首页 KWWB系列无功补偿控制器说明书

KWWB系列无功补偿控制器说明书

举报
开通vip

KWWB系列无功补偿控制器说明书KWWB系列无功补偿控制器说明书 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety resp...

KWWB系列无功补偿控制器说明书
KWWB系列无功补偿控制器说明书 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness,※※※※※※※※ 目 录 ※※※※※※※※ 1. 概述.................................................................... 7 2. 功能.................................................................... 8 3. 型号列 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf ............................................................12 4. 技术指标............................................................15 4.1 额定值............................................................15 4.2 测量精度 ........................................................15 4.3 输入 ...............................................................16 4.4 保护 ...............................................................16 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 4.5 补偿模式 ........................................................17 4.6 时钟 ...............................................................17 4.7 通讯 ...............................................................17 4.8 绝缘强度 ........................................................18 4.9 脉冲电压 ........................................................18 4.10 绝缘电阻 ........................................................18 4.11 电磁兼容 ........................................................18 4.12 工作条件 ........................................................18 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructiints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low education, training, and responsibility for security at all levels, security funds ensure that projects significant acceman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatio4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 2 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 4.13 防护等级 ........................................................19 4.14 电源 ...............................................................19 4.15 重量 ...............................................................20 4.16 外形尺寸 ........................................................20 5. 设备原理............................................................20 5.1 工作原理 ........................................................20 5.2 原理框图 ........................................................21 5.3 无功补偿判据 .................................................24 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 3 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 5.4 电容投切方式 .................................................25 6. 操作指南............................................................28 6.1 键盘和指示灯定义 ..........................................28 6.2 KWWB-100系列菜单列表 ..............................30 6.3 KWWB-200系列菜单列表 ..............................34 6.4 主菜单............................................................41 6.5 电量显示菜单 .................................................41 6.6 电压谐波畸变率显示菜单................................42 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructiints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low education, training, and responsibility for security at all levels, security funds ensure that projects significant acceman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatio4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 4 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 6.7 时钟菜单 ........................................................42 6.8 补偿 记录 混凝土 养护记录下载土方回填监理旁站记录免费下载集备记录下载集备记录下载集备记录下载 菜单 .................................................43 6.9 手动投切菜单 .................................................44 6.10 基本参数设置菜单 ..........................................45 6.11 高级参数设置菜单 ..........................................53 6.12 故障信息菜单 .................................................65 7. 设备尺寸............................................................67 8. 接线说明............................................................68 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 5 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 8.1 端子定义 ........................................................68 8.2 端子含义 ........................................................69 8.3 100系列控制器输入接线图 .............................70 8.4 200系列控制器输入接线图 .............................71 8.5 开关形式与接线..............................................72 8.6 投切方式与端子分配.......................................73 9. 