nullnullCalculation For 12-Week Rolling MTBF Using Weibull Analysis ToolnullCalculation For 12-Week Rolling MTBF Using Weibull Analysis ToolnullCalculation For 12-Week Rolling MTBF Using Weibull Analysis ToolPresent: Observed MTBF MethodIncorporating Credit-MTBF together with 12-Week Rolling MTBF Present: Observed MTBF MethodTIMEMTBF =1265KMTBF =1265K2 Failures DetectedMTBF=600KT0T12NOT TO SCALEProposed: Credit MTBF Method
Weibayes Method and Beta=0.55Incorporating Credit-MTBF together with 12-Week Rolling MTBF Credit MTBF Proposed: Credit MTBF Method
Weibayes Method and Beta=0.55TIMEMTBF =1265KMTBF =1265K2 Failures DetectedMTBF=600KT0T12NOT TO SCALEBasic Credit Rate Calculation
Weibayes Method and Beta=0.55Incorporating Credit-MTBF together with 12-Week Rolling MTBF TIMEMTBF =1,265KMTBF =1,265K2 Failures DetectedMTBF=600K = (1265-600)
= 665 KT0T12Credit Rate= 665 / 12
=55.4K / weekBasic Credit Rate Calculation
Weibayes Method and Beta=0.5512 Weeks WindowsNOT TO SCALEProposed New Plotting MethodIncorporating Credit-MTBF together with 12-Week Rolling MTBF Proposed New Plotting MethodUsing Weibayes method and assumed beta =0.55
For zero failure, MTBF=1,265K (12 Weeks Testing).
@ T0, 2 failures detected and the estimated MTBF dropped to 600K level.
MTBF increment (e.g. 55.4K) will be added weekly if no additional failure detected.
@ T12, the MTBF will reach 1,265K level if no additional failure detected.
本文档为【MTBF Calculation】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。