首页 联想lenovo V450拆机方法

联想lenovo V450拆机方法

举报
开通vip

联想lenovo V450拆机方法联想lenovo V450拆机方法 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, m...

联想lenovo V450拆机方法
联想lenovo V450拆机方法 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) ??树下心得分享(八):V450简易拆机?? 机器到手都一段时间了,之前因为论坛有活动,很多网友踊跃参加,所以小 弟就没有发拆机帖。不过机器到手都一段时间了,而且我家靠近马路,尘埃比较 大,所以想给散热器清理一下尘埃,顺便献丑发个拆机教程帖。(*^__^*)...嘻嘻 我准备的工具: 从图中看到我的工具很简约哦~小号的一字螺丝刀与十字螺丝刀各一个,还 有一把烤鸡翅用的酱油刷。 底盖拆卸以及散热器清理: security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) V450的底部-散热器那里底盖的螺丝三颗、硬盘底盖螺丝两颗、无线模块底盖 两颗、光驱固定螺丝一颗(暂时看不到光驱固定螺丝)。 open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 散热器底盖拆开看到左下侧的内存、散热铜管末端是处理器、中端是北桥、 末端是GPU芯片。 底盖连图: security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 从连图中我们可以看到底盖的构造,而底盖的三颗螺丝中,有两颗是用卡簧固定在底盖,这样的设计可以免去了我们如何存放螺丝的烦恼哦~第三颗螺丝是沉头的,他有特别的作用。从内部结构图看到,散热铜管是弯曲设计的,在GPU芯片那里的空间很有限,不能做一个特别大的散热片或者外加弹性压片,而沉头螺丝的作用就是把图中的弹性压片压下。(主要是因为空间限制才这样设计的。)弹性压片的作用是让散热片与GPU表面更好接触,好处是不会压坏芯片,不过因为压片是单边的,所以可能存在受力不均问 快递公司问题件快递公司问题件货款处理关于圆的周长面积重点题型关于解方程组的题及答案关于南海问题 哦~处理器那里的压片是四边的,所以受压均匀。 今天拆机重点是清尘,散热风扇由三颗螺丝固定,只要拧开三颗螺丝就能取下散热风扇,这里需要注意别样散热器撞倒主板上哦,因为主板上的电子原件密集,碰撞容易造成损坏。 PS:这里需要注意一点-拆机前一定要把电池卸下,这个是为了避免在拆机过程中造成主板短路,要好好记住哦~ security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 散热风扇已经被拆卸下来了,散热风扇给我的感觉是比较薄,其次散热风扇 底座竟然是塑料材质。薄说明散热风扇的功率有限,塑料材质的风扇座导热性不 open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)如金属。散热风扇面盖有四个螺丝固定,拧开后可以拆除风扇,不过我没有拆开。 原因有两:1、我没有这么小的螺丝刀;2、我先用刷子清扫了一下里面的尘埃, 然后用气枪吹干净。当然仅仅用刷子不能清理到风叶的缝隙,我们可以使用棉签 一片片清理。 内存拆卸: 第一条我已经拆卸。 红框位置就是弹性压片,两边同时掰开内存就是自动弹高。 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 内存的安装需要先把内存完全插入内存槽,图中的卡位需要结合紧密以后直 接把内存往下压知道弹性压片把内存压住就安装好。 两条来自国内生产的三星DDRIII 1066内存。 open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 看到这些内存底部的条码我就头疼,我都不懂啥意思。(*^__^*)...嘻嘻 光驱拆卸: security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 第一次拆机的时候很奇怪,没有找到光驱的固定螺丝,后来请教了Zijj才知 道原来在橡胶塞子下面。那个橡胶塞子就是照片水印树下那个位置。 一字螺丝刀是时候出动了,看到橡胶塞子的一侧有缺口吧~我就是用螺丝刀 撬那地方。 open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 光驱没有把手,拧开螺丝以后如何把出来呢~直接对光驱舱口用力是很容易 损坏光驱,毕竟那是塑料构造。我采用的方法很简单,直接用螺丝刀撬用来固定 光驱的金属片,为了安全起见,我是一边撬一边拉的~如图。 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 光驱取出了,品牌是索尼的。 无线模块拆卸: open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 无线模块的底盖我就不多写了,螺丝也是有卡簧固定在底板上的。无线网络 有两条信号线出,分别是黑与白两色,第三条先我估计是蓝牙的信号线。(实际 情况需要完全拆卸才知道。) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 无线网卡的型号-我这款V450A-TFO采用的并非Intel无线模块,对于这里我 只能说批次问题吧~呵呵 第一次拆开的时候我也很惊讶,因为底部的扬声器竟然是这样向的~ 连图: open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 拧开两颗固定螺丝后可以拆卸无线模块。第二、三幅图是为了看清楚这里有 什么特别。无线信号线有套哦~而且是金属的,这个有防干扰作用。 硬盘拆卸: open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 硬盘底盖由两螺丝固定,拧开螺丝以后从右侧掰开底盖。底盖我觉得存在缺 陷-没有设计散热孔,至于硬盘架我也觉得不够完善,如果硬盘架没有圆孔,而 且做得更厚身,估计硬盘的热量大部分会集中于底部。(硬盘架也是散热片) 连图: security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 看图-然后网友拉,不过需要动用到两只手,一只手拉,一只手扶着硬盘,拉 的时候不需要太大力量。 硬盘架与硬盘之间帖了一张塑料膜,这是为了防止金属硬盘架与硬盘电路板 上的元件接触,说白了作用就是绝缘。 硬盘取下来了,西数320GB。 再不影响保修的前提下,一般人都能拆卸的硬件如下: security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 看懂了这些,那么我们以后升级内存、硬盘以及清理散热器都不需要找人了。 自己动手丰衣足食~(*^__^*)...嘻嘻 open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) PS:本来想把键盘也拆卸的,但是V450的键盘是防水的一体化设计,拆卸 很麻烦。 V450优缺点: 整机给人很厚道的感觉,触控板很人性化,内置扬声器音效不错,接口齐全。 硬盘散热有待改进,屏幕面板与上盖结合不够紧密,从旁边看有点漏光,但是不 影响使用。3个USB接口相对来说少了点,如果有四个就更好。 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)
本文档为【联想lenovo V450拆机方法】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_882336
暂无简介~
格式:doc
大小:1020KB
软件:Word
页数:94
分类:生活休闲
上传时间:2017-09-25
浏览量:31