首页 史上最全各种眼形眼线的画法,

史上最全各种眼形眼线的画法,

举报
开通vip

史上最全各种眼形眼线的画法,史上最全各种眼形眼线的画法, 各种眼形眼线的画法,史上最全~ the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do ...

史上最全各种眼形眼线的画法,
史上最全各种眼形眼线的画法, 各种眼形眼线的画法,史上最全~ the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use : the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 平价的 我说的那个 哪里都有得卖 10块左右 5元是假的 俺命的店有卖 20 块 这个画起来很黑 很下墨 请容我这么解释 呼呼 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 不用看懂 亲们 拿起笔 看着图 自己化 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 有的人的眼型 是前眼角往下搭 这样的情况 前眼角的眼线就要画得粗 这样才能看到 而且提神 有的是后眼角的肉肉往下搭 这样的情况 后眼角的眼线 就要比前面化的粗 而且可以拉长眼形 这就是为什么 单单一条眼线 有粗有细的道理 有的人的眼型 是前眼角往下搭 这样的情况 前眼角的眼线就要画得粗 这样才能看到 而且提神 有的是后眼角的肉肉往下搭 这样的情况 后眼角的眼线 就要比前面化的粗 而且可以拉长眼形 这就是为什么 单单一条眼线 有粗有细的道理 ~ the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 可以看他开始的眼镜 和最后成型 大了很多哦 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 可以看他开始的眼镜 和最后成型 大了很多哦 最全的眼线画法 第一种画法 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 眼线新画法 能让眼睛放大2倍 眼线啊,它可真是个好东西,能够让你的双眼不仅有神而且还能增大,完全符 合了微整形的效果,而且无痛无创,其实我们最推崇的还是这样的美容美妆法。 其实只要你能够多留意一下自己的化妆包就不难看出,这里面最多的不过就是 那些腮红啊,睫毛膏啊,眼影啊,唇膏啊,但最能够让双眼散发神采的,那必 须眼线首当其冲,今天我们就来学学怎样用眼线来让眼睛放大三倍吧~ the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use SETP1 SETP1:一只手提拉上眼皮,另一只手从内眼角向外眼角分四五段,紧贴着睫毛根部反复描画上眼线。 SETP2 SETP2:完成图,可以看到眼睛两端的眼线比较细,中央部分粗一些。有增大黑眼球宽度的效果。 SETP3 SETP3:眼睛向上看,从外眼向内眼球中央画下眼线,也分3段画。在外眼角的地方要与上眼线连接自然。 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use SETP4 SETP4: 闭眼后,用棉签来回晕染上眼线,一般要擦拭4到5下,尽量在眼中央晕染的宽一些。 SETP5 SETP5:晕染下眼线很重要。向前看,用棉签来回擦拭4到5下,稍微向眼线外晕染出深浅感。 接下来学学眼线膏画法 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use SETP1 SETP1:用眼线刷取一点眼线膏,在手背上涂抹均匀,并调整刷毛方向及眼线膏 用量。 SETP2 SETP2:从外眼角上眼线的终端起笔,描画到黑眼球中央部位,通常需要反复描 2~3次,描出立体感。 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use SETP3 SETP3:将笔立起来一些,将多余的眼线膏擦掉一些,用眼线刷的竖面快速描画,立体感顿生。 SETP4 SETP4:眼线刷刷头扁平状,在下眼线描绘处的外围来回涂抹,画出深浅不同的层次感。 1、眼线黄金法则 眼线笔、液、膏的挑选法则:就个人经验而言,无论多么好的眼线笔都会有晕妆的尴尬,如果带妆时间比较长最好不要使用眼线笔,容易搞成熊猫眼。眼线笔的优点是容易上妆,所以特别适合新手使用。眼线液则不容易晕染,但缺点是比较适合化妆的熟练老手,因为毕竟都是软毛刷,很难掌握,容易画的歪歪扭扭。就目前而言,眼线膏相对是比较好的产品,因为眼线刷是扁的,容the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 易操作,而且膏状物体也不容易晕妆,但缺点是眼线膏有时候会出现粉末状现象,而且一般价格不菲。 10?法则:在画眼线之前,一定要仔细检查眼角,看眼睛尾部是否能与下眼睑形成一个10?的角。如果夹角大于10?,则画上眼角的眼线时要降低一点达到10?,如果小于10?则向上挑一些。保持在10?的眼线则是最完美的。 因“眼”制宜法则:眼线并不是一成不变的,不同的眼睛适合不同的眼线画法。 如果是戴眼镜的MM,则应该加重下眼线,这样才不会被镜片遮住。 