首页 地下室地面做法施工方案

地下室地面做法施工方案

举报
开通vip

地下室地面做法施工方案地下室地面做法施工方案 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name ...

地下室地面做法施工方案
地下室地面做法施工 方案 气瓶 现场处置方案 .pdf气瓶 现场处置方案 .doc见习基地管理方案.doc关于群访事件的化解方案建筑工地扬尘治理专项方案下载 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边用地改造A区 工程 路基工程安全技术交底工程项目施工成本控制工程量增项单年度零星工程技术标正投影法基本原理 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 中国建筑第六工程局有限公司 the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be lities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as liftingfaci es and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good groundingjacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cabl raulicted standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updaf prohand ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal oon operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, down the content strictly according to the tower crane, remove programme implementati-8 content security technology to give the low-2-down (reference tables) construction construction construction organization name project name 4-y technology gives the lowsafet Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower cranepport; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time ble suot to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliawear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, nhould d check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Seams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you shoulns, ba timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete colum el wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting ine, wheblender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cagises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a er, rdown the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopp-7 content security technology to give the low-2-e ... Construction construction construction organization name project name 4ed acceptance not made the next processes work; 10, the construction sitshall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualifi 中国建筑第六工程局有限公司 1 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 目 录 会 签 表 ........................................................................................................................0 土方回填方案审批表 ............................................................................................................1 第一章、编制依据 ................................................................................................................2 1.1、施工图纸 ...............................................................................................................2 ...............................................................................3 1.2、主要规范 ................................ 1.3、主要 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 ...............................................................................................................4 第二章 、工程概况 ..............................................................................................................4 2.1、工程概况 ...............................................................................................................4 2.2、工程特点 ...............................................................................................................5 2.3、回填方案 ...............................................................................................................5 2.4、回填材料选择 .......................................................................................................5 第三章 、施工组织 ..............................................................................................................6 3.1、施工总体部署 .......................................................................................................6 3.2、项目部组织机构 ...................................................................................................6 3.3、施工流程 ...............................................................................................................6 3.4、人员及机械准备 ...................................................................................................6 第四章、土方回填施工 ........................................................................................................7 4.1、施工场地内的土方临时倒土点布置 ................................ 