首页 初中语文记叙文阅读指导

初中语文记叙文阅读指导

举报
开通vip

初中语文记叙文阅读指导初中语文记叙文阅读指导 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 b...

初中语文记叙文阅读指导
初中 初中体育教案免费下载初中各年级劳动技术教案初中阶段各学科核心素养一览表初中二次函数知识点汇总初中化学新课程标准 语文记叙文阅读指导 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 记叙文阅读指导 (上) 一、知识基础 需要掌握的基础知识包含以下几个方面: (一)组材线索。组材的线索多种多样:有的以时间为线索,有的以人物为线索,有的以事件为线索,有的以感情为线索,还有的以具体的事物为线索……抓住了行文的线索,可以较快的理清文章的思路与脉络。 (二)记叙要素。写人记事,必然要交代时间、地点、人物、事件的起因.经过和结果,这些就是记叙文的六个要素.掌握文章的要素,对整体感知文章大意有着非常重要的作用。 (三)记叙顺序。 1、顺叙 2、倒叙:?把事件的结果先写出来,然后再顺叙事情。?提到前面叙述的并不是事情的结局,而只是后面发生的事情,叙述由倒转顺后,并不是叙述到开头写的那件事情为止,而是可以发展下去写更多的事情。 倒叙的作用:?开篇点题;?造成悬念、引出下文、引起阅读的兴趣;?使文章更生动、灵活;?使结构更紧凑。 3、插叙:?在叙述的过程中插入一段从前发生的事情,一般有引出插叙的话,这句话不算插叙。?对人物或情况作一些说明和介绍。 插叙的前提是全文有一个中心事件,在叙述中心事件的过程中,停一下,插进一些必要的 内容 财务内部控制制度的内容财务内部控制制度的内容人员招聘与配置的内容项目成本控制的内容消防安全演练内容 。 插叙的作用:?表达具体内容;?使文章脉络清晰;?突出中心;?使文章结构紧凑;?可以对前文进行补充说明,为后文作辅垫。 (四)塑造人物的方法。主要有:外貌描写、神态描写、动作描写、语言描写、心理描写、侧面描写、侧面烘托等。 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar (五)语句的作用一般表现为两个方面:一是结构上的作用,包括总起全文、引起下文、打下伏笔、巧作铺垫、承上启下(过渡)、前后照应、总结全文、点明题旨、推动情节发展等等;一是内容上的作用,包括渲染气氛、烘托人物形象(或人物感情)、点明中心(揭示主旨)、突出主题(深化中心)等等。有些时候,同一个句子这两个方面的作用都具备,因而要从两个方面全面 分析 定性数据统计分析pdf销售业绩分析模板建筑结构震害分析销售进度分析表京东商城竞争战略分析 ,都能得到满意的分数。 (六)常见的修辞手法。比喻、拟人、排比、夸张、反复、借代、反问、设问、引用、对比等。 (七)多种方式综合运用的表达特色。记叙文以记叙、描写为主要表达方式,但议论、抒情等手法又不可缺少。 1、描写:?人物描写:语言、动作、外貌、神态、心理描写。作用:A、使文章更加生动形象具体,给人深刻印象;B、突出某种中心思想;C、表现人物的某种思想性格;D、表达作者的某种感情。 ?环境描写:自然环境描写和社会环境描写:交待时代背景,交待环境特点,渲染气氛,烘托人物的身份、地位、性格、心情,推动情节的发展。 2、议论:直接点明和加深所写事情的意义, 评价 LEC评价法下载LEC评价法下载评价量规免费下载学院评价表文档下载学院评价表文档下载 人物,突出中心思想,统领全文,承上启下,表达作者的感情。 3、抒情:无论是直接抒情,还是间接抒情,作用都是突出中心思想,感染读者,引起读者感情上的共鸣,表达作者对人、对事的思想感情。 二、加强表达训练 记叙文阅读以主观题为主,因此,表达能力的优劣已经成为决定得分高低的重要因素。这就要求我们必须加强对答题语言的系统训练。对主观题答题语言的基本要求是:第一,简明;第二,条理清晰;第三,表达富于美感,bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 自然流畅,有感染力。 (一)分析环境描写作用的常用词语有:烘托心情、渲染气氛、设置背景、衬托人物形象、深化文章主题、推动情节的发展等。 (二)分析语句作用的方法及常用词语:分析语句作用一般先谈结构作用,后谈表意的作用。常用词语可参考上文。这里只对结尾段和照应句的常见作用做一下归纳: 1、结尾段的作用。 ?总结全文,点明观点,或升华情感。 ?提出问题,引发读者的思考。 2、几种照应句的表达作用。 ?开头与结尾的照应。使文章结构完整,主旨鲜明,能更好地抒发情感,渲染气氛。 ?正文与标题的照应。揭示或强调标题含义,突出文章中心。 ?行文中的前后照应。制造悬念,使情节发展具有吸引力和戏剧性,结构更加完整。 (三)分析人物形象的方法:用语一般力求精美。可多用四字短语。 评价语言特色的常用词语有:准确、严密、生动、形象、深入浅出、言简意赅、语言简炼、简洁明了、通俗易懂、节奏感强、委婉含蓄、意味深长、发人深省、寓意深刻、富有感染力、引发阅读兴趣等。 (四)分析词、句、段的表达作用。 (1)解词或句的意思;(2)分析其对表现中心思想的作用,对表现人物品质的作用,对表达感情的作用;(3)分析其对语言表达效果的影响;(4)所用修辞及作用;(5)对读者影响;(6)与上下文的关系。 (五)记叙的人称:第一人称和第三人称的作用 第一人称:便于直抒胸臆,读起来有一种亲切感和真实感。 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 第三人称:不受时空限制,能从更多的角度自由的叙述。 第二人称:称要写的人为你或你们,抒发强烈的感情。 (六)代词指代的内容:一般在原文中找,找到的内容要放到代词的位置上和上下文连读,读得通就对,否则不对。 (七)记叙文段意和全文的内容 首先要区别各段的表达方式,概括表达方式不同的段落要采取不同的语言表达形式:一般议论、抒情段,用表达了、抒发了、揭示了、点明了等动词,连带本段的具体内容;如果是记叙段,不论是自然段、结构段,层次或全文,都可以用下面的语言形式概括:谁在什么情况下,怎样做了什么,结果如何。如果是写人的记叙文,还可以加一项内容:表现了人物什么品质。 (八)归纳中心思想: 归纳中心思想:通过什么人和事,表现谁的或哪类人的什么精神、本质,表达了作者对谁的什么感情。常用的感情有热爱、赞颂、感激、怀念、揭露、厌恶、怦击、痛斥、讽刺。 (九) 分析人物的方法:(1)要把人物放在特定的时代和特定的情境中去分析;(2)看别人对人物的反应;(3)看作者的概括评价;(4)分析时可以先通过对人物的描写揣摩人物的心态,在此基础上进一步分析人物的性格。 (十)归纳作者及文中人物的思想感情 (1)抒情主体是谁;(2)抒情对象是谁;(3)抒情内容(词语);(4)抒发了怎样的感情;(5)感情特点是什么。 (十一)评价文章的写作特点 (1)选材:是否围绕中心,是否典型,材料安排是什么顺序,是否有bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 详略。 (2)结构:是否严谨、巧妙,具体表现为哪些方面,过渡、照应、线索。 (3)表达方式:除记叙外还有什么表达方式,它们和记叙是什么关系,有什么表达作用。 (4)表现手法:对比、拟人、夸张、象征、烘托、欲扬先抑、以小见大、反复。 (5)语言:是否生动、形象、富于表现力,平实、自然、亲切,饱含感情、含蓄,文学色彩浓,幽默风趣。 (6)刻画人物的方法。 当然,我们上面列出的这些答题技巧,必须根据具体的题目灵活运用,这样才能得到理想的分数。另外,卷面的整洁情况也会影响到得分的高低,因此,同学们应该注意培养自己工整规范 关于书的成语关于读书的排比句社区图书漂流公约怎么写关于读书的小报汉书pdf 写的好习惯 记叙文阅读指导(下) 1、依次写出文中的事情。 2、文中详写了哪一件事。 3、题干中有“为什么”的问法,一般有下面几种情况 ?作者为什么选了这些内容来写,从写作目的的角度来回答,一般是为了突出中心、突出人物、表达情感,起衬托作用、铺垫作用等等。 ?作者为什么这样认为,一般出现在散文中,要从找理由的角度来回答,所有的理由都在原文中能找到,要找得全面、完整。 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar ?人物为什么这样做,这里的“为什么”要分解成“因为什么”和“为了什么”两个方面,即要从“原因”和“目的”两个方面去思考“原因”部分,又要按下面的方式来思考:客观原因、主观原因,或增加社会原因,或增加根本原因。 4、分析人物的心理和行为的变化过程:“心理”包括心理状态,如紧张、兴奋等;还包括心理活动,比如想要怎么样。此题随文回答,要抓准每一个环节,要概括得准确。 