首页 水利分部工程验收鉴定书

水利分部工程验收鉴定书

举报
开通vip

水利分部工程验收鉴定书水利分部工程验收鉴定书 编号:01-03 。。。。水库大坝枢纽工程 左岸非溢流坝段分部工程验收 鉴 定 书 单位工程名称:。。。。埋石混凝土重力坝 左岸非溢流坝段分部工程验收工作组 2014年12月25日 instrument equipment of procurement, and test and rate set according to this technology terms provides, and construction drawings requirements and su...

水利分部工程验收鉴定书
水利分部工程验收鉴定书 编号:01-03 。。。。水库大坝枢纽工程 左岸非溢流坝段分部工程验收 鉴 定 书 单位工程名称:。。。。埋石混凝土重力坝 左岸非溢流坝段分部工程验收工作组 2014年12月25日 instrument equipment of procurement, and test and rate set according to this technology terms provides, and construction drawings requirements and supervision Department indicates, completed monitoring instrument equipment (including cable, and accessories) of procurement, and transport, and test, and custody, and Assembly, and rate set, work. (2) monitoring equipment installation, Embedment and the associated civil works construction drawings under this contract requirements and supervision instructions, complete the installation of monitoring equipment at the site and lay, as well as the necessary for installation, Embedment drilling, drilling, backfill, concrete pouring work. And monitoring equipment installation and laying of related civil engineering work, including (but not limited to): 1) drill: including monitoring hole drilling, borehole flushing, opening protection all drilling operations. 2) drill backfill: cement mortar or grout. 3) concrete: including concrete work at the Observatory. (3) monitoring contract monitoring equipment installed and buried timely records after the initial reading, and according to the technical terms and the technical requirements to monitor contract work 前言 。。。位于龙溪河下游左岸小支流断石河中游,是一座以农业灌溉和场镇供水为主,兼顾灌区农村人、畜饮水的综合利用中型水利工程。水库大坝枢纽位于。。。村的河坝湾处,坝址距。。镇约2.9km,距坪。。约11.0km,距县城41km,距。。主城约150km。水库灌区涉及鹤游、坪山、砚台及包家4个乡镇,同时兼顾鹤游、坪山场镇供水。 23。。。址以上集雨面积52.71km。水库正常蓄水位419.50m,相应库容869万m;设 3计洪水位(P=2%)420.19m,相应库容960万m;校核洪水位(P=0.2%)420.91m,相应 333库容1065万m;死水位409.50m,相应库容123万m,调节库容746万m。 1、验收依据 (1) 《水利水电建设工程验收规程》SL223-2008; (2) 《水利水电工程施工质量检验与评定规程》SL176-2007; (3)《水利水电工程单元工程施工质量验收评定标准》SL632-2012; (4) 设计图纸、设计变更 通知 关于发布提成方案的通知关于xx通知关于成立公司筹建组的通知关于红头文件的使用公开通知关于计发全勤奖的通知 及施工技术要求; (5) 施工合同。 2、组织机构 建设单位:。。。 设计单位:。。。 监理单位:。。。 施工单位:。。。 运行管理单位: 3、验收过程 2014年12月25日。。。。。委托重庆市弘禹水利咨询有限公司主持对。。。埋石混凝土重力坝工程左岸非溢流坝段分部工程进行验收,分部工程验收工作组通过察看现场、查阅资料,(听取施工、设计、监理等单位的工作 报告 软件系统测试报告下载sgs报告如何下载关于路面塌陷情况报告535n,sgs报告怎么下载竣工报告下载 )讨论并通过该分部工程验收鉴定书。 一、分部工程开工完工日期: 本分部工程于2012年5月23日开工,至2013年8月26日完工。 二、分部工程建设内容 本分部工程建设内容为:防渗面板砼、坝体埋石砼、垫层砼及换填砼浇筑、(坝内预埋钢筋砼管集水道、PVC排水管核实有无此部工程量)沥青杉木板制安等。 三、施工过程及完成的主要工程量: 1、施工过程: 本分部工程于2012年5月23日开始(浇筑)1—8号坝段、2012年12月7日开始9号坝段换填砼(9号坝段无换填砼)、垫层砼、防渗砼及坝体埋石砼施工,于2013年8月26日全部完成。施工前及过程中对建筑物轮廓线及线型变化点进行了施工放样,并将相关成果报监理工程师复核。外露面模板使用定型钢模加拉筋固定,沉降缝模板使用木模拼装而成,同时按照设计要求设置沥青杉木板沉降缝及上游防渗面板的铜片和橡胶止水。在模板安装及基础面或施工缝处理等工序验收合格并经监理工程师签署砼开仓许可证后进行砼浇筑,砼及埋石采用塔机吊运入仓。砼浇筑严格执行“三检制”及监理“旁站制”,做到每个施工工序经监理工程师验收合格后方进行下一工序的施工。 在施工过程中按照设计及 规范 编程规范下载gsp规范下载钢格栅规范下载警徽规范下载建设厅规范下载 要求对基础面或施工缝、模板安装、预埋件制作及安装、砼浇筑、埋石及砼外观质量等工序进行检查、控制,同时加强了(砼试配)原材料及中间产品的检测取样检测工作。通过对施工工序及原材料、中间产品的有效控制,本分部工程质量满足设计及规范要求。 2、完成的主要工程量: 坝基C15换填砼约3800m?,C15W4垫层砼约5100m?,C20W6防渗砼约7500m?,C15埋石砼约31100m?,预制砼管、PVC管。 四、质量事故及缺陷处理: 无。 五、拟验工程质量评定: 1、单元工程划分 根据重庆市水利工程质量监督中心站以渝水质监。。。号文件对。。。。工程单位、分部工程批复,施工单位对单元工程进行细化,监理审核,业主认可。该分部工程共划分351个单元工程,其中C15砼基础换填17个,C15W4砼垫层18个,C20W6砼防渗层163个,C15埋石砼坝身153个。 2、工程质量检测 ing to the technical terms and the technical requirements to monitor contract workatory. (3) monitoring contract monitoring equipment installed and buried timely records after the initial reading, and accordObservg protection all drilling operations. 