调试大纲............................................................74 9.1 调试前的准备 .................................................74 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructiints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low education, training, and responsibility for security at all levels, security funds ensure that projects significant acceman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatio4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 6 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 9.2 上电时故障处理..............................................75 9.3 参数整定 ........................................................76 9.4 启用自动运行功能 ..........................................76 9.5 注意事项 ........................................................76 10. 订货及验收 ......................................................77 1. 概述 KWWB系列智能无功补偿控制器(后面简称控制器)是国内首推的专业化无功补偿控制产品。与一般的无功补偿控制器比较,它具备更多增强功能(如实时时钟、投切记录、开关保护等),其系列化的产品能够完全满足不同用户在不同应用场合的使用要求。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 7 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 控制器能实现对接触器、晶闸管开关、复合开关等多种投切开关的控制,控制能力强。而作为加强型的控制器,还具备通讯功能或谐波保护功能(请参看不同型号的配置)。 控制器具备综合补偿、分相补偿、循环投切和8421编码等多种补偿方式可选。 控制器采用国际 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 的外形尺寸和统一的用户界面,确保了用户安装调试的简捷方便,以及良好的互换性。 2. 功能 测量功能 控制器能够测量电压、电流、有功、无功、功率因数、频率等多种电量。控制器能够自动实现温漂、零漂的校正,所以damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 8 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 电压电流精度可达到0.5级,有功、无功功率可达到1级。 补偿功能 在精确测量的基础上,控制器全面支持对系统的补偿功能。补偿响应快,控制准确,支持动态和静态补偿,支持循环投切、8421编码等多种补偿方式。 通用保护功能 控制器具备上电保护、掉电保护、过压保护、欠压保护、欠流保护等多种保护功能。 另外,针对电容投切的安全要求,还提供开关保护功能,在开关动作次数越限后,将该支路闭锁为断开状态,提示更换部件,并防止引发系统故障。被保护支路退出运行后,其他支路仍正常工作。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 9 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 显示功能 双排液晶显示,可实时显示电网的主要参数,包括电压、电流、有功、无功、频率、功率因数等。 时钟功能 准确的时钟功能为系统事件的发生和各种统计量提供时间坐标。 补偿统计功能 统计包括电容累计投切次数和累计投入无功电度,便于对无功补偿效果进行评估,和优化无功补偿的控制 方案 气瓶 现场处置方案 .pdf气瓶 现场处置方案 .doc见习基地管理方案.doc关于群访事件的化解方案建筑工地扬尘治理专项方案下载 。 高级设置功能 高级设置项目,是为专业人员提供的优化设置的选项。普damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 10 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 通用户可不设置,采用缺省选项,从而简化操作。 故障记录及报警功能 绝大多数的故障信息都能被记录,以供查阅。有故障信息时,报警指示灯亮。 自诊断功能 控制器采用实时自诊断技术,如果控制器内出现问题,将启动应急策略,并将故障给予记录。 通讯功能 控制器可选配通讯功能,通过232或485通讯口,与就地的计算机设备通讯或组网与远程终端实现四遥(遥测、遥调、遥信、遥控)功能。 控制器也可通过232、485口扩展,与无线通讯模块(如security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 11 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, GPRS模块)、MODEM等连接,构成通讯网络。 谐波测量保护功能 可测量至15次谐波,并提供针对电压总谐波畸变率的保护功能,还可以支持投切滤波器。 3. 型号列表 功能项目 KWWB-100 KWWB-200 KWWB-200T KWWB-200 TX 单相测量 ? 三相测量? ? ? ? 综合补偿? ? ? ? 分相补偿 ? ? ? damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 12 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 循环投切 ? ? ? ? 8421编码 ? ? ? ? 通用保护? ? ? ? ? 显示功能 ? ? ? ? 时钟功能 ? ? ? ? 补偿统计? ? ? ? ? 故障记录 ? ? ? ? 报警功能 ? ? ? ? 自 诊 断 ? ? ? ? 通讯功能? ? ? 谐波测量? ? 谐波保护 ? security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 13 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 输出节点 12(MAX) 节点形式直流电平,空节点 ? ? 三相测量情况下,能够避免三相负荷不平衡时造成的无功测量误差和投切时无功反送的问题。 ? 综合补偿建立在三相测量的基础上,因为有分相补偿的要求。 ? 通用保护包括电压保护、电流保护、开关保护等多种。 ? 补偿统计和显示量在三相采样(200系列)情况下有增加,可参有关说明。 ? 所有带通讯功能的控制器均可配备一个通讯口,232、485可damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction raton organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antieducation, training, and responsibility for security at all levels, security funds ensure that projects significant accdown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Tar4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 14 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 选。用户如需配置两个通讯口,订货需特别说明。 ? 具有谐波测量和保护功能的控制器主要用于谐波含量高的厂矿区域或控制要求高的场合,也可用于投切滤波器。 ? 节点形式分直流电平和空节点两种。直流电平范围5V,24V,用户可指定;空节点可承载250VAC或100VDC,容量3A。 4. 技术指标 4.1 额定值 额定电压Un:380VAC 额定电流In:5A,1A 4.2 测量精度 电压测量精度:0.8Un,1.2Un,?0.5, 电流测量精度:0.1In,1.2In,?0.5, security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 15 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 功率测量精度:?1, 功率因数测量精度:?1, 频率测量精度:?0.02Hz 4.3 输入 电压量程:0,2Un 电流量程:0,2In 电压过载:800V 5s,1000V 3s 电流过载:2In连续,10In 3s,30In 1s 吸收功耗:电压 0.2VA,相 电流 0.1VA,相 4.4 保护 过压保护:380,460(100系列),级差1V 220,265(200系列);级差1V damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 16 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 欠压保护:300,380(100系列),级差1V 175,220(200系列);级差1V 过压回差:0,20V,级差0.1V 欠压回差:0,20V,级差0.1V 欠流保护:0,100A(一次电流),级差1A 最大开关次数:1,100万次,级差1万次 4.5 补偿模式 循环投切 / 8421编码 / 分相补偿 / 综合补偿 4.6 时钟 时间格式:年 / 月 / 日 / 时 / 分 / 秒 时钟误差:0.5秒 / 日 4.7 通讯 串行口:RS485 / RS232 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 17 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 通讯规约:IEC60870-5-101 / MODBUS / DNP3.0 4.8 绝缘强度 符合IEC255-5标准 2.0KV/50Hz/1min 4.9 脉冲电压 符合IEC255-5标准 ?5KV/1.2/50μS/0.5J 4.10 绝缘电阻 符合IEC255-5标准 100MΩ/500V 4.11 电磁兼容 脉 冲 群:IEC255-22-1标准2级 辐射电磁场:IEC60255-22-3标准2级 静电 放电:IEC255-22-2标准3级 快速 瞬变:IEC61000-4-4标准3级 4.12 工作条件 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 18 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 工作温度:-25,55? 