7 4.2、外保护墙支护 .......................................................................................................9 4.3、土方回填做法 .....................................................................................................10 4.4、土方的夯实 .........................................................................................................10 4.5、降水井的处理 ..................................................................................................... 11 4.6、土方回填注意事项 ............................................................................................ 11 第五章、保证措施 .............................................................................................................. 11 5.1、质量保证措施 ..................................................................................................... 11 5.2、安全保证措施 .....................................................................................................12 中国建筑第六工程局有限公司 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 降 水 井 附 图 ................................................................................. 错误~未定义 关于书的成语关于读书的排比句社区图书漂流公约怎么写关于读书的小报汉书pdf 签。 1 中国建筑第六工程局有限公司 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 会 签 表 工程名称:吉林省驻大连办事处原址及周边用地改造A区工程 方案名称 土方回填方案 建筑面积 67085平方米 结构型式 框架-核心筒 层 数 地下3层 地上29层 编制: 年 月 日 审核: 年 月 日 中国建筑第六工程局有限公司 0 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 审批: 年 月 日 土方回填方案审批表 吉林省驻大连办事处原址及周边工程名称 结构类型 框架-核心筒 用地改造A区工程 北京方圆工程监理 建设单位 大连绿城置业有限公司 监理单位 有限公司 浙江绿城东方建筑设计 大连市勘察测绘研究院设计单位 勘察单位 有限公司 有限公司 施工单位 中国建筑第六工程局有限公司 编制时间 2013年9月1日 编制人 齐华鑫 1 中国建筑第六工程局有限公司 1 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 监理单位审批意见: 审批人: 年 月 日 建设单位审批意见: 审批人: 年 月 日 第一章、编制依据 1.1、施工图纸 are secure. Scaffolding erection firmly, not swing. Suspended operations, tools should be placed pants, hands directly contact with live long, oily materials of asphalt; Before the work, should check whether the tools used down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2-e tables) construction construction construction organization name project name 4down (referenc-teams from the deposit of an instrument, and filed a report. Waterproofing construction technology to give the low safety disclosure; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, n sitee closed, screwed on safety cover, job locations, confirm the no fire hazard, shall not be left; 12, targeted the constructioic substances are containers or pipes must be cleaned and all the pores open; 11, end of the job, the cylinder valve should be, toxnd pipe welding, welding electric device you must first cut off the power supply; 10, welded storage of inflammable, explosivlene, must not be put in a metal container to prevent gases burning accident; Is strictly prohibited in the pressure vessel acetyion, torch mouth were forbidden from people burning torches shall not be placed on the workpiece or ground. With oxygen and acontaminated oils; Gas bottle purchase, transport, storage and use must be strictly enforcing the relevant regulations; Ignit-ns, nothat the leak, use soapy water, open flame is strictly prohibited; Oxygen cylinder, oxygen gauge and welding and cutting tool5M, no flat, no exposure, away from inflammable and explosive materials and fire distance shall not be less than 10m, verify tempering devices, distance between acetylene and oxygen cylinders shall not be less than-nstalled pressure reducing valve and antiwelding, testing shall be approved by the relevant departments, with the permission of welding; Acetylene cylinders must be ifighting equipment; Must be non flammable gas or liquid when -e, or cover, isolation, and in the welding area is equipped with fireis not examined no welding operations; Welding jobs must deal with hot and approval procedures; Welding site clear inflammabldown the content gas welders must hold special certificates, operating certificate expires -14 content security technology to give the low-2-9 ... Construction construction construction organization name project name 4-2-on organization name project name 4down (reference tables) construction construction constructi-evator installation and removal of security technology to give the lowiver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. External use elety disclosure; 13, the other. Disclosure signatures to accept cards delhomework, not qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site saf 2 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 序号 图纸名称 图纸日备注 期 1 吉林省政府驻大连办事处原址及周边改造A区工程2013.2 建筑图 2 吉林省政府驻大连办事处原址及周边改造A区工程2013.2 结构图 1.2、主要规范 类 名 称 编 号 别 建筑地基基础设计规范 GB50007-2002 建筑地基基础工程施工质量验收规范 GB50202-2002 《施工现场临时用电安全技术规范》 JGJ 46-2005 国家 工程测量规范 GBJ50026-2007 建筑工程施工质量验收统一标准 GB50300-2002 建筑机械使用安全技术规程 JGJ33-2002 JGJ59-2011 建筑施工安全检查标准 1 中国建筑第六工程局有限公司 3 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 施工现场临时用电技术规范 JGJ46-2005 1.3、主要标准 类 别 名 称 编 号 国家 《建筑工程施工质量验收统一标准》 GB50300-2001 行业 《建筑施工安全检查标准》 JGJ59-2001 地方 《文明工地标准》 第二章、工程概况 2.1、工程概况 工程名称:吉林省政府驻大连办事处原址及周边用地改造A区; 工程地点:大连市沙可口区高尔基路南侧; 建设单位:大连绿城置业有限公司 设计单位:浙江绿城东方建筑设计有限公司; 监理单位:北京方圆工程监理有限公司 施工单位:中国建筑第六工程局有限公司 工程概要:吉林省政府驻大连办事处原址及周边用地改造A区项目位于大连市沙可口区高尔基路南侧,东至金融商务区一号路,西临中山路,南至城市绿化带。