5、划线语句的表达作用(也包括加点词的表达作用,特定段落的表达作用,一些试图被删除、被替换的词的表达作用)思考的角度是7个方面。?这句话或词的意思;?这句话或这个词用来表现谁、表现什么;?表达作者或是文中人物的什么感情;?突出文章或段落的什么中心;?对上下文有什么作用;?用的什么修辞有什么好处;?对读者有什么特殊影响。 6、选词填空,选句填空:填上后连接上下文,读起来顺畅即为对。 7、文章中某些代词、概括性语句指的是什么,要注意提示语,要认真读原文,要把答案放在所分析词语的位置上,看看是否通顺。 8、文章的开头和结尾用了什么写法,没有固定答法,随文而定,一般可以从如下几个角度去思考:表达方式(记叙、议论、抒情、描写、说明);表现手法(夸张、拟人、反复、对比、欲扬先抑、象征);修辞方法(比喻、拟人、排比、对偶、夸张、反复、设向、反向、引用);各种写作技巧,如悬念、照应、伏笔、铺垫等。 9、标题的含义有哪几层,先来了解一下标题的一般类型:时间、地点、人物、线索、主要内容、话题、主题、文体名称等。标题的含义一般先回答其表层意思,然后根据文章的中心和作者的感情分析其深层含义,甚至是与标题字面完全相反的意思。 10、根据文章的信息,概括人物形象:一般以概括人物性格、思想为主,也可以概括出人物的年龄、爱好、经历、遭遇、身份、地位、特长、生活的bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 时代、给人的感受(可恨又可怜)等。 11、表达的感情是什么,一般要作如下思考:是谁在抒情,对什么人、什么事、什么物在抒情,用了褒义词还是贬义词来抒情,抒发的是什么情。 12、给小说续写结尾,要注意以下几点:?抓住原文的线索;?扣住原文的中心人物;?符合原文的主题;?形象性强。切记:不能用告诉的方式写,不能抒情和议论。 13、比较两句话的细微差别:?词语运用有什么不同;?语气有什么不同;?语序有什么不同;?表达的意思或情感有什么不同。 14、正面衬托的作用是什么,要学会识别正面衬托。其作用一般是:突出中心人、事、物的特点,说明许多与中心事物同类的事物也具有中心事物的特点,中心事物的特点有了普遍的意义,使文章主题得以深化和拓展。 15、侧面描写有什么作用,要准确识别侧面描写。其作用一般是:突出中心人物或事物的特点,使中心人物或事物的形象更真实可信,具有强烈的艺术感染力。 16、比较事物、人物或事情、感情的异同:首先要确定好比较的点。 17、从哪些角度来描绘某一景物的,要着眼于景物本身的形、声、色、味、态、质地、环境几个方面。如果在特殊提示,再答视觉、听觉、嗅觉、味觉、触觉。 18、景物描写的作用:交待自然环境特点、社会环境特点,渲染气氛,烘托人物心情,衬托人物性格、身份、地位,推动情节发展。 19、在文中补写出人物的心理、语言、动作、外貌、神态:第一要注意人称,第二要符合人物性格及所处的环境。 20、刻画人物用了哪些方法,一般有概括介绍和具体描绘,具体描绘中又有正面描写和侧面描写,正面描写中又包括语言描写、动作描写、外貌描写、心理描写、神态描写。 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 21、文章给你的启示、读了文章的感受、你对事情的看法等发挥类的题,首先要做到观点鲜明,观点有时也可以有相关的多个,语句之间不要重叠、交叉、包含。 22、某句话你是怎样理解的,要根据全文的内容说明作者赋予此句的意思 记叙文阅读答题技巧 语段阅读题答题总原则: (1)、先读题后读文。读题时注意从题干中找出“题眼”(即答题关键点),带着问题读文,使阅读具有明确的目标。 (2)、读文时,要注意整体把握文章的主要内容和中心意思。 (3)、准备答题时,必须再次细读题目,找准“题眼”。 (4)、答题时,具体题目涉及到相关段落,要对这些段落反复研读;如涉及全篇,则要再读全文。 1、文章体裁 :诗歌、小说、散文(抒情散文、叙事散文)、剧本、说明文、议论文 2、记叙文六要素:时间、地点、人物、事件、起因、经过、结果 3、散文种类:(1)叙事散文(2)抒情散文 4、散文特点: 形散而神不散。 5、小说种类: 长篇小说、 中篇小说、 短篇小说、 小小说。 6、小说三要素: 人物、 环境、 情节(开端、发展、高潮、结局 )。 bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 7、记叙文的表达方式: 记叙、议论、抒情、描写、说明。 8、找主题句: 找首段或尾段的议论、抒情句。 