首页 指南录后序翻译练习

指南录后序翻译练习

举报
开通vip

指南录后序翻译练习指南录后序翻译练习 指南录后序 1.德佑二年二月十九日,予除右丞相兼枢密使,都督诸路军马。 除: 都督: 路: 翻译: 2.时北兵已迫修门外,战、守、迁皆不及施。 迫: 施: 翻译: 3.缙( )绅、大夫、士萃于左丞相府,莫知计所出。 缙: 萃: 翻译: 4.会使辙交驰,北邀当国者相见,众谓予一行为可以纾( )祸。 会: 纾: 翻译: 5.国事至此,予不得爱身;意北亦尚可以口舌动也。 意: 可以: 翻译: 6.初,奉使往来,无留北者,予更欲一觇( )北,归而求救国之策; 觇: 而: 翻译...

指南录后序翻译练习
指南录后序 翻译 阿房宫赋翻译下载德汉翻译pdf阿房宫赋翻译下载阿房宫赋翻译下载翻译理论.doc 练习 指南录后序 1.德佑二年二月十九日,予除右丞相兼枢密使,都督诸路军马。 除: 都督: 路: 翻译: 2.时北兵已迫修门外,战、守、迁皆不及施。 迫: 施: 翻译: 3.缙( )绅、大夫、士萃于左丞相府,莫知计所出。 缙: 萃: 翻译: 4.会使辙交驰,北邀当国者相见,众谓予一行为可以纾( )祸。 会: 纾: 翻译: 5.国事至此,予不得爱身;意北亦尚可以口舌动也。 意: 可以: 翻译: 6.初,奉使往来,无留北者,予更欲一觇( )北,归而求救国之策; 觇: 而: 翻译: 7.于是辞相印不拜,翌( )日,以资政殿学士行。 翌日: 以: 翻译: 8.初至北营,抗辞慷慨,上下颇惊动,北亦未敢遽( )轻吾国。 慷慨: 遽: 翻译: rack, door (gate ... Pressure pipe and the metal structure installation 9.1 main engineering profile yongxing river level hydropower station pressure pipe pipeline plane Shang along Ridge is line layout, and slope surface contour close vertical, Guan Po with original ground line changes, used open type Ming tube, single tube joint water way, competent diameter 1.3M, long 931.00m, two root non-symmetric "Bu" type support tube, diameter 0.8M, single root long 8.3M. Competent to establish 12 town Pier, 107 buttress, telescopic section 11. Support Pier spacing 8M, side-sliding bearing. Town pier for the closed-end structure of gravity, base surface into bedrock, pipe excavation slope 1:0.75 with M5 grouted rubble slope protection, 0.3M, bottom side sewer, 0.25m wide, deep 0.3m,M5 grouted rubble masonry, set maintenance step ladder on the left side, 1.0M wide. Yongxinghe-? hydropower station penstock pipes arranged along the ridge line on the plane, and nearly vertical slope contour lines, Guan Po changes with the original ground line, with shallow backfill-pipe, single-pipe water supply, the competent 1.4m, long 1063.506m, two asymmetric "y" pipe, diameter 0.8M, single 10m. Competent to establish 12 town Pier, 8 expansion joint. Town pier for the closed-end structure of gravity, placed on soft rock base surface, pipe concrete C20 on a pedestal. Pipe trench excavation slope 1:0.75, after the installation of steel tube, compacted gravel backfill material to the surface, and 1:100 slope drainage to gutters. Gutter width 0.5M depth 0.5m,M5 grouted rubble masonry. 9.2 main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchong County yongxing River primary and secondary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex); 1.不幸吕师孟构恶于前,贾余庆献谄( )于后,予羁( )縻( )不得还,国事遂不可收拾。 句式: 构恶: 献谄: 羁縻: 翻译: 2.予自度( )不得脱,则直前诟( )虏帅失信,数( )吕师孟叔侄为逆,但欲求死,不复顾利害。 度: 直: 前: 诟: 数: 但: 顾: 利害: 翻译: 3.北虽貌敬,实则愤怒。二贵酋名曰“馆伴”,夜则以兵围所寓舍,而予不得归矣。 貌: 馆伴: 夜: 以: 翻译: 4.未几,贾余庆等以祈请使诣( )北,北驱予并往,而不在使者之目。 诣: 目: 翻译: 5.予分当引决,然而隐忍以行。昔人云:“将以有为也”。 分: 引决: 以: 翻译: 6.至京口,得间奔真州,即具以北虚实告东西二阃( ),约以连兵大举。 翻译: 7.中兴机会,庶几在此。留二日,维扬帅下逐客之令。 庶几: 翻译: 8.不得已,变姓名,诡踪迹,草行露宿,日与北骑相出没于长淮间。 诡: 草、露、日: 句式: 翻译: 9.穷饿无聊,追购又急,天高地迥,号呼靡及。 无聊: 购: 迥: 靡及: 翻译: rack, door (gate ... Pressure pipe and the metal structure installation 9.1 main engineering profile yongxing river level hydropower station pressure pipe pipeline plane Shang along Ridge is line layout, and slope surface contour close vertical, Guan Po with original ground line changes, used open type Ming tube, single tube joint water way, competent diameter 1.3M, long 931.00m, two root non-symmetric "Bu" type support tube, diameter 0.8M, single root long 8.3M. Competent to establish 12 town Pier, 107 buttress, telescopic section 11. Support Pier spacing 8M, side-sliding bearing. Town pier for the closed-end structure of gravity, base surface into bedrock, pipe excavation slope 1:0.75 with M5 grouted rubble slope protection, 0.3M, bottom side sewer, 0.25m wide, deep 0.3m,M5 grouted rubble masonry, set maintenance step ladder on the left side, 1.0M