本项目总用地面积9180平方米,其中分为两个区块,分别以A、B地块标识,按照《吉林省政府驻大连办事处原址及周边用地改造规划设计条件》 规定 关于下班后关闭电源的规定党章中关于入党时间的规定公务员考核规定下载规定办法文件下载宁波关于闷顶的规定 ,两块用地统一改造,其中A地块为办are secure. Scaffolding erection firmly, not swing. Suspended operations, tools should be placed pants, hands directly contact with live long, oily materials of asphalt; Before the work, should check whether the tools used down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2-e tables) construction construction construction organization name project name 4down (referenc-teams from the deposit of an instrument, and filed a report. Waterproofing construction technology to give the low safety disclosure; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, n sitee closed, screwed on safety cover, job locations, confirm the no fire hazard, shall not be left; 12, targeted the constructioic substances are containers or pipes must be cleaned and all the pores open; 11, end of the job, the cylinder valve should be, toxnd pipe welding, welding electric device you must first cut off the power supply; 10, welded storage of inflammable, explosivlene, must not be put in a metal container to prevent gases burning accident; Is strictly prohibited in the pressure vessel acetyion, torch mouth were forbidden from people burning torches shall not be placed on the workpiece or ground. With oxygen and acontaminated oils; Gas bottle purchase, transport, storage and use must be strictly enforcing the relevant regulations; Ignit-ns, nothat the leak, use soapy water, open flame is strictly prohibited; Oxygen cylinder, oxygen gauge and welding and cutting tool5M, no flat, no exposure, away from inflammable and explosive materials and fire distance shall not be less than 10m, verify tempering devices, distance between acetylene and oxygen cylinders shall not be less than-nstalled pressure reducing valve and antiwelding, testing shall be approved by the relevant departments, with the permission of welding; Acetylene cylinders must be ifighting equipment; Must be non flammable gas or liquid when -e, or cover, isolation, and in the welding area is equipped with fireis not examined no welding operations; Welding jobs must deal with hot and approval procedures; Welding site clear inflammabldown the content gas welders must hold special certificates, operating certificate expires -14 content security technology to give the low-2-9 ... Construction construction construction organization name project name 4-2-on organization name project name 4down (reference tables) construction construction constructi-evator installation and removal of security technology to give the lowiver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. External use elety disclosure; 13, the other. Disclosure signatures to accept cards delhomework, not qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site saf 4 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 公用地,面积为7250平方米,计容积率,B地块为社会停车场,面积为1930平方米。本工程为地上29层,建筑高度为126.20m、地下3层,建筑高度为14.60m的一幢类矩形塔楼,其中裙房为3层。总建筑面积为67085平方米,其中地上建筑面积为45425平方米,地下建筑面积为21660平方米(其中47125平方米计容积率),容积率为6.5. 2.2、工程特点 本工程场地狭窄且基坑为深基坑,回填土方深度初步定为16米,即从基坑底部排水沟到地下室顶板,其中排水沟500mm,地下三层底板厚1m,地下室结构净深度为14.6m,初步计算总填土量为20000m?。地下室外壁做1.5mm厚聚氨酯,贴3cm厚防水卷材,为保 砌筑一层120mm厚砖墙,护防水层,紧贴防水卷材设置一层挤塑板作为保护层,保护层外 在回填之前进行。 2.3、回填方案 回填土用机械挖运至场内,再用人工与机械配合分层回填夯实的施工方案,回填取土方采用挖掘机开挖并装车,自卸式汽车转运至场内。机械配合人工夯实。 2.4、回填材料选择 1、土料 采用本地常用回填材料山皮石,并清除其中的有机杂质和粒径大于50mm的颗粒,含水量应满足要求。 2、石屑 不含有机杂质,粒径不大于50mm。 3、淤泥和淤泥质土不能做回填土。 1 中国建筑第六工程局有限公司 5 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 第三章、施工组织 3.1、施工总体部署 为了更快速、高效、保质、保量的完成土方回填工作,土方回填前,清除建筑物周围的所有木块、塑料等建筑杂物,并清除基坑周边的材料,尽量减轻基坑边缘附加荷载对基坑边缘产生附加应力影响。分段拆除周边安全防护栏杆,重新布置回填土方范围内安全警示标识并设专人指挥。 3.2、项目部组织机构 本工程配备了优秀而富有施工经验的工程管理及技术人员组成工程项目管理机构: 3.3、施工流程 回填土筛选—清理基坑—砌筑砖墙不高于3m—拆除基坑内脚手架—支撑外墙—弹线设标志—分层铺土—夯打密实—找平验收—重复此步骤最后找平验收。 