储存运输温度:-40,85? 相对湿度:5%,95%,无凝露 海拔高度:<2000m 地震强度:<8级 污秽等级:IV级 安装场所:除火灾、爆炸、水淹、强化学腐蚀等场所外的地方。 4.13 防护等级 防护等级:IP33 4.14 电源 电源电压:?20%Un,输入与采样共用 整机功耗:5W(12路继电器输出) security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 19 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 3W(12路直流电平输出) 0.001mW(低功耗待机) 4.15 重量 750克 4.16 外形尺寸 外形尺寸:120mm(长)×120mm(宽)×100mm(深) 安装开孔尺寸:112mm×112mm 5. 设备原理 5.1 工作原理 控制器由测量、显示、控制、电源等几部分组成。 测量信号经小型电压(电流)互感器变送,并进行信号调damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 20 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 理后,送入12位AD进行模数转换。16位高性能单片机对转换后的数字信号依据计算 公式 小学单位换算公式大全免费下载公式下载行测公式大全下载excel公式下载逻辑回归公式下载 进行计算,得到电压、电流、有功功率、无功功率和频率。所有测量所得数据可以通过LCD液晶模块显示。 在控制上,单片机根据无功补偿的判据(5.3节)要求,判别电压、电流和无功功率是否满足电容投入或切除要求,并执行相应的控制命令。 5.2 原理框图 单相采样原理框图(见下页) security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 21 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 显示电源键盘 电压信号时钟变送调理/ 电流信号通讯变送调理 存储输出 三相采样原理框图 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 22 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 显示电源键盘 电压信号时钟变送调理/ 电流信号通讯变送调理 存储输出 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 23 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 5.3 无功补偿判据 无功投切依据电压、电流、无功功率、功率因数等综合因素,其投入的充要条件如下: ? L_V+L_?U?U?H_V-H_?U ? COSf1,L_PF ? COSf2,H_PF ? I,L_I 其中,L_V为欠压门限,H_V为过压门限,L_?U为欠压回差,H_?U为过压回差,L_PF为投入门限,H_PF为切除门限,L_I为欠流门限,U、I为实际的电压、电流,COSf1为电容投入前的实测功率因数,COSf2为当前负荷情况下投入下一级电容后的功率因数的理论计算值。 当满足如下任一条件时,电容切除(Q1:实测的无功功率) damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 24 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? U?L_V或U?H_V ? Q1?0 ? I?L_I ? COSf1?H_PF 当满足如下任一条件时,电容投入功能闭锁(此时可切除电容) ? L_U,U,L_U+L_?U ? H_U,U,H_U-H_?U 5.4 电容投切方式 循环投切 每级电容为等容量三相电容,电容投切时遵循先投入的电容先切除这一原则。 循环投切的优点是各级电容投入时间从较长时间看会接近security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 25 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 相等,所以各级电容的老化程度和寿命会大致相等。 编码投切 各级电容(三相电容)容量的比例遵循所设置的编码值对应的递增关系,这样可以组合成一系列电容级差,电容投切时不采用循环投切,而采用这种编码方式。 编码投切的优点是在容量相等的情况下,其所需级数更少,或单级级差更小(补偿更充分)。 编码投切的设置方法见6.10基本参数设置中的“补偿方式” 参数设置; 分相投切 各级电容均由单相电容组成,各相电容独立遵循循环投切damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 26 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 或编码投切的方式;编码投切的设置方法同编码投切设置相同; 这种补偿方式需要三相采样的控制器,即200系列的控制器,来完成控制。 综合补偿 综合补偿是对循环投切和分相补偿的综合,一般情况下,分补部分(第一级或前两级)由单相电容组成,后续各级电容是三相电容,分补部分按分相补偿,其他各级电容按等容量循环投切进行。 其优点是对循环投切和分相补偿的优缺点加以综合,在三相负荷不平衡不是特别大的情况下,能取得理想的补偿效果。本产品支持最多两级分补; 这种补偿方式也需要三相采样的控制器,即200系列的控制器,来完成控制。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 27 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 6. 操作指南 6.1 键盘和指示灯定义 控制器采用红色发光二极管指示灯,从左至右共有16个指示灯,依次为工作指示灯、运行指示灯、报警指示灯、通讯指示灯、以及12路电容器投切指示灯。 工作指示灯 上电工作后,指示灯按秒均匀闪烁。 运行指示灯 手动工作状态时指示灯常亮、自动工作状态时指示灯慢闪。 报警指示灯 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 28 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 当有故障报警时,指示灯亮。 通信指示灯 当发生通讯时,指示灯闪烁。 电容投切指示灯 当电容器投上时,对应的指示灯亮。 下方的面膜从左至右依次有BACK(返回)、UP(向上)、DOWN(向下)、SET(确认)键。 退回本菜单层面,返回上一级菜单(包括退出保存),或退出菜单系统。 在本菜单层面,向上移动至相邻的项目;或在修改数据时,递增数据。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 29 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 在本菜单层面,向下移动至相邻的项目;或在修改数据时,递减数据。 选择进入下一级菜单;在修改数据时,向右移动至当前的数据修改位;或确认是否保存数据。 在进行菜单操作时,在LCD显示行的最左边显示当前操作菜单的位置,其中,第一级主菜单使用A、B、C等大写字母排序,每一级主菜单下面的二级菜单采用1、2、3等阿拉伯数字表示。比如:B4表示B主菜单下的第4个二级菜单。 6.2 KWWB-100系列菜单列表 主菜单 二级菜单 三级菜单 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratn. Tarints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low on organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioeman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antiidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: oneducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 30 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 — 显示1:电压 电流 有功 无功 — Display电量显示 — 显示2:功率因数 频率 — Time时钟 修改时钟 Day 年 月 日 显示与设(显示格式同Time 时 分 秒 置 左) T_Amo:电容总投切次数 — C_Amo:当日投切次数 — Record补Y_Amo:前一日投切次数 — 偿记录 T_Wat: 总投入无功电— 度 Manual手— 显示并改变电容投切状动投切设态 — 置 C_Ser:电容级数 0,12 Bsetup基本参数设C_Cap:单级电容容量 0,99.9kvar 置 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 31 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, CT:CT变比 0,999 C_Int:电容投切间隔 0,99s C_Mod:补偿方式 循环/编码 O_Mod:运行方式 手动,自动 H_V:过压门限 380,460V L_V:欠压门限 300,380V H_?V:过压回差 0.0,20.0V L_?V:欠压回差 0.0,20.0V Hsetup高L_I:欠流门限 0.0,100.0A 级参数设置 L_PF:投入门限 0.000,0.999 H_PF:切除门限 0.000,0.999 C_Tim:电容放电时间 0,99s C_Ori:电容投入次数初0, 9999999 始值 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 32 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 S_Amo:开关最大动作次1,100万次 数 Q_Ori:投入无功电度表0,9999999.9底 度 Band Check 1200,19200 Commun:通讯 1/0/- Calib:校准 厂家使用 故障信息清除 Clear Error — Error1:过压 — ERROR当Error2:欠压 前故障信— Error3:缺相 息 — Error4:欠流 电流偏大支路号 Error5:电容支路电流偏大 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 33 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 电流偏小支路号 Error6:电容支路电流偏小 次数越限支路号 Error7:开关动作次数越限 — Error8:内部故障 注:能闪烁的菜单才有下一级菜单; 有通讯功能的控制器才有通讯设置项。 