首页 人教版 四年级下册语文1~8单元词语盘点田格填空

人教版 四年级下册语文1~8单元词语盘点田格填空

举报
开通vip

人教版 四年级下册语文1~8单元词语盘点田格填空人教版 四年级下册语文1~8单元词语盘点田格填空 第一单元读读写写 看拼音写词语(看谁写得又正确又漂亮又快速): dîng tíng jiüng nán wán shǎng wú xia kuò sàn pān dēng tài shān luò tuó píng zhàng zhè jiāng yïu tïng yōng jǐ kǒng xì yǎng wî tún bù shüo wýi ã jiǎo cü shüng yÿ jù jìng tíng shün bō lán zhuàng ku...

人教版 四年级下册语文1~8单元词语盘点田格填空
人教版 四年级下册语文1~8单元词语盘点田格填空 第一单元读读写写 看拼音写词语(看谁写得又正确又漂亮又快速): dîng tíng jiüng nán wán shǎng wú xia kuò sàn pān dēng tài shān luò tuó píng zhàng zhè jiāng yïu tïng yōng jǐ kǒng xì yǎng wî tún bù shüo wýi ã jiǎo cü shüng yÿ jù jìng tíng shün bō lán zhuàng kuî shuǐ píng rú jìng fýng luán xiïng wþi hïng yâ sì huǒ bá dì ãr qǐ wün yán qí fýng luï liâ xíng tài wàn qiün sâ cǎi míng lì wýi fýng wù lì lián mián bù duàn tū wù sýn yù circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 读读记记 fþi cuì liáng shuǎng güo sǒng shün jiàn tîu shâ jì jìng zýng tiün xì suì mǎ tí rïu nân jǐn duàn mián yán xuàn làn bái ái ái chïng chïng diã diã bün bün diǎn diǎn 独坐敬亭山 望洞庭 忆江南 【 】 【 】 【 】 , , 。 。 。 , , 。 。 。 四年级语文下册日积月累 1、 舟行碧波上,_______________ __。 2、大漠孤烟直,_____ _ ____________。 几行红叶树,_____________________。 3、 4、落木千山天远大,____________________。 5、浮天水送无穷树,____________________。 6、春江潮水连海______________________。 第二单元词语盘点(读读写写) rotection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highber; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable py numbe more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identif ot exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should notall ntouch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing sh s are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth andn holeof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot whexpansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproate eannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriworkers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket c uctionection, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constrtion should be carefully checked before the process piping and equipment layout, and check the cable trough the practical dirnstrucnt cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Coould be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrumeon shstatic measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take anti2 看拼音写词语(看谁写得又正确又漂亮又快速): wãi chí cái fù jÿnɡ zhàn qì zhînɡ shǔ yú bǎi huî qínɡ xínɡ dào dã hào mǎ xiànɡ pí zūn yán táo nàn shàn liánɡ pǔ shí kuǎn dài lì wài hïu jiã zàn shǎnɡ chuí bâi jiünɡ yìnɡ xǔ pâi bō diàn huà huǎn huǎn shǐ ɡuî mân mân bú lâ mí huî bù jiþ miàn chãnɡ cài sâ pí bâi bù kün lánɡ tūn hǔ yàn ɡǔ shîu rú chái 读读记记 n each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highlled oling practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be instaent temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good seae ambicted to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, thhould be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire conneges sol room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edbe fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the contr shouldand bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors bends ping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, e trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process pie cabln plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check thfor 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the constructioon should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-e operator shall take anticircuit board by hand or tool, th3 jiã jū býn chí kuì zânɡ tiün jÿn sǔn shünɡ liànɡ shài zhú qiün huǒ hîu dün wù zhuàn qián shú liàn jiào dǎo jiǎnɡ jiū shîu yì chãn zhînɡ dào xiâ yǎn shãn bào yuàn ɡǔ lì kuün rïnɡ mânɡ mâi yǐ qiú zǒu jiý chuàn xiànɡ jiünɡ xÿn bǐ xÿn 日积月累 7、________________________,无数夕阳山。 8、言必信,_______________。 9、与朋友交,_______________。 10、己所不欲,__________________ 。 11、精诚所加,______________。 12、老吾老,__________ ;幼吾幼,_____________。 13、爱人者, _____________;敬人者,___________ 。 14、 清明前后_____________ 。 单元三读读写写 rotection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highber; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable py numbe more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identif ot exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should notall ntouch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing sh s are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth andn holeof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot whexpansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproate eannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriworkers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket c uctionection, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constrtion should be carefully checked before the process piping and equipment layout, and check the cable trough the practical dirnstrucnt cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Coould be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrumeon shstatic measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take anti4 看拼音写词语(看谁写得又正确又漂亮又快速): lǚ yïu yîu ɡuī shā tān zhēn chá qǐ tú qínɡ yuàn chǔn shì fǎn huí hǎi ōu bǔ jiù biān fú qīnɡ lǎnɡ bǔ zhuō fēi ã wãn zi bì kāi mǐn ruì línɡ dānɡ cānɡ yínɡ jiē kāi tuī jìn zhànɡ ài wù yínɡ ɡuānɡ pínɡ zhēnɡ xiān kǒnɡ hîu ruî wú qí shì jiàn sǐ bú jiù xiǎnɡ châ yún xiāo hãnɡ qī shù bā yú ɡuàn ãr chū yú bù kě jí qì chuǎn xū xū 日积月累 14、 清明前后_____________ 。 15、朝霞不出门,_____________________ 。 16、鸡迟宿,________________。 17、蚂蚁搬家蛇过道, 。18、春_____ ,夏 ______,秋 ______ ,冬______。 