首页 蔬菜水果图片大全

蔬菜水果图片大全

举报
开通vip

蔬菜水果图片大全蔬菜水果图片大全 cabbage construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specific...

蔬菜水果图片大全
蔬菜水果图片大全 cabbage construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on celery construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on spinach construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on cucumber construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on pumpkin construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on potato construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on carrot construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on eggplant construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on tomato construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on mushroom construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on pepper construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on cherry construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on coconut construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on grape construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on Garlic construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on onion construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on peach construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on kiwi fruit construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on Lemon construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on leechee construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on pineapple construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
本文档为【蔬菜水果图片大全】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_447713
暂无简介~
格式:doc
大小:536KB
软件:Word
页数:46
分类:生活休闲
上传时间:2017-09-26
浏览量:136