wide. Yongxinghe-? hydropower station penstock pipes arranged along the ridge line on the plane, and nearly vertical slope contour lines, Guan Po changes with the original ground line, with shallow backfill-pipe, single-pipe water supply, the competent 1.4m, long 1063.506m, two asymmetric "y" pipe, diameter 0.8M, single 10m. Competent to establish 12 town Pier, 8 expansion joint. Town pier for the closed-end structure of gravity, placed on soft rock base surface, pipe concrete C20 on a pedestal. Pipe trench excavation slope 1:0.75, after the installation of steel tube, compacted gravel backfill material to the surface, and 1:100 slope drainage to gutters. Gutter width 0.5M depth 0.5m,M5 grouted rubble masonry. 9.2 main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchong County yongxing River primary and secondary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex); 1.已而得舟,避渚( )洲,出北海,然后渡扬子江,入苏州洋,展转四明、天台,以至于永嘉。 渚洲: 至于: 2.呜呼~予之及于死者,不知其几矣~ 之: 其: 翻译: 3.诋( )大酋当死;骂逆贼当死;与贵酋处二十日,争曲直,屡当死; 诋: 曲直: 4.去京口,挟匕首以备不测,几自刭( )死;经北舰十余里,为巡船所物色,几从鱼腹死; 去: 以: 自刭: 物色: 为„„所„„: (句式) 5.真州逐之城门外,几彷徨死;如扬州,过瓜洲扬子桥,竟使遇哨,无不死; 彷徨: 如: 竟使: 6.扬州城下,进退不由,殆( )例送死;坐桂公塘土围中,骑数千过其门,几落贼手死; 殆: 例: 句式: 7.贾家庄几为巡徼( )所陵迫死;夜趋高邮,迷失道,几陷死;质明,避哨竹林中,逻者数十骑,几无所逃死; 质明: 句式:(1) (2) 陵: 翻译第一句: 8.至高邮,制府檄( )下,几以捕系死;行城子河,出入乱尸中,舟与哨相后先,几邂( )逅( )死;至海陵,如高沙,常恐无辜死;道海安、如皋,凡三百里,北与寇往来其间,无日而非可死; 以: 捕系: 句式: 邂逅: 无辜: 道: 9.至通州,几以不纳死;以小舟涉鲸波,出无可奈何,而死固付之度外矣~ 句式: 以:(1) (2) 固: 度: 翻译: 10.呜呼~死生,昼夜事也。死而死矣,而境界危恶,层见错出,非人世所堪。痛定思痛,痛何如哉~ 句式: 而:(1) (2) 境界: 见: 堪: 翻译: rack, door (gate ... Pressure pipe and the metal structure installation 9.1 main engineering profile yongxing river level hydropower station pressure pipe pipeline plane Shang along Ridge is line layout, and slope surface contour close vertical, Guan Po with original ground line changes, used open type Ming tube, single tube joint water way, competent diameter 1.3M, long 931.00m, two root non-symmetric "Bu" type support tube, diameter 0.8M, single root long 8.3M. Competent to establish 12 town Pier, 107 buttress, telescopic section 11. Support Pier spacing 8M, side-sliding bearing. Town pier for the closed-end structure of gravity, base surface into bedrock, pipe excavation slope 1:0.75 with M5 grouted rubble slope protection, 0.3M, bottom side sewer, 0.25m wide, deep 0.3m,M5 grouted rubble masonry, set maintenance step ladder on the left side, 1.0M wide. Yongxinghe-? hydropower station penstock pipes arranged along the ridge line on the plane, and nearly vertical slope contour lines, Guan Po changes with the original ground line, with shallow backfill-pipe, single-pipe water supply, the competent 1.4m, long 1063.506m, two asymmetric "y" pipe, diameter 0.8M, single 10m. Competent to establish 12 town Pier, 8 expansion joint. Town pier for the closed-end structure of gravity, placed on soft rock base surface, pipe concrete C20 on a pedestal. Pipe trench excavation slope 1:0.75, after the installation of steel tube, compacted gravel backfill material to the surface, and 1:100 slope drainage to gutters. Gutter width 0.5M depth 0.5m,M5 grouted rubble masonry. 9.2 main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchong County yongxing River primary and secondary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex); 1.予在患难中,间( )以诗记所遭,今存其本不忍废。道中手自抄录。 间: 以: 2.使北营,留北关外,为一卷;发北关外,历吴门、毗( )陵,渡瓜洲,复还京口,为一卷;脱京口,趋真州、扬州、高邮、泰州、通州,为一卷;自海道至永嘉、来三山,为一卷。 3.将藏之于家,使来者读之,悲予志焉。 于: 来者: 悲: 翻译: 4.呜呼~予之生也幸,而幸生也何为, 之: 幸: 而: 句式: 翻译: 5.所求乎为臣,主辱,臣死有余僇( );所求乎为子,以父母之遗( )体行殆,而死有余责。 殆: 僇: 翻译: 6.将请罪于君,君不许;请罪于母,母不许。请罪于先人之墓,生无以救国难,死犹为厉鬼以击贼,义也; 句式: 无以: 翻译: 7.赖天之灵,宗庙之福,修我戈矛,从王于师,以为前驱,雪九庙之耻,复高祖之业,所谓誓不与贼俱生,所谓鞠躬尽力,死而后已,亦义也。 赖: 修: 以为: 前驱: 鞠躬: 已: 句式: 翻译: 8.嗟夫~若予者,将无往而不得死所矣。 