单元四读读写写 ges sol room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edbe fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the contr shouldand bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors bends ping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, e trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process pie cabln plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check thfor 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the constructioon should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-e operator shall take anticircuit board by hand or tool, thn each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highlled oling practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be instaent temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good seae ambicted to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, thhould be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire conne5 看拼音写词语(看谁写得又正确又漂亮又快速): chãn jì pán wân kǒu shào mái fú nínɡ shãn shāo huǐ wãi hù zhuànɡ liâ xī shēnɡ xiâ yì chãn jìn shãn qínɡ kǎi xuán zhēnɡ yī nínɡ ɡù ā yí jīnɡ tōnɡ jīnɡ jì ɡînɡ xiàn shânɡ tán zuì â hū yù jiàn kānɡ bù huānɡ bù mánɡ zá cǎo cïnɡ shēnɡ jù jīnɡ huì shãn mï mï hu hu yǐ fánɡ wàn yī duàn duàn xù xù yǒnɡ zhù rãn jiān 读读记记 mù xiâ mï ɡū shēn yín wǎn zhuǎn lú wěi wěi xù n holeof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot whexpansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproate eannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriworkers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket c uctionection, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constrtion should be carefully checked before the process piping and equipment layout, and check the cable trough the practical dirnstrucnt cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Coould be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrumeon shstatic measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take antirotection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highber; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable py numbe more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identif ot exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should notall ntouch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing sh s are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and6 dǎ bàn jǐ bâi zhěn tïu fánɡ bâi zhuï yuâ lán kuī mí màn wēi xiã wâi lán xún yì mânɡ huàn zǔ dǎnɡ zhēnɡ yǎn xiā shǒu liú dàn lǜ yīn yīn piāo piāo yōu yōu wāi wāi xiã xiã bú sù zhī kâ 日积月累 (1)关于战争的 成语 知( )知( ) 百( )百( ) 运( )帷( ) ( )( )千里 出其( )( ) 攻其( )( ) 围( )救( ) 声( )击( ) 四面( )( ) ( )( )受敌 草木( )( ) 风声( )( ) 兵( )神( ) 突然( )( ) 神( )鬼( ) 所( )无( ) 第五单元读读写写 be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the contr shouldand bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors bends ping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, e trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process pie cabln plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check thfor 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the constructioon should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-e operator shall take anticircuit board by hand or tool, thn each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highlled oling practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be instaent temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good seae ambicted to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, thhould be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire conneges sol room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the ed7 nïnɡ yù liú lián xiǎo jìnɡ liú chànɡ yǐn dǎo qiǎo rán línɡ xìnɡ jīnɡ lì shùn jiān pū shǎn ɡài niàn hú xiàn fēi xiánɡ quán lì bīn fēn ɡǔ dînɡ yuâ dînɡ yù wànɡ chōnɡ pî jiān yìnɡ bù qū zhuï zhuànɡ chãn wěn zhân hàn zāo tɑ duǎn zàn yǒu xiàn zhēn xī huā fán yâ mào kē kē bàn bàn duō zī duō cǎi 读读记记(5) lǒnɡ zhaî hē hù liú tǎnɡ juān zânɡ qì ɡuān jiǎo mï of measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot whexpansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproate eannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriworkers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket c uctionection, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constrtion should be carefully checked before the process piping and equipment layout, and check the cable trough the practical dirnstrucnt cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Coould be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrumeon shstatic measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take antirotection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highber; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable py numbe more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identif ot exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should notall ntouch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing sh s are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth andn hole8 kù ài yōnɡ bào zūn cïnɡ shī mínɡ lǐnɡ wù fá wâi fàn làn liáo kuî yí hàn qì pî qīnɡ xī ɡū līnɡ līnɡ qí shuā shuā qīnɡxiānɡniǎoniǎo bù jiǎ sī suǒ râ lâi yínɡ kuànɡ yǔ shì chánɡ cí chïnɡ jiàn tiān rì ɡǎi tiān huàn dì ào rán tǐnɡ lì shãn qì shí zú pēnɡ rán yí zhân 日积月累 (2)关于生命感悟的名人名言 1、人的生命是有限的, (雷锋) 2、我的一生始终保持着这样一个信念 而不是 3、 (巴金) 4、对于我来说 (爱因斯坦) 第六单元词语盘点(读读写写) pãng jià fýng qù zhuüng shì shùn xù zhào lì qiáo jian be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the contr shouldand bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors bends ping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, e trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process pie cabln plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check thfor 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the constructioon should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-e operator shall take anticircuit board by hand or tool, thn each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highlled oling practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be instaent temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good seae ambicted to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, thhould