首页 瓷砖胶施工工艺

瓷砖胶施工工艺

举报
开通vip

瓷砖胶施工工艺瓷砖胶施工工艺 瓷砖胶,并不是大家所说的水泥加胶水,这是一种错误的认知。瓷砖粘结剂是一种以水泥作为胶凝剂、添加多种高分子聚合物和无机粉料作保水剂、粘结剂面制成的新型瓷砖粘结剂,适用于瓷砖的薄层粘结。瓷砖胶的特点 11、采用齿型刮刀双面刮胶浆,薄层满浆粘贴,具特强的粘结力和良好的韧性,可牢固粘贴文化石,人造石,吸水率较高的石材,省料安全,减少建筑垃圾和楼层负重,避免空鼓导致的因积水、剥落等问题。22、不用浸砖湿墙,一次梳刮1?即可粘贴多块瓷砖,明显提高工效,施工方便快捷。33、具优良的抗渗性与抗老化性能,减少返浆...

瓷砖胶施工工艺
瓷砖胶施工工艺 瓷砖胶,并不是大家所说的水泥加胶水,这是一种错误的认知。瓷砖粘结剂是一种以水泥作为胶凝剂、添加多种高分子聚合物和无机粉料作保水剂、粘结剂面制成的新型瓷砖粘结剂,适用于瓷砖的薄层粘结。瓷砖胶的特点 11、采用齿型刮刀双面刮胶浆,薄层满浆粘贴,具特强的粘结力和良好的韧性,可牢固粘贴文化石,人造石,吸水率较高的石材,省料安全,减少建筑垃圾和楼层负重,避免空鼓导致的因积水、剥落等问题。22、不用浸砖湿墙,一次梳刮1?即可粘贴多块瓷砖,明显提高工效,施工方便快捷。33、具优良的抗渗性与抗老化性能,减少返浆挂泪等污染饰面现象,提高墙体的防水抗渗能力。44、成品包装,加水搅拌即可,无须现场配料混合,确保产品质量,保持现场清洁卫生。55、瓷砖胶施工包装规格:25KG/包,包装瓷砖胶施工工艺 1首先将经过预选的瓷砖背面清理干净,并检查粘贴基面。基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。2铺贴开始前还应当在墙面找平层上吊垂线,以确定瓷砖的出墙尺寸线,并拉水平线,这样铺贴时既能够做到表面平整,又能够做到瓷砖横平竖直。确保基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。3用25kg的乐匠瓷砖胶粉加入水量约为7~7.5kg,用电动搅拌器搅拌成均匀无颗粒的胶浆,放置3~5分钟再搅拌一次。粘接材料不宜过稠,否则不容易摊开,同时也不宜太稀,否则瓷砖粘贴无法固定,容易坠下来。4用齿型刮刀将胶浆均匀的刮抹于面上,每次刮抹约1?,然后将瓷砖揉压于面上。5如用于背沟较深的瓷砖或石材,还应用齿型刮刀在砖背面抹胶浆,以保证满浆粘贴。6根据整个瓷砖墙面污染的情况,可用清水擦洗表面。 注意事项 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the 1、适宜施工温度为5~40?,施工前先确认底材的垂直度及平整度。2、切忌将已干结的膏浆加水混合再用,砖面残余的胶浆应及时用微湿海绵清理干净。3、施工后至少12小时内防止雨淋、暴晒及霜冻。4、用于旧瓷砖或石材面,以及石膏板等基面粘贴前应先确认基面原附着强度以及墙体牢固度,必须于大面积施工前先进行粘贴试验后再使用。 瓷砖胶,并不是大家所说的水泥加胶水,这是一种错误的认知。瓷砖粘结剂是一种以水泥作为胶凝剂、添加多种高分子聚合物和无机粉料作保水剂、粘结剂面制成的新型瓷砖粘结剂,适用于瓷砖的薄层粘结。瓷砖胶的特点 11、采用齿型刮刀双面刮胶浆,薄层满浆粘贴,具特强的粘结力和良好的韧性,可牢固粘贴文化石,人造石,吸水率较高的石材,省料安全,减少建筑垃圾和楼层负重,避免空鼓导致的因积水、剥落等问题。22、不用浸砖湿墙,一次梳刮1?即可粘贴多块瓷砖,明显提高工效,施工方便快捷。33、具优良的抗渗性与抗老化性能,减少返浆挂泪等污染饰面现象,提高墙体的防水抗渗能力。44、成品包装,加水搅拌即可,无须现场配料混合,确保产品质量,保持现场清洁卫生。55、瓷砖胶施工包装规格:25KG/包,包装瓷砖胶施工工艺 1首先将经过预选的瓷砖背面清理干净,并检查粘贴基面。基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。2铺贴开始前还应当在墙面找平层上吊垂线,以确定瓷砖的出墙尺寸线,并拉水平线,这样铺贴时既能够做到表面平整,又能够做到瓷砖横平竖直。确保基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。3用25kg的乐匠瓷砖胶粉加入水量约为7~7.5kg,用电动搅拌器搅拌成均匀无颗粒的胶浆,放置3~5分钟再搅拌一次。粘接材料不宜过稠,否则不容易摊开,同时也不宜太稀,否则瓷砖粘贴无法固定,容易坠下来。4用齿型刮刀将胶浆均匀的刮抹于面上,每次刮抹约1?,然后将瓷砖揉压于面上。5如用于背沟较深的瓷砖或石材,还应用齿型刮刀在砖背面抹胶浆,以保证满浆粘贴。6根据整个瓷砖墙面污染的 uring concrete, is strictly prohibited in the cabin with water. Concrete suspension and theen poerial thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. Whthan 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, mat reaterprocess should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is g(2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery ressive strength of 7d, 14d, 28D, and do a test recording, as information. grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the comp-graded concrete, each pouring a same-nt parts, with l~4ifferencrete slump control in the context of design drawings, according to the minimum value in different parts. According to the dte, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Cohe raatio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines tof concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement r ctionAre required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construregularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, cked,water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse sta security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservationolume r chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its vd the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must foo skibe higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and t pection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material shoulde, insn site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenancg; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and constructiocrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheetinconstruction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; con2 情况,可用清水擦洗表面。 注意事项 1、适宜施工温度为5~40?,施工前先确认底材的垂直度及平整度。2、切忌将已干结的膏浆加水混合再用,砖面残余的胶浆应及时用微湿海绵清理干净。3、施工后至少12小时内防止雨淋、暴晒及霜冻。4、用于旧瓷砖或石材面,以及石膏板等基面粘贴前应先确认基面原附着强度以及墙体牢固度,必须于大面积施工前先进行粘贴试验后再使用。 瓷砖胶,并不是大家所说的水泥加胶水,这是一种错误的认知。瓷砖粘结剂是一种以水泥作为胶凝剂、添加多种高分子聚合物和无机粉料作保水剂、粘结剂面制成的新型瓷砖粘结剂,适用于瓷砖的薄层粘结。瓷砖胶的特点 11、采用齿型刮刀双面刮胶浆,薄层满浆粘贴,具特强的粘结力和良好的韧性,可牢固粘贴文化石,人造石,吸水率较高的石材,省料安全,减少建筑垃圾和楼层负重,避免空鼓导致的因积水、剥落等问题。22、不用浸砖湿墙,一次梳刮1?即可粘贴多块瓷砖,明显提高工效,施工方便快捷。33、具优良的抗渗性与抗老化性能,减少返浆挂泪等污染饰面现象,提高墙体的防水抗渗能力。44、成品包装,加水搅拌即可,无须现场配料混合,确保产品质量,保持现场清洁卫生。55、瓷砖胶施工包装规格:25KG/包,包装瓷砖胶施工工艺 1首先将经过预选的瓷砖背面清理干净,并检查粘贴基面。基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。2铺贴开始前还应当在墙面找平层上吊垂线,以确定瓷砖的出墙尺寸线,并拉水平线,这样铺贴时既能够做到表面平整,又能够做到瓷砖横平竖直。确保基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。3用25kg的乐匠瓷砖胶粉加入水量约为7~7.5kg,用电动搅拌器搅拌成均匀无颗粒的胶浆,放置3~5分钟再搅拌一次。粘接材料不宜过稠,否则不容易摊 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and thewwW.doee-bearing.Com d7p9q 开,同时也不宜太稀,否则瓷砖粘贴无法固定,容易坠下来。4用齿型刮刀将胶浆均匀的刮抹于面上,每次刮抹约1?,然后将瓷砖揉压于面上。5如用于背沟较深的瓷砖或石材,还应用齿型刮刀在砖背面抹胶浆,以保证满浆粘贴。6根据整个瓷砖墙面污染的情况,可用清水擦洗表面。 注意事项 1、适宜施工温度为5~40?,施工前先确认底材的垂直度及平整度。2、切忌将已干结的膏浆加水混合再用,砖面残余的胶浆应及时用微湿海绵清理干净。3、施工后至少12小时内防止雨淋、暴晒及霜冻。4、用于旧瓷砖或石材面,以及石膏板等基面粘贴前应先确认基面原附着强度以及墙体牢固度,必须于大面积施工前先进行粘贴试验后再使用。 瓷砖胶,并不是大家所说的水泥加胶水,这是一种错误的认知。瓷砖粘结剂是一种以水泥作为胶凝剂、添加多种高分子聚合物和无机粉料作保水剂、粘结剂面制成的新型瓷砖粘结剂,适用于瓷砖的薄层粘结。瓷砖胶的特点 11、采用齿型刮刀双面刮胶浆,薄层满浆粘贴,具特强的粘结力和良好的韧性,可牢固粘贴文化石,人造石,吸水率较高的石材,省料安全,减少建筑垃圾和楼层负重,避免空鼓导致的因积水、剥落等问题。22、不用浸砖湿墙,一次梳刮1?即可粘贴多块瓷砖,明显提高工效,施工方便快捷。33、具优良的抗渗性与抗老化性能,减少返浆挂泪等污染饰面现象,提高墙体的防水抗渗能力。44、成品包装,加水搅拌即可,无须现场配料混合,确保产品质量,保持现场清洁卫生。55、瓷砖胶施工包装规格:25KG/包,包装瓷砖胶施工工艺 1首先将经过预选的瓷砖背面清理干净,并检查粘贴基面。基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。2铺贴开始前还应当在墙面找平层上吊垂线,以确定瓷砖的出墙尺寸线,并拉水平线,这样铺贴时既能够做到表面平整,又能够做到瓷砖横平竖直。