首页 生鲜农产品超市化经营提速

生鲜农产品超市化经营提速

举报
开通vip

生鲜农产品超市化经营提速生鲜农产品超市化经营提速 记者日前从省商务厅获悉,为加快推进农产品流通方式转变,构建布局合理、安全便捷的生鲜农产品零售流通网络,改善居民消费环境,提升消费水平,我省将着力推进生鲜农产品超市化经营。 考虑到各地生鲜农产品流通的实际情况,我省商务部门将根据各类消费群体的不同需求,利用现有城乡农贸市场(菜市场)和连锁超市已经形成的网点资源,支持具备条件的菜市场、农贸市场改建成生鲜超市;鼓励大型连锁超市向上游延伸,推进“农超对接”,建立具有稳定产销关系的蔬果、水产品、畜禽等多类型生鲜农产品供应基地,同时扩大生鲜农产品营...

生鲜农产品超市化经营提速
生鲜农产品超市化经营提速 记者日前从省商务厅获悉,为加快推进农产品流通方式转变,构建布局合理、安全便捷的生鲜农产品零售流通网络,改善居民消费环境,提升消费水平,我省将着力推进生鲜农产品超市化经营。 考虑到各地生鲜农产品流通的实际情况,我省商务部门将根据各类消费群体的不同需求,利用现有城乡农贸市场(菜市场)和连锁超市已经形成的网点资源,支持具备条件的菜市场、农贸市场改建成生鲜超市;鼓励大型连锁超市向上游延伸,推进“农超对接”,建立具有稳定产销关系的蔬果、水产品、畜禽等多类型生鲜农产品供应基地,同时扩大生鲜农产品营业面积,丰富经营品种,促进生鲜农产品安全、便利消费;支持农产品流通企业、农民专业合作社、农产品生产加工企业在居民小区设立生鲜农产品直销店,在连锁超市网点设立品牌生鲜农产品专柜或专销区。 此外,我省还将鼓励有条件的大型连锁超市企业、农产品流通企业建立或依托第三方电子商务平台开展网上交易,通过开设网上商城、专销店等方式,扩大本地农产品销售范围;支持连锁超市企业通过网上订购、门店取货等方式发展生鲜农产品电子商务,实现实体店与网络店深度融合,推动线上、线下互动发展。(鲍亮亮) (原标 快递公司问题件快递公司问题件货款处理关于圆的周长面积重点题型关于解方程组的题及答案关于南海问题 :生鲜农产品超市化经营提速) (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and (2) draw a purge system, confirmed by the supervising principal; (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check; (4) at the purging outlet cordon, by the person responsible for supervision; (5) set up a special panel of steam pipe blowing will be attended by a unified command, assigning their tasks; (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve; B. should warm-up before purging; C. check the expansion joints, thermal displacement of the spring hanger and pipe; D. used to purge the vapor temperature should not exceed the tubing operating temperature; E. purge steam should be heated ? cool ? reheating in the order; F. purge lines should be a blow out after blowing the next; G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is complete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme 2.1 installation program setup for static equipment for static equipment, see below. 2.2 the construction preparation 2.2.1 all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and component diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBy-pass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and
本文档为【生鲜农产品超市化经营提速】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_471618
暂无简介~
格式:doc
大小:70KB
软件:Word
页数:0
分类:
上传时间:2018-09-15
浏览量:3