be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire conneges sol room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the ed9 shuài lǐng mì shí dǎo yÿ xiàng wǎn guÿ cháo hã xiã xÿn kǔ cán süng yún tián bái lù jÿ guün huü yuâ míng rãn jìng dà lì jú cuÿ mián qǔ fáng qián wū hîu tiün güo dì kuî 读读记记 mù chǎng zhuün zhù duün zhuüng sÿ rïng xiüng qiàn jùn mǎ zhý yǎn fýi chí chãn mî shǎn shuî wýi ruî lûâ guî hú pàn chân shün jÿng yíng yÿn fú zhüo hu qÿng liáng fâi fǔ mài làng hïng pū pū jí mù yuǎn tiào biüo fãi tǐ zhuàng liáo kuî wú yín yōu rán zì dã chãng qúnjiã duì mî mî wú yán ã huáng nân lǜ yá büo chū fàng cǐ qǐ bǐ luî 第七单元读读写写 biàn lùn xún cháng jiþ dá xìn fâng rïng xǔ wãi bâi all ntouch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing sh s are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth andn holeof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot whexpansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproate eannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriworkers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket c uctionection, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constrtion should be carefully checked before the process piping and equipment layout, and check the cable trough the practical dirnstrucnt cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Coould be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrumeon shstatic measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take antirotection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highber; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable py numbe more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identif ot exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not10 cãng jÿng tuō zhù jiþ shì jiào shîu xuün bù gù zhí lán gün bà le jìng jiâ xiù huü chǎng huÿ lïng yǎ rãn dǎn daà wàng wãi qÿng châ jiàn dǐ shǎng xÿn yuâ mù yì sÿ bù gǒu rïng wãi yì tǐ 读读记记 yüo qǐng zhì yǒu sù xiàng zhù hâ jiã zuî dàn shýng dǎ rǎo yì yàng jÿ liâ jiüo tán jìng zi mþng rán bào qiàn jiàn guài gǎn chù shū chàng yí huî jiün yì píng huǎn biün yuán kþ bù hïng zhǒng zhà gün huüng liáng yîu rãn diüo sù jiü xiüng pýn pýn quán shãn guàn zhù yí tài duün zhuüng mî míng qí miào ges sol room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edbe fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the contr shouldand bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors bends ping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, e trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process pie cabln plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check thfor 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the constructioon should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-e operator shall take anticircuit board by hand or tool, thn each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highlled oling practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be instaent temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good seae ambicted to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, thhould be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire conne11 xìn xÿn shí zú yí huî bù jiþ 第八单元读读写写 qÿ zǐ bài jiàn lǐ cǎi cháng wâi tüng yào yÿ zhì pýn shâ huǒ yàn qū gǎn lǐng xiù chãng fá jìng pâi huǒ zhǒng zào fú wãi kàng hþn xÿn shuüng xÿ zhuï shí gün zàng jì chüng xuã shâ bǎi fü bǎi zhîng biǎn quâ zhì bìng wú nãng wãi lì qū hán qǔ nuǎn qì jí bài huài 读读记记 táng cháo xÿ zàng dà chãn qiú hūn duàn dìng wün dîu rotection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highber; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable py numbe more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identif ot exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should notall ntouch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing sh s are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth andn holeof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot whexpansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproate eannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriworkers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket c uctionection, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constrtion should be carefully checked before the process piping and equipment layout, and check the cable trough the practical dirnstrucnt cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Coould be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrumeon shstatic measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take anti12 gýng zhîng zhǎo zã jì yì fýn fù ráo shù guÿ jǔ dǎn píng jÿn bì bǎo lþi tiþ chü wãi bâi jiþ jiù dǎo mãi qǐ shì jiǎn duǎn kǒu wþn jí xiáng rú yì wǎn gōng dü jiàn xiào zhú yán küi pÿ tïu sàn fà wú â bú zuî rïng huá fù guì ýn jiüng chïu bào xià liú wú chǐ ling practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be instaent temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good seae ambicted to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, thhould be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire conneges sol room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edbe fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the contr shouldand bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors bends ping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, e trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process pie cabln plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check thfor 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the constructioon should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-e operator shall take anticircuit board by hand or tool, thn each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid highlled o13
本文档为【人教版 四年级下册语文1~8单元词语盘点田格填空】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_954223
暂无简介~
格式:doc
大小:1MB
软件:Word
页数:32
分类:生活休闲
上传时间:2018-01-07
浏览量:67