如果是内双的MM,则用眼线笔加重上眼线,而且要画的比较宽一些,这样才能打造出自然双眼皮的大眼效果。 如果眼角有些下垂的MM,则在画眼线的时候,紧贴上眼皮的睫毛根部,并用眼线将空隙填满,从内眼角到外眼角则保持眼线的宽度逐渐变宽。最后眼角部分则要将眼线拉出来一块,这样可以纠正眼角下垂的问题。 如果是双眼间距较宽的MM,则要强调内眼角,缩短双眼的距离。要在内眼角画上细细的眼线,并在上面覆盖一层细细的黑色眼影。 2、画眼线详细步骤 (1)如果使用的是眼线液,首先要先摇晃眼线液的瓶身,使液体混合均匀。然后抽出眼线液的刷头,并挂掉多余液体,让眼线刷毛粗细一致。 (2)对于不太熟练的MM,可以现在手背上练习的画几笔,以熟悉手感。 (3)拿笔(刷)的食指和无名指贴住脸颊,这样可以防止手抖。另一手的食指扒住眼尾,并向上提起,下巴抬高,眼睛向下瞄镜子。然后从距离眼角1/3的部位开始画眼线,以来回画的方式将眼线画均匀。 (4)从眼尾向外,越双眼皮的结束处,使眼线上扬。 (5)此时眼线和睫毛之间是有空隙的,看上去十分奇怪,要用眼线笔(刷)将缝隙填满,让眼线自然、美丽。 第二种画法 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use step 1 上眼线从眼尾开始画更显平滑自然 step1:上眼线从眼尾开始画更显平滑自然 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 用眼线笔从眼尾开始描绘。为了更好地掌握眼线走向,首先从眼尾开始描绘。 用手指抬起上眼皮,这样可以更方便地用眼线笔“填”满睫毛根部的空隙。 step 2 “填”满睫毛根部眼睛变宽变圆 step 2:“填”满睫毛根部眼睛变宽变圆 用“填”的方式,将睫毛根部的空隙处“填”满。画的时候,用手指将上眼皮 稍拉起一些,然后用刷子将睫毛根部和粘膜的部分涂满颜色。 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use step 3 眼尾向外抬高1cm立刻拉长眼形 step 3:眼尾向外抬高1cm立刻拉长眼形 在眼尾处延长眼线,在视觉上拉长眼形。手指抬起眼尾处的眼皮,在眼线末端、近眼角位置把眼线升高,约1cm,并将翘起部分加粗,画成三角形。 step 4 内眼角呈三角形且闭合最自然的开眼角术 step 4:内眼角呈三角形且闭合最自然的开眼角术 内眼角是关键,将内眼角向外拉长2mm,让内眼角呈现自然的尖三角形,并将上下两条眼线闭合,记住要是平行的,就像你的眼角本来就长成那样似的自然。 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use step 5 用眼线笔画出平行的下眼线 step 5:用眼线笔画出平行的下眼线 重要的在下眼线的眼尾处,要画出一个平行的眼角,看上去就像你自己本身的 眼角一样,其实它是假的,就是它让你的眼睛看起来变大了~ step 6 用刷子将下眼线尾部晕开 step 6:用刷子将下眼线尾部晕开 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 在上下眼尾处将眼线用小刷子晕染开,下眼线选用眼影粉淡淡描画,再点上银色闪粉,让眼珠水汪汪的,电力十足。 step 7 粉色下眼线加倍扩眼 step 7:粉色下眼线加倍扩眼 粉色比白色来得自然。用它画下眼线,能将眼睛瞬间展开~一定要描绘在下眼皮粘膜处,在下方淡淡地描绘一条棕色眼线,眼睛轮廓就被完全扩大了 step 8 内眼角C形提亮 加强轮廓 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use step 8:内眼角C形提亮 加强轮廓 最后用粉色眼线,在内眼角处描画。在内眼角画出“C”形高光,让眼窝更深邃,在视觉上给人以扩张感。 step 9 丹凤眼 step 9:丹凤眼 丹凤眼细长且有些上翘。为了使眼睛看起来向下些,上眼睑的眼线可稍粗些且不要画出眼尾,下眼睑的眼线则随眼形自然描画,画至眼尾时应做水平结尾。这样可以平衡过翘的眼睛。 step 10 单眼皮 step 10:单眼皮 单眼皮一般眼睛细小最好不要上下眼线都画,以免让眼睛看起来更小。上眼线的中段稍宽些,能让眼睛看起来较圆。下眼线可只画眼睛长度的1/3处,然后用银白色眼线作点缀。 大家发表的互动观点(3人发表) ---------------------------------------------------------------------------------- ------------------------------------------------------- 步骤一、内眼线 内眼线是眼妆的第一步,描画内眼线时首先用手将上眼皮轻轻的提起来,露出白色粘膜部分,然后用眼线笔沾取眼线膏仔细填补睫毛根部的空隙,要全部填the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 满,内粘膜也涂上黑色眼线膏。画好内眼线后,眼睛马上变得有神,眼神不会那么散。 内眼线 步骤二、上眼线 Step1、画外眼线的重点是要紧贴睫毛根部,不能留出空隙。可以用手指轻轻按住眼皮,从眼头开始分段描画,线要平滑流畅,虽然不用一步画完,但是一定要连接好。 上眼线Step1 Step2、眼尾处的眼线一定要延长,在视觉上可以有效地放大眼睛,拉长眼型后。