土方项目经理 3.4、人员及机械准备 人员机械需用量表: 现场工长安全员are secure. Scaffolding erection firmly, not swing. Suspended operations, tools should be placed pants, hands directly contact with live long, oily materials of asphalt; Before the work, should check whether the tools used down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2-e tables) construction construction construction organization name project name 4down (referenc-teams from the deposit of an instrument, and filed a report. Waterproofing construction technology to give the low safety disclosure; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, n sitee closed, screwed on safety cover, job locations, confirm the no fire hazard, shall not be left; 12, targeted the constructioic substances are containers or pipes must be cleaned and all the pores open; 11, end of the job, the cylinder valve should be, toxnd pipe welding, welding electric device you must first cut off the power supply; 10, welded storage of inflammable, explosivlene, must not be put in a metal container to prevent gases burning accident; Is strictly prohibited in the pressure vessel acetyion, torch mouth were forbidden from people burning torches shall not be placed on the workpiece or ground. With oxygen and acontaminated oils; Gas bottle purchase, transport, storage and use must be strictly enforcing the relevant regulations; Ignit-ns, nothat the leak, use soapy water, open flame is strictly prohibited; Oxygen cylinder, oxygen gauge and welding and cutting tool5M, no flat, no exposure, away from inflammable and explosive materials and fire distance shall not be less than 10m, verify tempering devices, distance between acetylene and oxygen cylinders shall not be less than-nstalled pressure reducing valve and antiwelding, testing shall be approved by the relevant departments, with the permission of welding; Acetylene cylinders must be ifighting equipment; Must be non flammable gas or liquid when -e, or cover, isolation, and in the welding area is equipped with fireis not examined no welding operations; Welding jobs must deal with hot and approval procedures; Welding site clear inflammabldown the content gas welders must hold special certificates, operating certificate expires -14 content security technology to give the low-2-9 ... Construction construction construction organization name project name 4-2-on organization name project name 4down (reference tables) construction construction constructi-evator installation and removal of security technology to give the lowiver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. External use elety disclosure; 13, the other. Disclosure signatures to accept cards delhomework, not qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site saf 6土方作业队 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 人机名 序号 型号 单位 数量 备注 称 1 自卸汽车 辆 2 2 打夯机 台 4 3 挖掘机 台 2 4 装载机 30型 台 2 5 总协调指挥 人 1 6 土方负责人 人 1 7 现场监督人 人 1 8 运土司机 人 8 9 挖掘机司机 人 4 10 土工 人 20-25 11 现场电工 人 1 注:其它零星工具如铲子、锄头、箩框等根据现场需要配置。 第四章、土方回填施工 4.1、施工场地内的土方临时倒土点布置 根据施工场地特点,整个地下室外剪力墙周边土方回填共设置2个临时倒土点,将作业区分成2个区域,分别沿两个基坑方向进行回填,位置参见“土方回填平面布置图”。 1 中国建筑第六工程局有限公司 7 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 土方回填平面布置图 回填作业开始时,先将回填土用自卸式汽车运至倒土点倾倒,再用人工转运到需回填 的部位,按一定厚度进行分层回填夯实。 are secure. Scaffolding erection firmly, not swing. Suspended operations, tools should be placed pants, hands directly contact with live long, oily materials of asphalt; Before the work, should check whether the tools used down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2evator installation and removal of security technology to give the low-e tables) construction construction construction organization name project name 4down (referenc-teams from the deposit of an instrument, and filed a report. Waterproofing construction technology to give the low safety disclosure; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, n siteiver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. External use ele closed, screwed on safety cover, job locations, confirm the no fire hazard, shall not be left; 12, targeted the constructioic substances are containers or pipes must be cleaned and all the pores open; 11, end of the job, the cylinder valve should be, toxnd pipe welding, welding electric device you must first cut off the power supply; 10, welded storage of inflammable, explosivlene, must not be put in a metal container to prevent gases burning accident; Is strictly prohibited in the pressure vessel acetyion, torch mouth were forbidden from