确保基面应牢固、 uring concrete, is strictly prohibited in the cabin with water. Concrete suspension and theen poerial thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. Whthan 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, mat reaterprocess should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is g(2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery ressive strength of 7d, 14d, 28D, and do a test recording, as information. grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the comp-graded concrete, each pouring a same-nt parts, with l~4ifferencrete slump control in the context of design drawings, according to the minimum value in different parts. According to the dte, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Cohe raatio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines tof concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement r ctionAre required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construregularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, cked,water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse sta security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservationolume r chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its vd the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must foo skibe higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and t pection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material shoulde, insn site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenancg; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and constructiocrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheetinconstruction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; con4 平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。3用25kg的乐匠瓷砖胶粉加入水量约为7~7.5kg,用电动搅拌器搅拌成均匀无颗粒的胶浆,放置3~5分钟再搅拌一次。粘接材料不宜过稠,否则不容易摊开,同时也不宜太稀,否则瓷砖粘贴无法固定,容易坠下来。4用齿型刮刀将胶浆均匀的刮抹于面上,每次刮抹约1?,然后将瓷砖揉压于面上。5如用于背沟较深的瓷砖或石材,还应用齿型刮刀在砖背面抹胶浆,以保证满浆粘贴。6根据整个瓷砖墙面污染的情况,可用清水擦洗表面。 注意事项 1、适宜施工温度为5~40?,施工前先确认底材的垂直度及平整度。2、切忌将已干结的膏浆加水混合再用,砖面残余的胶浆应及时用微湿海绵清理干净。3、施工后至少12小时内防止雨淋、暴晒及霜冻。4、用于旧瓷砖或石材面,以及石膏板等基面粘贴前应先确认基面原附着强度以及墙体牢固度,必须于大面积施工前先进行粘贴试验后再使用。 瓷砖胶,并不是大家所说的水泥加胶水,这是一种错误的认知。瓷砖粘结剂是一种以水泥作为胶凝剂、添加多种高分子聚合物和无机粉料作保水剂、粘结剂面制成的新型瓷砖粘结剂,适用于瓷砖的薄层粘结。瓷砖胶的特点 11、采用齿型刮刀双面刮胶浆,薄层满浆粘贴,具特强的粘结力和良好的韧性,可牢固粘贴文化石,人造石,吸水率较高的石材,省料安全,减少建筑垃圾和楼层负重,避免空鼓导致的因积水、剥落等问题。22、不用浸砖湿墙,一次梳刮1?即可粘贴多块瓷砖,明显提高工效,施工方便快捷。33、具优良的抗渗性与抗老化性能,减少返浆挂泪等污染饰面现象,提高墙体的防水抗渗能力。44、成品包装,加水搅拌即可,无须现场配料混合,确保产品质量,保持现场清洁卫生。55、瓷砖胶施工包装规格:25KG/包,包装瓷砖胶施工工艺 1首先将经过预选的瓷砖背面清理干净,并检查粘贴基面。基面应牢固、平整、干 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and thewwW.doee-bearing.Com d7p9q 净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。2铺贴开始前还应当在墙面找平层上吊垂线,以确定瓷砖的出墙尺寸线,并拉水平线,这样铺贴时既能够做到表面平整,又能够做到瓷砖横平竖直。确保基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。3用25kg的乐匠瓷砖胶粉加入水量约为7~7.5kg,用电动搅拌器搅拌成均匀无颗粒的胶浆,放置3~5分钟再搅拌一次。粘接材料不宜过稠,否则不容易摊开,同时也不宜太稀,否则瓷砖粘贴无法固定,容易坠下来。4用齿型刮刀将胶浆均匀的刮抹于面上,每次刮抹约1?,然后将瓷砖揉压于面上。5如用于背沟较深的瓷砖或石材,还应用齿型刮刀在砖背面抹胶浆,以保证满浆粘贴。6根据整个瓷砖墙面污染的情况,可用清水擦洗表面。 注意事项 1、适宜施工温度为5~40?,施工前先确认底材的垂直度及平整度。2、切忌将已干结的膏浆加水混合再用,砖面残余的胶浆应及时用微湿海绵清理干净。3、施工后至少12小时内防止雨淋、暴晒及霜冻。4、用于旧瓷砖或石材面,以及石膏板等基面粘贴前应先确认基面原附着强度以及墙体牢固度,必须于大面积施工前先进行粘贴试验后再使用。 