9、文 眼: 标题是“文眼”,统帅全文(新闻);有时交代主要人物、故事情节,有时交代主要事、物(“物”象征意义);有时还是“线索”。 10、 材料组织特点:紧紧围绕中心;选取典型事件;剪裁得体;详略得当。 11、 划分层次: (1)按时间划分(找表示时间的短语) (2) 按地点划分(找表示地点的短语 (3) 按事情发展过程(找各个事件) (4) 总分总(掐头去尾) 以写事为主的文章: ?(按事情发生发展的先后时间分析; ?(按事情发生发展的地点转换分析; ?(按事情发展的阶段分析。 以写人为主的文章: ?、按人物成长的阶段分析; ?、按人物所在的不同地点分析; ?、按表现人物不同性格特征的不同条件分析; ?、按人物感情的变化分析。 以写景状物为主的文章: ?、按人物观察景物的观察点的变化,即空间变化分析; ?、按不同时间的不同景致的变化,即时间变化分析。 12、 记叙的线索及作用: 线索: (1)核心人物 (2)核心事物 (3)核心事件 (4)时间 (5)地点 (6)作者的情感 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 作用:是贯穿全文的脉络,把文中的人物和事件有机地连在一起,使文章条理清楚、层次清晰。 答题套路: 如: 文章以“……”线索,中间串写了“……”、“……|”几件事,组成一种“冰糖葫芦”的“串”式结构,选材典型,脉络清晰,主旨鲜明。 13、为文章拟标题: 找文章的线索或中心。 (1)核心人物 (2)核心事物 (3)核心事件 (4)时间 (5)地点 (6)作者的情感 14、 记叙的顺序及作用: (1) 顺叙(按事情发展先后顺序) 作用:叙事有头有尾,条理清晰,读起来脉络清楚、印象深刻。 (2) 倒叙(先写结果,再交待前面发生的事。) 作用:造成悬念、吸引读者,避免叙述的平板单调,增强文章的生动性。 (3) 插叙(叙事时中断线索,插入相关的另一件事。) 作用:对情节起补充、衬托作用,丰富形象,突出中心。 (4) 平叙(略) 15、 语言特色: (形象生动、清新优美、简洁凝练、准确严密、精辟深刻、通俗易懂、音韵和谐、节奏感强等) 答题套路:这篇文章语言(自然朴素或生动优美)如“……(摘录文章中的相关句子)”,它“……(适当地选入下面词库摘抄的语言)”。 bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 例句:这篇文章语言优美生动,如“让人了却忧虑,悠游其中” 、 “拍打着你心底沉淀的情绪”、“攫走你紧紧扯在手里的轻愁”等,笔意超逸,清新隽美,富有诗意,给人留下不尽的余味。(《夏之绝句》) 注意:结合语境和修辞方法从下列语句中选择。一定要根据文章的具体内容来选用恰当的词语,切莫张冠李戴。 附:朴实自然的语言赏析词库: (1)、朴实无华 (2)、写得晶莹澄澈,明润无疵,如诗如画 (3)、言简意赅,清真雅洁,朴素自然 (4)、语言简洁,气势纵横 (5)、文字洗练,意境深邃 (6)、语言朴实活泼,节奏明快,上口顺耳 (7)、文辞畅达,沉静雅洁 (8)、平易省净的语言,运笔飘逸流动,设色素淡而隽永…… 生动优美的语言赏析词库: (1)、文笔凝练,刻画传神 (2)、细致传神的描绘,使行文摇曳多姿,富于变化,主题鲜明突出 (3)、含蓄隽永,耐人咀嚼,发人深思,给人留下不尽的余味 (4)、 笔意超逸,九曲回肠,有绘画的色彩美,也有诗的韵味美 (5)、 汹涌豪迈的气垫,清丽隽永的风格,稳健深沉的笔触 (6)、血肉丰富,意蕴深刻语言深沉缠绵,感人肺腑 (7)、大笔泼墨,尽情挥洒 (8)、说理深刻,内容厚重 (9)、语言气垫壮阔,精练凝缩,激动人心 (10)、深婉隐约,耐人寻味 (11)、语言优美,富有诗意,撼人心扉 (12)、行文起伏跌宕,含temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 义深邃隽永…… bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery,
本文档为【初中语文记叙文阅读指导】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_014457
暂无简介~
格式:doc
大小:167KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-10-15
浏览量:13