people burning torches shall not be placed on the workpiece or ground. With oxygen and acontaminated oils; Gas bottle purchase, transport, storage and use must be strictly enforcing the relevant regulations; Ignit-nety disclosure; 13, the other. Disclosure signatures to accept cards dels, nothat the leak, use soapy water, open flame is strictly prohibited; Oxygen cylinder, oxygen gauge and welding and cutting tool5M, no flat, no exposure, away from inflammable and explosive materials and fire distance shall not be less than 10m, verify tempering devices, distance between acetylene and oxygen cylinders shall not be less than-nstalled pressure reducing valve and antiwelding, testing shall be approved by the relevant departments, with the permission of welding; Acetylene cylinders must be ifighting equipment; Must be non flammable gas or liquid when -e, or cover, isolation, and in the welding area is equipped with firehomework, not qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site safis not examined no welding operations; Welding jobs must deal with hot and approval procedures; Welding site clear inflammabldown the content gas welders must hold special certificates, operating certificate expires -14 content security technology to give the low-2-9 ... Construction construction construction organization name project name 4-2-on organization name project name 4down (reference tables) construction construction constructi- 8 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 根据平面布置,有部分土方运输需要从地下室顶板上经过,为满足结构安全要求,需要在汽车经过道路范围内在地下一层进行支撑加固。搭设时采用φ48*3.5钢管扣件脚手架支撑,立杆纵横间距1000mm,水平杆步距不大于1500mm,横向剪刀撑连续设置,加固长度按实际确定。 4.2、外保护墙支护 (1)、 为防止填土时土下落时对外保护墙冲击发生倒塌,在外保护墙砌筑好并达到要求强度以后,用木方进行支撑,具体做法为用适当长度木方,与保护墙一侧钉适当模板, 面如下图: 增大支撑面积,与基坑外壁链接处要做到保证安全,固定,不脱落。刨 (2)、为防止砖墙发生倒塌,每隔3米处砌筑240mm×240mm墙垛。砌筑砂浆采用M7.5混合砂浆。俯视图如下: 1 中国建筑第六工程局有限公司 9 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 保护墙身俯视图 保护墙支撑刨面图 4.3、土方回填做法 土方运至临时倒土点后,根据施工作业顺序安排,将运来的土方用人工配合机械分散至作业面铺开,适基坑作业宽度,能用抓钩机的地方尽量用抓钩机保证施工效率,在比较狭窄的作业面可以用人工配合溜槽施工,在钩机到达不了的区域采用塔吊配合人工施工,工人同时对土方内的不可降杂物进行清理。每次堆放土层厚度不超过500mm,形成一定工作面后,根据回填土的湿度,撒适量清水或待其干燥一定时间,使回填土达到手捏成团落地松散的湿度,然后用打夯机反复夯实,达到设计要求的密实度。 4.4、土方的夯实 摊平后的回填土必须立即夯实。夯实采用以机械为主,个别作业面不适合机械施工处采用人工夯实。夯实时按照纵、横两个方向进行,一夯压半夯,夯夯相连接,且夯位要压在前遍夯位的缝隙上。夯实遍数:打夯机每层夯实3—4遍。若经检验,密实度仍达不到要求,应继续夯压,直到符合要求为止,夯实应由四周开始,然后再夯向中间。 are secure. Scaffolding erection firmly, not swing. Suspended operations, tools should be placed pants, hands directly contact with live long, oily materials of asphalt; Before the work, should check whether the tools used down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2on organization name project name 4-e tables) construction construction construction organization name project name 4down (referenc-teams from the deposit of an instrument, and filed a report. Waterproofing construction technology to give the low safety disclosure; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, n sitedown (reference tables) construction construction constructie closed, screwed on safety cover, job locations, confirm the no fire hazard, shall not be left; 12, targeted the constructioic substances are containers or pipes must be cleaned and all the pores open; 11, end of the job, the cylinder valve should be, toxnd pipe welding, welding electric device you must first cut off the power supply; 10, welded storage of inflammable, explosivlene, must not be put in a metal container to prevent gases burning accident; Is strictly prohibited in the pressure vessel acetyion, torch mouth were forbidden from people burning torches shall not be placed on the workpiece or ground. With oxygen and acontaminated oils; Gas bottle purchase, transport, storage and use must be strictly enforcing the relevant regulations; Ignit-n-s, nothat the leak, use soapy water, open flame is strictly prohibited; Oxygen cylinder, oxygen gauge and welding and cutting tool5M, no flat, no exposure, away from inflammable and explosive materials and fire distance shall not be less than 10m, verify tempering devices, distance between acetylene and oxygen cylinders shall not be less than-nstalled pressure reducing valve and antiwelding, testing shall be approved by the relevant departments, with the permission of welding; Acetylene cylinders must be ifighting equipment; Must be non flammable gas or liquid when -e, or cover, isolation, and in the welding area is equipped with fireevator installation and removal of security technology to give the