瓷砖胶,并不是大家所说的水泥加胶水,这是一种错误的认知。瓷砖粘结剂是一种以水泥作为胶凝剂、添加多种高分子聚合物和无机粉料作保水剂、粘结剂面制成的新型瓷砖粘结剂,适用于瓷砖的薄层粘结。瓷砖胶的特点 11、采用齿型刮刀双面刮胶浆,薄层满浆粘贴,具特强的粘结力和良好的韧性,可牢固粘贴文化石,人造石,吸水率较高的石材,省料安全,减少建筑垃圾和楼层负重,避免空鼓导致的因积水、剥落等问题。22、不用浸砖湿墙,一次梳刮1?即可粘贴多块瓷砖,明显提高工效,施工方便快捷。33、具优良的抗渗性与抗老化性能,减少返浆挂泪等污染饰面现象,提高墙体的防水抗渗能力。44、成品包装,加水搅拌即可,无须现场配料混合,确保产品质量,保持现场清洁卫生。55、瓷砖胶施工包装规 uring concrete, is strictly prohibited in the cabin with water. Concrete suspension and theen poerial thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. Whthan 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, mat reaterprocess should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is g(2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery ressive strength of 7d, 14d, 28D, and do a test recording, as information. grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the comp-graded concrete, each pouring a same-nt parts, with l~4ifferencrete slump control in the context of design drawings, according to the minimum value in different parts. According to the dte, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Cohe raatio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines tof concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement r ctionAre required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construregularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, cked,water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse sta security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservationolume r chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its vd the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must foo skibe higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and t pection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material shoulde, insn site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenancg; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and constructiocrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheetinconstruction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; con6 格:25KG/包,包装瓷砖胶施工工艺 1首先将经过预选的瓷砖背面清理干净,并检查粘贴基面。基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。2铺贴开始前还应当在墙面找平层上吊垂线,以确定瓷砖的出墙尺寸线,并拉水平线,这样铺贴时既能够做到表面平整,又能够做到瓷砖横平竖直。确保基面应牢固、平整、干净,无污染、松散物、空鼓等,有养护剂、脱模剂、较光滑的混凝土面需打磨粗糙后施工。3用25kg的乐匠瓷砖胶粉加入水量约为7~7.5kg,用电动搅拌器搅拌成均匀无颗粒的胶浆,放置3~5分钟再搅拌一次。粘接材料不宜过稠,否则不容易摊开,同时也不宜太稀,否则瓷砖粘贴无法固定,容易坠下来。4用齿型刮刀将胶浆均匀的刮抹于面上,每次刮抹约1?,然后将瓷砖揉压于面上。5如用于背沟较深的瓷砖或石材,还应用齿型刮刀在砖背面抹胶浆,以保证满浆粘贴。6根据整个瓷砖墙面污染的情况,可用清水擦洗表面。 注意事项 1、适宜施工温度为5~40?,施工前先确认底材的垂直度及平整度。2、切忌将已干结的膏浆加水混合再用,砖面残余的胶浆应及时用微湿海绵清理干净。3、施工后至少12小时内防止雨淋、暴晒及霜冻。4、用于旧瓷砖或石材面,以及石膏板等基面粘贴前应先确认基面原附着强度以及墙体牢固度,必须于大面积施工前先进行粘贴试验后再使用。 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and thewwW.doee-bearing.Com d7p9q
本文档为【瓷砖胶施工工艺】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_842972
暂无简介~
格式:doc
大小:61KB
软件:Word
页数:20
分类:生活休闲
上传时间:2017-11-12
浏览量:33