翻译: rack, door (gate ... Pressure pipe and the metal structure installation 9.1 main engineering profile yongxing river level hydropower station pressure pipe pipeline plane Shang along Ridge is line layout, and slope surface contour close vertical, Guan Po with original ground line changes, used open type Ming tube, single tube joint water way, competent diameter 1.3M, long 931.00m, two root non-symmetric "Bu" type support tube, diameter 0.8M, single root long 8.3M. Competent to establish 12 town Pier, 107 buttress, telescopic section 11. Support Pier spacing 8M, side-sliding bearing. Town pier for the closed-end structure of gravity, base surface into bedrock, pipe excavation slope 1:0.75 with M5 grouted rubble slope protection, 0.3M, bottom side sewer, 0.25m wide, deep 0.3m,M5 grouted rubble masonry, set maintenance step ladder on the left side, 1.0M wide. Yongxinghe-? hydropower station penstock pipes arranged along the ridge line on the plane, and nearly vertical slope contour lines, Guan Po changes with the original ground line, with shallow backfill-pipe, single-pipe water supply, the competent 1.4m, long 1063.506m, two asymmetric "y" pipe, diameter 0.8M, single 10m. Competent to establish 12 town Pier, 8 expansion joint. Town pier for the closed-end structure of gravity, placed on soft rock base surface, pipe concrete C20 on a pedestal. Pipe trench excavation slope 1:0.75, after the installation of steel tube, compacted gravel backfill material to the surface, and 1:100 slope drainage to gutters. Gutter width 0.5M depth 0.5m,M5 grouted rubble masonry. 9.2 main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchong County yongxing River primary and secondary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex); 1.向也使予委骨于草莽,予虽浩然无所愧怍( ),然微以自文于君亲,君亲其谓予何, 向: 使: 委: 浩然: 微: 句式: 其: 翻译: 2.诚不自意返吾衣冠,重见日月,使旦夕得正丘首,复何憾哉~复何憾哉~ 诚: 旦夕: 翻译: 3.是年夏五,改元景炎,庐陵文天祥自序其诗,名曰《指南录》。 是: 序: rack, door (gate ... Pressure pipe and the metal structure installation 9.1 main engineering profile yongxing river level hydropower station pressure pipe pipeline plane Shang along Ridge is line layout, and slope surface contour close vertical, Guan Po with original ground line changes, used open type Ming tube, single tube joint water way, competent diameter 1.3M, long 931.00m, two root non-symmetric "Bu" type support tube, diameter 0.8M, single root long 8.3M. Competent to establish 12 town Pier, 107 buttress, telescopic section 11. Support Pier spacing 8M, side-sliding bearing. Town pier for the closed-end structure of gravity, base surface into bedrock, pipe excavation slope 1:0.75 with M5 grouted rubble slope protection, 0.3M, bottom side sewer, 0.25m wide, deep 0.3m,M5 grouted rubble masonry, set maintenance step ladder on the left side, 1.0M wide. Yongxinghe-? hydropower station penstock pipes arranged along the ridge line on the plane, and nearly vertical slope contour lines, Guan Po changes with the original ground line, with shallow backfill-pipe, single-pipe water supply, the competent 1.4m, long 1063.506m, two asymmetric "y" pipe, diameter 0.8M, single 10m. Competent to establish 12 town Pier, 8 expansion joint. Town pier for the closed-end structure of gravity, placed on soft rock base surface, pipe concrete C20 on a pedestal. Pipe trench excavation slope 1:0.75, after the installation of steel tube, compacted gravel backfill material to the surface, and 1:100 slope drainage to gutters. Gutter width 0.5M depth 0.5m,M5 grouted rubble masonry. 9.2 main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchong County yongxing River primary and secondary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex);
本文档为【指南录后序翻译练习】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_594905
暂无简介~
格式:doc
大小:34KB
软件:Word
页数:10
分类:生活休闲
上传时间:2018-01-14
浏览量:168