2) drill backfill: cement mortar or grout. 3) concrete: including concrete work at the vil engineering work, including (but not limited to): 1) drill: including monitoring hole drilling, borehole flushing, openinted cition, Embedment drilling, drilling, backfill, concrete pouring work. And monitoring equipment installation and laying of relaon instructions, complete the installation of monitoring equipment at the site and lay, as well as the necessary for installaervisiuipment installation, Embedment and the associated civil works construction drawings under this contract requirements and supe, and accessories) of procurement, and transport, and test, and custody, and Assembly, and rate set, work. (2) monitoring eqings requirements and supervision Department indicates, completed monitoring instrument equipment (including cablinstrument equipment of procurement, and test and rate set according to this technology terms provides, and construction draw, 施工单位自检:共完成水泥、砂、碎石、块石及止水等原材料检测92组,C15换填砼28天抗压强度检测18组、90天抗压强度检测2组,C15W4垫层砼28天抗压强度检测20组、90天抗压强度检测8组,C20W6防渗砼28天抗压强度检测167组、90天抗压强度检测18组,C15埋石砼28天抗压强度检测153组、90天抗压强度检测39组,埋石砼容重检测2组,各项检测指标均满足设计及规范要求。 业主(监理)单位抽检:共完成水泥、砂、碎石、块石及止水等原材料检测28组,C15抗压强度检测34组,C20抗压强度检测32组,各项检测指标均满足设计及规范要求。 3、施工单位自评结果 本分部工程共351个单元工程,根据《水利水电工程施工质量检验与评定规程》SL176-2007,施工单位自评单元工程质量全部合格,合格率100%,其中优良单元工程114个,单元工程优良率为32.5%;自评质量等级:合格。 4、监理单位复核意见 经复核351个单元工程质量全部合格,合格率100%,其中优良单元工程114个,单元工程优良率32.5%;原材料及中间产品质量合格,资料基本齐全。复核质量等级:合格。 5、分部工程质量等级评定意见 本分部工程共351个单元工程,原材料及中间产品质量合格,施工中无质量事故、质量缺陷和安全事故;单元工程经施工单位自评质量等级合格,监理单位复核质量等级合格,项目法人认定质量等级合格。分部工程质量等级评定意见:合格。 六、验收遗留问 快递公司问题件快递公司问题件货款处理关于圆的周长面积重点题型关于解方程组的题及答案关于南海问题 及处理意见: 无。 七、验收结论: 依据《水利水电建设工程验收规程》(SL223-2008)要求,验收组通过现场查看、核查资料后一致认为,该分部工程已按设计及合同约定全部完成施工,施工 工艺 钢结构制作工艺流程车尿素生产工艺流程自动玻璃钢生产工艺2工艺纪律检查制度q345焊接工艺规程 符合砼规范。施工后的质量符合设计及规范要求,资料基本齐全,施工中未发生质量和安全事故。本分部工程共划分为351个单元工程,质量全部合格,合格率100%,其中优良单元工程为114 个,单元工程优良率32.5%;原材料及中间产品质量合格。根据《水利水电工程施工质量检验与评定规程》(SL176-2007),分部工程质量等级评定为合格,验收工作组同意验收。 八、保留意见(保留意见人签字): 无 九、分部工程验收工作组成员签字表 附后 ing to the technical terms and the technical requirements to monitor contract workatory. (3) monitoring contract monitoring equipment installed and buried timely records after the initial reading, and accordObservg protection all drilling operations. 2) drill backfill: cement mortar or grout. 3) concrete: including concrete work at the vil engineering work, including (but not limited to): 1) drill: including monitoring hole drilling, borehole flushing, openinted cition, Embedment drilling, drilling, backfill, concrete pouring work. And monitoring equipment installation and laying of relaon instructions, complete the installation of monitoring equipment at the site and lay, as well as the necessary for installaervisiuipment installation, Embedment and the associated civil works construction drawings under this contract requirements and supe, and accessories) of procurement, and transport, and test, and custody, and Assembly, and rate set, work. (2) monitoring eqings requirements and supervision Department indicates, completed monitoring instrument equipment (including cablinstrument equipment of procurement, and test and rate set according to this technology terms provides, and construction draw,
本文档为【水利分部工程验收鉴定书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_036899
暂无简介~
格式:doc
大小:23KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-09-18
浏览量:54