6.3 KWWB-200系列菜单列表 主菜单 二级菜单 三级菜单 显示,:A相电压 — Display UI damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratget: onints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low n. Tareman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antion organization design, construction, programming, and develop targeted security measures, and to supervise the implementatiodown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 34 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 电量显示 电流 A相有— 功 无功 显示,:B相电压 — 电流 B相有— 功 无功 显示,:C相电压 — 电流 C相有— 功 无功 显示,:三相功— 率因数 — 频率 显示,:电压总— DisplayTHD security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 35 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 电压谐波畸谐波畸变率 变率显示 ,次谐— 波畸变率 显示,:,次谐— 波畸变率 次谐波— 畸变率 显示,:,次谐— 波畸变率 ,,次— 谐波畸变率 Day 年 修改时钟 Time时钟显月 日 (显示格式同示与设置 Time 时 左) 分 秒 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 36 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 T_Amo:电容总— 投切次数 C_Amo:当日投— 切次数 Record 补偿记录 Y_Amo:前一日— 投切次数 T_Wat:总投入无— 功电度 Manual手显示并改变电容— 动投切设置 投切状态 — C_Ser:电容级数 0,12 Bsetup基本C_Cap:单级电0.0,参数设置 容容量 99.9kvar CT: CT变比 0,999 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 37 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, C_Int:电容投切0,99s 间隔 C_Mod:补偿方循环/编码/分相/ 综合 式 O_Mod:运行方手动,自动 式 H_V:过压门限 220,265V L_V:欠压门限 175,220V H_?V:过压回差 0.0,20.0V Hsetup高级L_?V:欠压回差 0.0,20.0V 参数设置 L_I:欠流门限 0.0,100.0A L_PF:投入门限 0.000,0.999 H_PF:切除门限 0.000,0.999 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 38 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 C_Tim:电容放电0,99s 时间 C_Ori:电容投入0,9999999 次数初始值 S_Amo:开关最1,100万次 大动作次数 Q_Ori:投入无功0.0, 电度表底 9999999.9度 U_THD:电压总0.0,99.9(百 谐波畸变率门限 分比) Band Check Commun:通讯 1200,9600 1/0/- Calib:校准 厂家使用 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 39 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 故障信息清除 Clear Error Error1:过压 过压的相别 Error2:欠压 欠压的相别 Error3:缺相 缺相的相别 Error4:电压谐波谐波越限相别 越限 ERROR当Error5:欠流 欠流的相别 前故障信息 Error6:电容支路电流偏大支路 电流偏大 号 Error7:电容支路电流偏小支路 电流偏小 号 Error8:开关动作次数越限支路 次数越限 号 注:能闪烁的菜单才有下一级菜单; damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 40 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 有通讯功能的控制器才有通讯设置项; 有谐波测量保护功能的控制器才有有关显示设置和信息项。 6.4 主菜单 ? 在黑屏情况下,按SET键进入主菜单。 ? 在主菜单层面,按UP或DOWN键向上或向下移动主菜单项目。 ? 在主菜单层面,按SET键进入正在闪烁的菜单项目。 ? 在主菜单层面,按BACK键退出主菜单,退出后黑屏。 6.5 电量显示菜单 ? 在主菜单层面,电量显示菜单闪烁,按SET键进入电量显示菜单。 ? 在电量显示菜单层面,按UP或DOWN键向上或向下移动security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 41 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 菜单项目,查看显示值。 ? 在电量显示菜单层面,按BACK键退出电量显示菜单。 ? 在电量显示菜单层面,SET键无效。 6.6 电压谐波畸变率显示菜单 ? 在主菜单层面,电压谐波畸变率显示菜单闪烁,按SET键 进入电压谐波畸变率显示菜单。 ? 在电压谐波畸变率显示菜单层面,按UP或DOWN键向上 或向下移动菜单项目,查看显示值。 ? 在电压谐波畸变率显示菜单层面,按BACK键退出电压谐波畸变率显示菜单。 ? 在电压谐波畸变率显示菜单层面,SET键无效。 6.7 时钟菜单 ? 在主菜单层面,时钟菜单闪烁,按SET键进入时钟菜单。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 42 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? 在时钟菜单层面,UP或DOWN键无效。 ? 在时钟菜单层面,按SET键进入时钟设置菜单。 时钟设置 ? 在时钟设置菜单层面,闪烁位的数可修改,按UP或DOWN键,数据递增或递减。 ? 在时钟设置菜单层面,按SET键使数据的闪烁位右循环,即被修改的位右循环。 ? 在时钟设置菜单层面,按BACK键退出时钟设置子菜单。 数据如改动,屏幕提示数据是否保存。 ? 在屏幕提示数据是否保存时,按UP或DOWN键在YES和 NO选项中移动,按SET键确认。 6.8 补偿记录菜单 ? 在主菜单层面,如补偿记录菜单闪烁,按SET键进入补偿security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 43 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 记录菜单。 ? 在补偿记录菜单层面,按UP或DOWN键将依次显示电容 总投切次数、当日投切次数、前一日投切次数、总投入无 功电度。 ? 在补偿记录菜单层面,SET键无效。 ? 在补偿记录菜单层面,按BACK键退出补偿记录菜单,返回主菜单。 6.9 手动投切菜单 ? 按Manual菜单进入手动投切菜单时,若当前状态为手动, 同说明书;若为自动方式时,显示当前投切状态,状态字 符不闪烁,按Up、Down键翻页,按Back键退出; ? 在手动投切菜单层面,两屏12个(最多)符号代表电容器 的实际状态,其中X代表电容为切除状态,O代表电容为damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 44 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 投入状态。闪烁的符号可用UP或DOWN修改。按SET键 可以在两屏之间切换。 ? 在手动投切菜单层面,按BACK键退出手动投切菜单,退 出时如电容状态没有修改,直接返回记录菜单。 ? 退出时如电容状态被修改,系统提示是否要保存。按UP或 DOWN键选择YES或NO选项。SET键用于确认。确认后, 如电容状态被修改,投切工作将逐级完成。 6.10 基本参数设置菜单 ? 在主菜单层面,如基本参数设置菜单(Bsetup)闪烁,按SET键进入基本参数设置菜单。? 在基本参数设置菜单层面,按UP或DOWN键可向上或向下移动菜单项目。 ? 在基本参数设置菜单层面,按SET键进入正在闪烁的菜单项目。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 45 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 在基本参数设置菜单层面,按BACK键退出基本参数设置 菜单,如无数据修改,直接返回主菜单。 ? 如有数据修改,系统提示是否要保存。按UP或DOWN键 选择YES或NO选项。SET键用于确认。 基本参数缺省值 产品出厂后,非特殊约定,采用如下缺省值。 基本参数 缺省值 电容级数 0 单级电容容量 99.9kvar CT变比 1 电容投切间隔 3s 补偿方式(自动状态下) 循环投切 Cycle 运行方式 手动 Manual damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 46 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 电容级数 ? 在基本参数设置菜单层面,如电容级数菜单(C_Ser)闪烁, 按SET键进入电容级数菜单。 ? 