脸也会相应变小。画法是手指抬起眼尾处的眼皮,在眼线末端、近眼角位置把眼线升高,约1cm,并将翘起部分加粗,画成三角形。注意画成三角形是重点,一定要把眼尾三角的区域都填补好,不能露出白色的眼肉。 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 上眼线Step2 步骤三、开内眼角 重中之重来啦~内眼角的描画是大家忽略的步骤,其实效果十分显著。我们通过高超的技巧,不用做开眼角手术一样可以达到放大眼睛的目的。 方法 快递客服问题件处理详细方法山木方法pdf计算方法pdf华与华方法下载八字理论方法下载 是将内眼角向外拉长2mm,让内眼角呈现自然的尖三角形,并将上下两条眼线闭合,记住要是平行的,就像你的眼角本来就长成那样似的自然。 开内眼角 步骤四、下眼线 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use Step1、以眼球外侧下方为起点开始描画下眼线,重要的在下眼线的眼尾处,要画出一个平行的眼角,看上去就像你自己本身的眼角一样,其实它是假的,就是它让你的眼睛看起来变大了。眼线结束的地方要和上眼线连接起来,画成“V”字形状。下眼线Step1 Step2、在上下眼尾处将眼线用小刷子晕染开,下眼线选用眼影粉淡淡描画,再点上银色闪粉,让眼珠水汪汪的,电力十足。 下眼线Step2 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use Step3、用粉色的眼线笔将内粘膜全部画满,粉色比起白色更加柔和自然,用它画下眼线,能将眼睛瞬间展开!一定要描绘在下眼皮粘膜处,并且在眼头的地方加强,这样可以使眼睛看起来更明亮。 下眼线Step3 —————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————————— 世界最全的画眼线方法~漂亮! the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 根据不同的眼型 和 沿线的粗细调节 可以画出很多不同的眼妆 怎样选择最适 合自己的 首先 你要了解自己的眼睛 单 双, 内双?是否适合贴双眼皮贴 等 等 很多人 不画眼线 就像是没精神一样 对于我自身而言 是因为眼睛的前三 分之一的部分 (请看第二张) the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 肉肉比较多 盖住了 瞳孔的二分之一 这样就好像是没睡醒的眼睛 再画眼线的 时候 我的前眼角的眼线 会化的很粗 睁开眼睛 这好是细细的一条 而且仿佛 是假瞳孔一般 大致说到这里 因为我的眼睛已经问了眼线 所以没办法出教程 大家对付看吧 (*^__^*) 嘻嘻„„ the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 很多人再画眼线的时候 只是很均匀的一条线 这对于本身底子很好的眼镜 就 很适合的 但是 毕竟很多人的眼镜 上眼睑不是那么均匀的弧度 有的三角眼 有的不是很开 注意整个眼镜的 前三分之一 这个地方和瞳孔高度决定一个人 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 看起来 精神与否 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 有的时候 看自己的眼线 总是觉得怪怪的 而且不但没有放大眼睛 反而还不如 不花了 这是为什么呢 其实每个人画眼线的时候 首先要观察自己的眼睛 根据 眼型来化适合自己的眼线 在会觉得很好看哦 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use 可以看他开始的眼镜 和最后成型 大了很多哦 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use ————————————————————————————————————————— ——————————— ————————————————————————————————————————— the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use ———————————— 完美眼影篇--不同眼型眼影的画法 ========================================= ========================================== the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use ======================================== the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
本文档为【史上最全各种眼形眼线的画法,】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_721103
暂无简介~
格式:doc
大小:1MB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-09-01
浏览量:22