This method is suitable to be applied on walls, floors and suspended slabs. There are different kinds of blade saw cutting including Wall cutting and Floor cutting. 3.3 Façade & Entrance Installation Foundation Acceptance → Semi-products / Fabricated Parts and Material Acceptance → Pipe-rack and Equipment Frame Separated Assembling according to Axes and Area→Lifting →Alignment→ Tightening of bolts→Grouting→ Inspection→Ladder/Platform/Handrail Installation →Touch up paint→ Handing-over and Acceptance Type Demensions Qty(m) Weight(kg) SC1 H鋼400x400x172kg 14.1 2425.2 T1 H鋼200x200x50.5kg 145.5 7347.75 BR1 H鋼150x150x31.9kg 204.75 6531.525 SB2/SB3 H鋼300x300x94.5kg 30 2835 3.3.1 Structural Post & Support Stud 2.4.1a Setting out: With reference to the setting out point, the detailed setting out will be carried out using infra-red equipment and other appropriate tools. All setting will be verified in terms of all post plate locations and levels. It will be counter-checked against tolerances with QA/QC format and approved design drawings. 2.4.1b Deliver of the pre-assembled primary post net-works; it will divided into 4 major parts (subject to the FSD’s design); should be at the mounting moment whenever the fixing process is ready. And it may involved a temporary storage within the hoarding area last for a week time only. 2.4.1c The secondary sub-frame, fixing anchor and cladding/glazing panels are to be stored on site upon their work sequencing. 2.4.1d Lifting the primary post to be by a crane track and some chain block with ragging equipment will be using as stabilizer and assistance and which may fixed on the structure concrete for the time being. We will arrange a qualified banks man for any lifting. Competent workers should be familiar with particular details of drawings and quality requirements of specification. 2.4.1e Prior to installation, the surfaces, scaffolding and plant will be checked and inspected in accordance with ITP. (submission separately) 2.4.2 Cover up with External Casing     2.4.2a Levels/positions of the secondary sub-frame are checked in details and ascertain all accordance to the approved drawings.     2.4.2b Insulation materials and background panels (if any) will be placed.     2.4.2c Affixing of the Al. panels and glazing will be utilized with proper sucking/lifting equipment and leveling to be under serious monitoring. 2.4.3 Curtain Wall & Glazing Panel     2.4.3a The erection of Al post and transom are to be guidance with the infra-red machines.     2.4.3b All fixing anchor will be checked and testing mechanism to be carried out in accordance with the relevant specification.     2.4.3c Affixing of the glazing panels including the doors will be utilized with proper sucking/lifting equipment and leveling to be under serious monitoring     2.4.3d Prudent Measures:     *Lifting equipment will be inspected for reliability     *Weight of each object is observed, over loading is prohibited.     *Barricade area below where lifting to ensure safety of site operation.     *All workers will be provided with safety equipment for wearing. 4. Approval of Installation Check list will be submitted separately 5. Temporary Works & Hoarding All temporary works design will be prepared base on relevant code and be checked by a qualified engineer. Hoarding Plan External Hoarding System Internal Hoarding System 6. Hazard/Risk Assessment The hazard and risk assessment is submitted separately. End
本文档为【澳门金沙新入口玻璃幕墙雨篷施工方案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_005190
暂无简介~
格式:doc
大小:511KB
软件:Word
页数:7
分类:生活休闲
上传时间:2017-09-20
浏览量:54