在电容级数菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 ? 在电容级数菜单层面,按SET键使数据的闪烁位右循环,即被修改的位右循环。 ? 在电容级数菜单层面,按BACK键退出电容级数菜单。 单级电容容量 ? 在基本参数设置菜单层面,如单级电容容量菜单(C_Cap) 闪烁,按SET键进入单级电容容量菜单。 ? 在单级电容容量菜单层面,所显示值为当前设置数据,按 UP或DOWN键可使闪烁位的数递增或递减。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 47 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 在单级容量菜单层面,按SET键使数据的闪烁位右循环,即被修改的位右循环。 ? 在单级电容容量菜单层面,按BACK键退出单级电容容量菜单。 ? 在使用编码方式时,输入最小的电容容量,也是第一级的 电容容量;有分相情况时,单级容量是一级中三只单相电 容的容量和。 CT变比 ? 在基本参数设置菜单层面,如CT变比菜单(CT)闪烁,按SET键进入CT变比菜单。 ? 在CT变比菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratget: onints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low n. Tareman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antion organization design, construction, programming, and develop targeted security measures, and to supervise the implementatiodown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 48 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? 在CT变比菜单层面,按SET键使数据的闪烁位右循环,即被修改的位右循环。 ? 在CT变比菜单层面,按BACK键退出CT变比菜单。 电容投切间隔 电容投切间隔为投切电容时相邻两级电容投切之间的时间间隔,它是为了避免系统无功负荷的短时快速变化而可能引起的电容器频繁投入和切除。 ? 在基本参数设置菜单层面,如电容投切间隔菜单(C_Int) 闪烁,按SET键进入电容投切间隔菜单。 ? 在电容投切间隔菜单层面,所显示值为当前设置数据,按 UP或DOWN键可使闪烁位的数递增或递减。 ? 在电容投切间隔菜单层面,按SET键使数据的闪烁位右循环,即被修改的位右循环。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 49 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 在电容投切间隔菜单层面,按BACK键退出电容投切间隔菜单。 补偿方式 ? 在基本参数设置菜单层面,如补偿方式(C_Mod)闪烁,按SET键进入补偿方式菜单。 ? 在补偿方式菜单层面,所显示值为当前补偿方式,按UP或DOWN键可改变补偿方式。 Cycle:循环投切; Code:编码; Phase:分相补偿; Complex:综合补偿; ? 在补偿方式菜单层面,SET键无效。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratget: onints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low n. Tareman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antion organization design, construction, programming, and develop targeted security measures, and to supervise the implementatiodown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 50 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? 在补偿方式菜单层面,按BACK键退出补偿方式菜单。 ? “投切方式”设为编码(Code)或三相中为分相(Phase) 时,投切菜单C_Mod下列出菜单Coding,按Set键进入后 显示编码设置菜单,如下图: (编码序号) 1 2 3 4 5 6 7 8 (编码值) 1 2 4 8 。。。 进入时第一级编码值闪烁,按Up、Down键改变编码值,按Set键移动至下一级编码值进行修改,若级数大于8时进入下一页编码设置菜单,如下图: (编码序号) 9 10 11 12 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 51 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, (编码值) 1 2 4 8 按Back键退出; ? 三相中“投切方式”设为综合(Complex)时,投切菜单 C_Mod下列出菜单C_Setup,按Set键进入综合补偿设置 列表菜单,包括P_Ser(分补级数)、P_Cap1(分补第一级 电容容量)、P_Cap2(分补第二级电容容量)菜单,在相 应的菜单项闪烁时进入相应的设置菜单,操作方法如电容 级数和单级电容容量菜单; C_Mod C_Setup, P_Ser, 分补级数设置 P_Cap1, 分补第一级电容容量 P_Cap2, 分补第二级电容容量 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 52 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 运行方式 ? 在基本参数设置菜单层面,如运行方式菜单(O_Mod)闪 烁,按SET键进入运行方式菜单。 ? 在运行方式菜单层面,所显示值为当前运行方式,按UP或DOWN键可改变运行方式。 Manual:手动方式; Auto:自动方式; ? 在运行方式菜单层面,SET键无效。 ? 在运行方式菜单层面,按BACK键退出运行方式菜单。 6.11 高级参数设置菜单 ? 在主菜单层面,如高级参数设置菜单(Hsetup)闪烁,按 SET键进入高级参数设置菜单。 ? 在高级参数设置菜单层面,按UP或DOWN键可向上或向security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 53 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 下移动菜单项目。 ? 在高级参数设置菜单层面,按SET键进入正在闪烁的菜单项目。 ? 在高级参数设置菜单层面,按BACK键退出高级参数设置 菜单,如无数据修改,直接返回主菜单。 ? 如有数据修改,系统提示是否要保存。按UP或DOWN键 选择YES或NO选项。SET用于确认。 高级参数缺省值 高级参数设置是为专业人士提供的优化设置选项,普通用户为减化操作,可不设置高级参数,而采用缺省值,或由厂家代为设置。非特殊约定,缺省值如下: 高级参数 缺省值 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratn. Tarints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low on organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioeman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antiidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: oneducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 54 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 460V(100系列) 过压门限 265V(200系列) 300V(100系列) 欠压门限 175V(200系列) 过压回差 10.0V 欠压回差 10.0V 欠流门限 0.0A 投入门限 0.900 切除门限 0.990 电容放电时间 30s 电容投入次数初始值 0 开关最大动作次数 100万次 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 55 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 投入无功电度表底 0.0度 电压总谐波畸变率门5, 限 波特率 9600 校验方式 无校验 过压门限 ? 在高级参数设置菜单层面,如过压门限菜单(H_V)闪烁, 按SET键进入过压门限菜单。 ? 在过压门限菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 ? 在过压门限菜单层面,按SET键使数据的闪烁位右循环,即被修改的位右循环。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratget: onints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low n. Tareman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antion organization design, construction, programming, and develop targeted security measures, and to supervise the implementatiodown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 56 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? 在过压门限菜单层面,按BACK键退出过压门限菜单。 欠压门限 ? 在高级参数设置菜单层面,如欠压门限菜单(L_V)闪烁, 按SET键进入欠压门限菜单。 ? 在欠压门限菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 ? 在欠压门限菜单层面,按SET键使数据的闪烁位右循环,即被修改的位向右循环。 ? 在欠压门限菜单层面,按BACK键退出欠压门限菜单。 过压回差 ? 在高级参数设置菜单层面,如过压回差(H_?V)闪烁,按SET键进入过压回差菜单。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 57 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 在过压回差菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数据递增或递减。 ? 在过压回差菜单层面,按SET键使数据的闪烁位右循环,即被修改的位向右循环。 ? 在过压回差菜单层面,按BACK键退出过压回差菜单。 欠压回差 ? 在高级参数设置菜单层面,如欠压回差菜单(L_?V)闪烁, 按SET键进入欠压回差菜单。 ? 在欠压回差菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 ? 在欠压回差菜单层面,按SET键使数据的闪烁位右循环,即被修改的位向右循环。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 58 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? 在欠压回差菜单层面,按BACK键退出欠压回差菜单。 欠流门限 ? 在高级参数设置菜单层面,如欠流门限(L_I)闪烁,按SET键进入欠流门限菜单。 ? 在欠流门限菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 ? 在欠流门限菜单层面,按SET键使数据的闪烁位右循环,即被修改的位向右循环。 ? 在欠流门限菜单层面,按BACK键退出欠流门限菜单。 投入门限 ? 在高级参数设置菜单层面,如投入门限(L_PF)闪烁,按SET键进入投入门限菜单。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 59 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 在投入门限菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 ? 在投入门限菜单层面,按SET键使数据的闪烁位右循环,即被修改的位向右循环。 ? 在投入门限菜单层面,按BACK键退出投入门限菜单。 切除门限 ? 在高级参数设置菜单层面,如切除门限(H_PF)闪烁,按SET键进入切除门限菜单。 ? 在切除门限菜单层面,所显示值为当前设置数据,按UP或 DOWN键可使闪烁位的数递增或递减。 ? 在切除门限菜单层面,按SET键使数据的闪烁位右循环,即被修改的位向右循环。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratget: onints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low n. Tareman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antion organization design, construction, programming, and develop targeted security measures, and to supervise the implementatiodown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 60 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? 在切除门限菜单层面,按BACK键退出切除门限菜单。 电容放电时间 电容放电时间反应了一级电容切除后再次投入需要等待的最短时间,它根据电容器的放电参数值输入。电容再次投入时要放电到一定程度。 ? 在高级参数设置菜单层面,如电容放电时间(C_Tim)闪烁, 按SET键进入电容放电时间菜单。 ? 在电容放电时间菜单层面,所显示值为当前设置数据,按 UP或DOWN键可使闪烁位的数递增或递减。 ? 在电容放电时间菜单层面,按SET键使数据的闪烁位右循环,即被修改的位向右循环。 ? 在电容放电时间菜单层面,按BACK键退出电容放电时间菜单。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fodecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibi 61 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 电容投入次数初始值 ? 在高级参数设置菜单层面,如电容投入次数初始值菜单 (S_Ori)闪烁,按SET键进入电容投入次数初始值菜单。 ? 在电容投入次数初始值菜单层面,所显示值为当前设置数 据,按UP或DOWN键可使闪烁位的数递增或递减。 ? 在电容投入次数初始值菜单层面,按SET键使数据的闪烁 位右循环,即被修改的位向右循环。 ? 在电容投入次数初始值菜单层面,按BACK键退出电容投入次数初始值菜单。 开关最大动作次数 ? 在高级参数设置菜单层面,如开关最大动作次数(S_Amo) 闪烁,按SET键进入开关最大动作次数菜单。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratget: onints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low n. Tareman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antion organization design, construction, programming, and develop targeted security measures, and to supervise the implementatiodown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 62 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 ? 在开关最大动作次数菜单层面,所显示值为当前设置数据, 按UP或DOWN键可使闪烁位的数据递增或递减。 ? 在开关最大动作次数菜单层面,按SET键使数据的闪烁位 右循环,即被修改的位向右循环。 ? 在开关最大动作次数菜单层面,按BACK键退出开关最大动作次数菜单。 投入无功电度表底 ? 在高级参数设置菜单层面,如投入无功电度表底菜单 (Q_Ori)闪烁,按SET键进入投入无功电度表底菜单。 ? 在投入无功电度表底菜单层面,所显示值为当前设置数据, 按UP或DOWN键可使闪烁位的数递增或递减。 ? 在投入无功电度表底菜单层面,按SET键使数据的闪烁位 右循环,即被修改的位向右 循环。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 63 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 在投入无功电度表底菜单层面,按BACK键退出无功电度表底菜单。 电压总谐波畸变率门限菜单 ? 在高级参数设置菜单层面,如电压总谐波畸变率门限菜单 (U_THD)闪烁,按SET键进入电压总谐波畸变率门限菜 单。 ? 在电压总谐波畸变率门限菜单层面,所显示值为当前设置 数据,按UP或DOWN键可使闪烁位的数递增或递减。 ? 在电压总谐波畸变率门限菜单层面,按SET键使数据的闪 烁位右循环,即被修改的位向右循环。 ? 在电压总谐波畸变率门限菜单层面,按BACK键退出电压 总谐波畸变率门限菜单 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratn. Tarints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low on organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioeman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antiidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: oneducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 64 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 通讯 ? 在高级参数设置菜单层面,如通讯菜单(Commun)闪烁,按SET键进入通讯菜单。 ? 在通讯菜单层面,所显示值为当前的波特率和校验方式, 闪烁的数据可用UP或DOWN键修改。 波特率:1200 / 2400 / 4800 / 9600 / 12800 校验方式:,:奇校验 / ,:偶校验 / —:无校验 ? 在通讯菜单层面,按SET键可在波特率和校验方式之间选择。 ? 在通讯菜单层面,按BACK键退出通讯菜单。 6.12 故障信息菜单 ? 在主菜单层面,故障信息菜单闪烁,按SET键进入故障信security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 65 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 息菜单。 ? 如果控制器测出有错误信息,则进入Error菜单后的第一个 子菜单是Clear Error,按这个菜单可以清除所有的错误信 息,并且可以把开关次数越限报警的那个开关对应的内部 记数器清零。 ? 在故障信息菜单层面,按UP或DOWN键向上或向下移动 菜单项目,查看故障信息,按SET键进入正在闪烁的菜单, 显示有关故障的具体信息;按BACK键从具体信息的菜单 中退出。 ? 在故障信息菜单层面,按BACK键退出故障信息菜单,返回主菜单。 ? ERROR8对应内部故障,这可能涉及FLASH、RAM、测量、 温度、时钟、液晶、通讯等多方面内容。