首页 FIDIC合同指南

FIDIC合同指南

举报
开通vip

FIDIC合同指南Contents Foreword and Abbreviations Introduction to the Use of FIDIC’s Conditions of contract Project Procurement Recommended Procedures Procurement Documentation Example Forms for the Letter of Invitation and Instructions to Tenderers Clause 1 General ...

FIDIC合同指南
Contents Foreword and Abbreviations Introduction to the Use of FIDIC’s Conditions of contract Project Procurement Recommended Procedures Procurement Documentation Example Forms for the Letter of Invitation and Instructions to Tenderers Clause 1 General Provisions Clause 2 The Employer Clause 3 CONS/P&DB The Engineer EPCT The Employer’s Administration Clause 4 The contractor Clause 5 CONS:Nominated Subcontractors Clause 5 P&DB/EPCT:Design Clause 6 Staff and Labour Clause 7 Plant,Materials and Workmanship Clause 8 Commencement,Delays and Suspension Clause 9 Tests on Completion Clause 10 Employer’s Taking Over Clause 11 Defects Liability Clause 12 CONS:Measurement and Evaluation Clause 12 P&DB/EPCT:Tests After Completion Clause 13 V ariations and Adjustments Clause 14 Contract Price and Payment Clause 15 Termination by Employer Clause 16 Suspension and Termination by Contractor Clause 17 Risk and Responsibility Clause 18 Insurance Clause 19 Force Majeure Clause 20 Claims,Disputes and Arbitration Appendix General Conditions of Dispute Adjudication Agreement Glossary of Contract Terminology Index of Sub-Clauses 目录 工贸企业有限空间作业目录特种设备作业人员作业种类与目录特种设备作业人员目录1类医疗器械目录高值医用耗材参考目录 前言与缩写 关于使用菲迪克合同条件的引言 项目采购 推荐的程序 采购文件的提供和使用 投标邀请函和投标人须知范例格式第1条一般 规定 关于下班后关闭电源的规定党章中关于入党时间的规定公务员考核规定下载规定办法文件下载宁波关于闷顶的规定 第2条雇主 第3条CONS/P/DB工程师 EPCT雇主的管理 第4条承包商 第5条CONS:指定的分包商 第6条P&DB/EPCT: 设计 领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计 第7条员工 第8条生产设备、材料和工艺 第9条开工、延误和暂停 第10条竣工实验 第11条雇主的接收 第12条缺陷责任 第13条CONS:测量和估价 第14条P&DB/EPCT:竣工后试验第15条变更和调整 第16条合同价格和付款 第17条由雇主终止 第18条由承包商暂停和终止 第19条风险与职责 第20条保险 第21条不可抗力 第22条索赔、争端和仲裁 附录争端裁决协议书一般条件 合同术语 词汇 英语3500词汇语境记忆pets3考试词汇二年级反义词和近义词初中词汇词汇大全考研英语二高频词汇表 表 条款索引 Foreword and Abbreviations In 1999,Federation Internationale des Ingenieurs-Conseils(“FIDIC”)published the following four forms of contract, the first three of which are covered by this Guide and referred to as “CONS”,“P&DB”and “EPCT”: “CONS”:Conditions of Contract for Construction Which are recommended for building or engineering works designed by the Employer or by his representative, the Engineer. Under the usual arrangements for this type of contract, the Contractor constructs the works in accordance with a design provided by the Employer. However, the works may include some elements of Contractor-designed civil, mechanical, electrical and/or construction works. “P&DB”:Conditions of Contract for Plant and Design-Build Which are recommended for the provision of electrical and/or mechanical plant, and for the design and execution of building or engineering works. Under the usual arrangements for this type of contract, the Contractor designs and provides, in accordance with the Employer’s requirements, plant and/or other works; which may include any combination of civil, mechanical, electrical and/or construction works. “EPCT”:Conditions of Contract for EPC/Turnkey Projects Which are recommended for the provision on a turnkey basis of a process or power plant, and which may also be used where one entity takes total responsibility for the design and execution of a privately financed infrastructure project which involves little or no work underground. Under the usual arrangements for this type of contract, the entity carries out all the engineering, Procurement and Construction (“EPC”): providing a fully-equipped facility, ready for operation (at the “turn of the key”). Short Forms of Contract which is recommended for relatively simple or repetitive work, or for work of short duration or of small capital value. The Short Form of Contract is not covered by this Guide. In this Guide to the used of CONS, P&DB and EPCT, the word “Books” (with capital letter) is used when referring to the three publications: CONS, P&DB and EPCT. These Books were initially published as Test Edition in 1998, and the many reactions to them were reviewed before the First Editions were published in 1999. These three Books were prepared by FIDIC’s Update Task Group comprising: (省略了编写的单位和名称) 前言与缩写 国际咨询工程师联合会(FIDIC菲迪克)于1999年出版了以下4本合同格式,本指南覆盖了前三本合同,并简称为“CONS”,“P&DB”和“EPCT”: “CONS”:《 施工 文明施工目标施工进度表下载283施工进度表下载施工现场晴雨表下载施工日志模板免费下载 合同条件》 推荐用于由雇主或其代表——工程师设计的建筑或工程项目。这种合同的通常情况是,由承包商按照 雇主提供的设计进行工程施工。但该工程可以包含由承包商设计的土木、机械、电气和(或)构筑物 的某些部分。 “P&DB”:《生产设备和设计-施工合同条件》 推荐用于电气和(或)机械设备供货和建筑或工程的设计和施工。这种合同的通常情况是,有承包商 按照雇主要求,设计和提供生产设备和(或)其他工程;可以包括土木、机械、电气和(或)构筑物 的任何组合。 “EPCT”:《设计采购施工(EPC)/交钥匙工程合同条件》 推荐用于可以交钥匙方式提供加工或动力工厂;也可用于由一个实体承担全部设计和实施职责的,涉 及很少或没有地下工厂的私人融资的基础设施项目。这种合同的通常情况是,由该实体进行全部设计、采购和施工(EPC),提供一个配备完善的设施,(“转动钥匙”时)即可运行。 《简明合同格式》 推荐用于较简单或重复性的,或工期较短的、或资本金额较小的工程项目。本指南不包括简明合同格 式。 在本CONS、P&DB和EPCT应用指南中,“Books”(首子目大写)一词是指CONS、P&DB和EPCT这三本出版物。这些书曾于1998年作为试用版发行。经审核很多反馈意见后1999年出版了第1版。 (省略了编写的单位和名称) Each of three Books is in three parts:
本文档为【FIDIC合同指南】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_180829
暂无简介~
格式:doc
大小:23KB
软件:Word
页数:7
分类:金融/投资/证券
上传时间:2018-12-03
浏览量:97