希尔顿酒店设计和施工标准
区别文件
HILTON HOTEL
希尔顿酒店
This standard document differentiates between items furnished by FF&E versus items furnished by the General Construction Contract. It also designates the responsible party for budgeting, designing, construction documentation, purchasing and installing. This document pertains only to the items listed and does not purport to cover all items that are FF&E or all items that are General Construction. Except as specifically noted to the contrary, installation shall be complete including labor, materials equipment, installation, taxes, fees and freight.
本标准文件在家具、固定装置和设备预算(FF&E)的
规定
关于下班后关闭电源的规定党章中关于入党时间的规定公务员考核规定下载规定办法文件下载宁波关于闷顶的规定
内容与《一般施工合同》规定
内容之间加以区别,并指定了预算、设计、施工文件编制、采购和安装的负责方。本文
件仅针对所列内容,而无意于涵盖所有FF&E 内容或所有一般施工内容。除特别做出相
反规定外,所有安装均应为完整项目,其中应包括人工、材料设备、安装、税费、手续
费和运费。
All parties concerned on each project should carefully review this document for item changes specific to that project, and make changes as appropriate. 各项目相关方应认真查阅本文件,了解相应项目的具体变更内容并做出适当调整。
SYMBOLS
符号
A ARCHITECT
A 建筑师
1
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
AC ACOUSTICAL CONSULTANT AC 声学顾问
AV AUDIO VISUAL CONSULTANT AV 视听顾问
C BASIC CONSTRUCTION BUDGET C 基本施工预算
CE CONSTRUCTION ESTIMATOR CE 施工预算员
EC ELEVATOR CONSULTANT EC 电梯顾问
EE ELECTRICAL ENGINEER EE 电气工程师
FF&E FURNITURE, FIXTURES AND EQUIPMENT BUDGET
FF&E 家具、固定装置和设备预算
FP FIRE PROTECTION CONSULTANT FP 消防顾问
G GRAPHICS DESIGNER
G 图案设计师
GC GENERAL CONTRACTOR GC 总承包商
I INTERIOR DESIGNER
I 室内设计师
IN INSTALLATION CONTRACTOR FOR FF&E ITEMS
IN FF&E 项目安装承包商
K KITCHEN, BAR, AND FOOD SERVICE CONSULTANT
K 厨房、酒吧及餐饮服务顾问
KC KITCHEN CONTRACTOR KC 厨房承包商
L LAUNDRY CONSULTANT
L 洗衣房承包商
LC LANDSCAPE CONSULTANT LC 景观顾问
LT LIGHTING CONSULTANT
2
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
LT 照明顾问
ME MECHANICAL ENGINEER
ME 机械工程师
PA PURCHASING AGENT FOR FF&E ITEMS PA FF&E 项目采购代理
S SYSTEMS CONSULTANT
S 系统顾问
V VENDOR
V 厂商
3
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人 100 PUBLIC AREAS
100 公共区
A. FINISHES Floor Carpet and Pad FF&E I I I PA Carpet Installation C CE I I/A GC - Marble/Decorative Tile/Wood C CE I/A A GC GC Vinyl Tile C CE I/A A GC GC Architectural Concrete C CE A A GC GC Wall Millwork C I/CE I I/A GC GC Vinyl Wall Covering FF&E I I I PA VWC Installation C CE I I/A GC - Antibacterial Paste C CE A/I A GC GC Paint C CE I/A I/A GC GC Other (Paneling, Marble) C I/CE I I/A GC GC Base Marble/Decorative Tile/Wood C CE I A/I GC GC Vinyl C CE I/A A/I GC GC Ceiling Support System C CE I/A A GC GC Painted/Sprayed Surface C CE I/A A GC GC Millwork/Decorative C I/CE I I/A GC GC B. DOORS AND STOREFRONT INCLUDING HARDWARE AND EXTERIOR TRIM
Located in Exterior Wall C CE A A GC GC Interior (Doors) C CE I/A I/A GC GC C. MILLWORK Cabinet Work (Bars/Buffets) C I/CE I I/A GC GC Plumbing Fixtures Within C CE I/ME ME/I GC GC Electrical Within C CE I I/EE GC GC Applied Decorative-Incl. Door & Win C CE I I/A GC GC
4
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人 D. ELECTRICAL Conduit, Cable & All Wiring Devices C CE EE EE GC GC All Exposed Switches & Receptacles for Lights C CE I/EE EE PA GC Power to TV & Telephones
Installation of Fixtures C CE I/EE EE GC GC E. LIGHTING
Decorative
Plug-in Fixtures FF&E I I I PA IN
Light Bulbs FF&E I I I PA IN