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratget: onints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low n. Tareman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antion organization design, construction, programming, and develop targeted security measures, and to supervise the implementatiodown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-idents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 66 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 内部故障出现概率非常低,它可能是外部干扰(包括温度)或内部器件损坏造成,如果发现内部故障,应及时与公司技术服务部门联系,咨询处理意见。 7. 设备尺寸 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 67 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 设备外壳深度为84mm,加上插拔端子的深度16mm,设备 总深度为100mm。 ? 设备开孔尺寸112mm×112mm。 8. 接线说明 8.1 端子定义 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 68 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 8.2 端子含义 ? UA、UB、UC:A、B、C相电压端;UN:零线电压端。 ? IA、IB、IC:A、B、C相电流端;IN:电流线公共端。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 69 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? GND:通讯电源地;TX:232通讯口输出端;RX:232通讯口输入端。 ? A、B:485通讯端。 ? G:外壳地。 ? COM:输出信号的直流公共端(低电平)或空节点公共端(一般外接交流电源)。 ? K1,K12:12路输出信号端(直流高电平或空节点)。 8.3 100系列控制器输入接线图 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 70 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 8.4 200系列控制器输入接线图 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 71 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 8.5 开关形式与接线 ? 如果选用接触器,COM端接电源线UB,K1,K12接至接 触器线圈的一端,接触器线圈的另一端均接零线。 ? 如果选用晶闸管开关或复合开关,COM端接晶闸管开关或 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 72 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 复合开关的控制负端,K1,K12接至开关的控制正端。 8.6 投切方式与端子分配 循环投切 端子K1,K12分别对应第一级至第十二级的开关。 8421编码 端子K1,K12对应的开关负载容量及电容容量倍数增加。 分相投切 K1、K2、K3分别对应第一级的A、B、C相。 K4、K5、K6分别对应第二级的A、B、C相。 K7、K8、K9分别对应第三级的A、B、C相。 K10、K11、K12分别对应第四级的A、B、C相。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 73 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 综合补偿 若一级分补时,K1、K2、K3分别对应第一级的A、B、C相,端子K4,K12分别对应第二级至第十级的开关。 若两级分补时,K1、K2、K3分别对应第一级的A、B、C相,K4、K5、K6分别对应第二级的A、B、C相,端子K7,K12分别对应第三级至第八级的开关。 9. 调试大纲 9.1 调试前的准备 首先检查运输过程中是否有机械及电器上的损坏,并作妥善处理。 将控制器接地线与补偿箱(屏)的接地可靠连接,同时处damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 74 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 理好箱(屏)的接地。 补偿箱(屏)上电前应确认绝缘和相间阻抗正常。 接通电源后,分别观察面板指示灯状态,如果“工作”灯正常亮,“报警”灯不亮,说明控制器工作正常。 9.2 上电时故障处理 如果工作指示灯不亮,可能原因如下: 输入电压UA未接通,可能原因是断线或电源未合上;控制器有故障。 发现此故障后,首先测试控制器端子上是否有正常的电压。如果无电压,请检查接线是否正确或开关是否合上,及保险管是否熔断;如果有电压,请断电更换控制器。 如果工作指示灯正常亮,而报警灯也亮,原因是报警监控项目出现超标,如缺相、欠压、过压等问题发生。 security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 75 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, 此时应操作面板,翻阅故障记录信息,确认故障种类,并排除故障。 9.3 参数整定 参考操作指南,设置有关控制参数。 一般用户可只设定基本设置,专业用户可设定高级设置,优化设备功能。 设置可通过面板完成,带通讯功能的控制器也可就地通过微机或远方后台来完成设定。 9.4 启用自动运行功能 用户可直接设定控制器为自动运行状态,控制器将开始自动运算和投切补偿电容。 9.5 注意事项 ? 接线松动是设备故障的重要原因,应注意查找接线有无松damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 76 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, KWWB系列无功补偿控制器使用说明书 动。 ? 对比控制器显示的电气数据和用仪器测试的电气数据是否一致也是发现故障的重要渠道。 10. 订货及验收 订货时用户需提供如下信息: ? 产品型号 ? 输出节点数 ? 输出节点形式(空节点,直流电平) ? 电平值(如果是直流电平) 用户在收到产品拆封后,请检查如下内容: ? 控制器是否有破损和型号不对应等问题。 ? 产品说明书(一本) security policies and laws and regulations for project management and construction personnel security awareness, tionalrget decomposition following: a, and project manager project safety first responsibility people. Target: implementation of nave implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security taaccident for total target, effecti-cus parts (dangerous points, and source), and except hidden, and anti1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught fo-4-sition (reference) Ann 24 Project Department safety target decompo-the team penalized. Project safety objective management network diagram 2 80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below-qualified, 70the unach month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for y record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks ectivitmajor accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an aersonnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, ions pl requirements relating to construction of the project, doing the construction work. 2, special operations. Special operatwithout the use of a variety of electrical facilities and temporary power lines. According to the parent company and mentaeld, otective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the fi1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal pr ents:objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirem ning safety management work, earnestly implement the responsibility system for production safety, achieving safety management3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthe-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-uction: site Office Tel: 2Project management roster project name: constr safety standards of civilization applied objective Note: assigned by the higher authorities. 