lowis not examined no welding operations; Welding jobs must deal with hot and approval procedures; Welding site clear inflammabldown the content gas welders must hold special certificates, operating certificate expires -14 content security technology to give the low-2-9 ... Construction construction construction organization name project name 4-2-iver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. External use elety disclosure; 13, the other. Disclosure signatures to accept cards delhomework, not qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site saf 10 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 4.5、降水井的处理 因土方回填后还要保持降水,因此保留降水井,具体个数及位置由监理、甲方、施工方现场确定,并由发包方安排完成水井布设。水井应采用无砂滤管把降水井引到地面,外100mm填充滤料,选用砾石或卵石, 粒径为10~30mm。降水井最后用砂回填。(详细做法见附图) 4.6、土方回填注意事项 1、地下室外墙防水及其保护墙经验收合格后方能进行土方回填。 2、严格掌握土壤的含水率,含水率较大的土壤待晾晒到适宜回填含水率时进行回填,以防发生橡皮土。 3、在回填过程中,安排3-4名工人,专职对车辆行驶的道路上的洒落土块进行清扫,并对路面洒水,防止扬尘,在回填过程中做好道路及作业现场保洁工作。 第五章、保证措施 5.1、质量保证措施 1 中国建筑第六工程局有限公司 11 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 5.2、安全保证措施 建立以项目经理为首的由专职安全员及各专业工长、施工班组长等人员参加的安全领导小组,负责施工现场安全及文明生产的管理,监督和协调工作。贯彻“安全第一,预防为主”的方针,•现场安全领导小组应定期组织现场安全文明生产检查,发现问题及时整改。 建立安全现场保卫小组,落实防盗措施,并由公司安全质量部协助项目组搞好治安、消防及保卫工作。 1、基坑下作业人员要戴好安全帽,系好帽带,作业区段基坑边应派专人监管,必要时将作业面上空封闭作业,防止物体打击。 2、对运土车辆机械,要有专人协调指挥,对驾驶员要进行书面交底,防止发生场内are secure. Scaffolding erection firmly, not swing. Suspended operations, tools should be placed pants, hands directly contact with live long, oily materials of asphalt; Before the work, should check whether the tools used down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2on organization name project name 4-e tables) construction construction construction organization name project name 4down (referenc-teams from the deposit of an instrument, and filed a report. Waterproofing construction technology to give the low safety disclosure; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, n sitedown (reference tables) construction construction constructie closed, screwed on safety cover, job locations, confirm the no fire hazard, shall not be left; 12, targeted the constructioic substances are containers or pipes must be cleaned and all the pores open; 11, end of the job, the cylinder valve should be, toxnd pipe welding, welding electric device you must first cut off the power supply; 10, welded storage of inflammable, explosivlene, must not be put in a metal container to prevent gases burning accident; Is strictly prohibited in the pressure vessel acetyion, torch mouth were forbidden from people burning torches shall not be placed on the workpiece or ground. With oxygen and acontaminated oils; Gas bottle purchase, transport, storage and use must be strictly enforcing the relevant regulations; Ignit-n-s, nothat the leak, use soapy water, open flame is strictly prohibited; Oxygen cylinder, oxygen gauge and welding and cutting tool5M, no flat, no exposure, away from inflammable and explosive materials and fire distance shall not be less than 10m, verify tempering devices, distance between acetylene and oxygen cylinders shall not be less than-nstalled pressure reducing valve and antiwelding, testing shall be approved by the relevant departments, with the permission of welding; Acetylene cylinders must be ifighting equipment; Must be non flammable gas or liquid when -e, or cover, isolation, and in the welding area is equipped with fireevator installation and removal of security technology to give the lowis not examined no welding operations; Welding jobs must deal with hot and approval procedures; Welding site clear inflammabldown the content gas welders must hold special certificates, operating certificate expires -14 content security technology to give the low-2-9 ... Construction construction construction organization name project name 4-2-iver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. External use elety disclosure; 13, the other. Disclosure signatures to accept cards delhomework, not qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site saf 12 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 吉林省政府驻大连办事处原址及周边改造A区工程 土方回填方案 交通事故,运输道路平坦畅通,施工点要有安全防护标识。 3、回填土施工过程中要悉心施工,确保防水层及保温板层不被机械或夯机损坏,提 高成品保护意识,圆满完成本次回填土工作。 4、加强现场临时用电安全的巡查力度,严格按照规范要求使用机具及布置线缆。 5、现场监督人要随时对土方回填质量进行监督,并管理好保洁工人做好路面及作业 现场的安全文明施工工作。 1 中国建筑第六工程局有限公司 13
本文档为【地下室地面做法施工方案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_597436
暂无简介~
格式:doc
大小:268KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-09-18
浏览量:8