1 injury control index of construction -orm table construction safety management objectives of the project (s): project name: Ann 2lity target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation fcurity responsibidecomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project se 77 decomposition and the decomposition network figure (according to safety guarantee system for decomposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 2-1 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 2-2 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 2-3, assessment agencies in order to further implement "safety first, prevention first" approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent company and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must complete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct comprehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 70-80 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 2-4 Project Department safety target decomposition (reference) Ann 2-4-1 for implement "security first, prevention" approach, implemented "who tube who is responsible for" principles, to caught focus parts (dangerous points, and source), and except hidden, and anti-accident for total target, effective implement safety target accountability, closely control and prevention "three big hurt" of occurred, developed security target decomposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness, ? 产品合格证(一张) ? 安装支架(一对) 如发现有上述材料不全或设备有破损等问题,请及时与我 公司客户服务部们联系,联系电话:(010)51287946 62980485 62963649。 damage primary responsibility over the accident. 15 occurred property loss Yuan above negative main responsibility traffic acround deaths or property -round construction site fire accident occurs 15 fire accident to a deduction of 15 points of traffic safety (15 minutes) year-). Quarterly checks from 10, has failed to meet the fire safety fine deducted 10 points (15 points) yearr cente up% 5 each found a people no card induction buckle 1 points Construction site by ministerial standards of high level (80 pered accident a people buckle 20 points occurred death accident buckle 35 points special job card induction card induction ratints) annual no injured, and death accident, injury accident frequency not over ‰ 35 occurred inju5 target category index content score buckle points standard buckle points responsibility people construction security (50 po-eference) project manager: Ann 2t exceeding births.a Security responsibility target assessment standard (rdown, safety training, and ensure a reliable security protection to ensure heavy casualties to zero, frequency of injuries no-production teams of security technology to give the low eman,gement. Target: implementation of the construction organization design and construction programme, becomes a good part of forbirths. C, responsibility for Foreman is responsible for safe production and civilized construction in construction site mana accident is zero, the injury rate does not exceedviolation"; prevent accident hazards, handling illegal supervise full compliance obedience; collection of information. Major -"three-to standards and specifications, checking for problems and loopholes, antidown the foreman. Safety officer responsible for safety management, safety and security inspection. Objective: according -wnational standards system construction organization plan, and sent by program, implemented security technology to give the lo-get: onn. Taron organization design, construction, programming, and develop targeted security measures, and to supervise the implementatioidents, occupational injury rate shall not exceed the higher order births. B, project engineer responsible for the constructieducation, training, and responsibility for security at all levels, security funds ensure that projects significant acc4 points total project manager safety of security activities, deficiency 1 times buckledown, deficiency 1 times buckle 4 points active carried out security activities 4 Active participate in company organization -down 4 security education, and low-ints seriously for security education, and lowe 4 poinite measures, and found passengers buckle 4 points injury accident report 4 injury accident report not timely 1 times buckls major accident hidden timely rectification rate up 100% 4 hidden rectification not timely, and indefinite people, and indefpoint cident buckle 15 points security management (20 points) compliance chapter obedience 4 found "three against" 1 times buckle 1 78
本文档为【KWWB系列无功补偿控制器说明书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_721103
暂无简介~
格式:doc
大小:1MB
软件:Word
页数:317
分类:生活休闲
上传时间:2017-09-18
浏览量:30