Direct Wire
Fixtures FF&E I I/LT I/A/EE PA GC
Install C CE I/LT I/A/EE GC GC
Light Bulbs C CE I I/EE GC GC
Support Blocking C CE A/I A/I GC GC
Track Lighting (incl. lights & bulbs) C CE I/LT I/EE GC GC
Dimming Systems C CE I/LT I/EE GC GC
General Illumination C CE I/EE I/EE GC GC
Exterior Illumination C CE A/LT A/EE GC GC F. ELEVATORS
Machines, Equipment & System C CE A/EC A/EC GC GC Cab Interior C CE I /A GC GC G. HVAC
Diffusers, Grilles and Registers C CE I/ME ME/I GC GC H. PLUMBING
Basic System C CE ME ME GC GC Fixtures C CE A/I/ME ME/A GC GC I. FIRE PROTECTION
Sprinklers (Including Heads) C CE FP/ME ME GC GC Smoke Detectors C CE FP/ME EE GC GC Emergency Voice Communications C CE FP/ME EE GC GC Fire Extinguisher Cabinet C CE FP/A A/I GC GC Fire Extinguisher C CE FP/A A GC GC
5
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人 Fire Annunciator Panels C CE FP/ME EE GC GC
J. GENERAL SYSTEMS
Telephone Conduit, Cores, Pullboxes, Junction Boxes, C CE EE/A EE/A GC GC Plywood Backboards Grounding w/pull wire
Cable & Wiring Devices C CE EE/S S PA V Equipment & Installation FF&E S EE/S S PA V Master Antenna
Conduit Cable C CE EE/A EE/A GC GC
Equipment & Installation C CE EE/A EE/A GC GC Employee Radio Page System
Conduit Cable C CE EE EE GC GC
Equipment & Installation FF&E S S/V PA V
Security/TV Surveillance Systems
Conduit (Empty) C CE EE EE GC GC
Cable, Power & Installation C CE S EE/S/V GC GC
Cameras & Movable Equipment FF&E S EE/S EE GC GC Sound System
Conduit (Empty) C CE S/EE EE GC GC
Equipment/Cable & Installation C S S EE GC GC Computer System Conduit w/Pull Wire, Backboard, Grounding C CE EE EE GC GC
Cable & Wiring Device C CE EE/S EE/S/V PA V
Equipment & Installation FF&E S S S/V PA V Dedicated Circuit/UPS/”Clean” Electrical Supply C CE S/EE EE GC GC F & B Point of Sale Register
Conduit with Pull Wire C CE EE EE GC GC
Cable, Equipment & Installation FF&E S S EE PA V
Dedicated Electrical Supply C CE EE EE GC GC
K. MISCELLANEOUS
Planters (Interior)
Fixed C CE I/A A GC GC
Movable FF&E I I I PA PA/IN
6
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人
Plants FF&E I I/LC I/LC PA PA/LC Directional Graphics
Exit Signs C CE A/EE A/EE GC GC
Display Graphics FF&E I I/G I/G PA IN/V Exterior Signage
Signs FF&E V/OP A/G A/G PA V
Electrical C CE V/EE EE GC GC Artwork and Artifacts FF&E I I I PA PA/IN
Blocking/Support C CE I/A A GC GC
L. FOOD AND BEVERAGE/BANQUET FACILITIES
Operable Partitions (Excluding Wall Covering C CE I/A A GC GC Materials)
Wall Covering Materials FF&E I I I GC GC
Wall Covering Installation C I I I GC GC
Dance Floors (Movable FF&E I/PA I I PA PA/IN
M. LOBBY, CIRCULATION AND OFFICE SPACES Telephone Booths C CE I I/A GC GC Cashier‘s Vault & Drop Safe
(1 locates, OP buys & installs) FF&E I/PA PA PA/IN
Safe Deposit Boxes FF&E I/PA PA IN
Fountains, Decorative GC CE I/A I/A GC GC Related Mechanical/Electrical C CE I/ME I/ME GC GC
N. TOILET ROOMS – SERVING PUBLIC SPACES
Fixtures C CE A/I A/ME GC GC Partitions C CE A/I A/I GC GC Accessories C CE A/I A/I GC GC
7
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人 200 GUESTROOM AREAS/CORRIDORS
A. FINISHES Floor
Carpet and Pad FF&E I I I/A PA
Carpet and Pad GC CE I I/A PA GC
Marble/Decorative Tile/Wood C CE I/A A GC GC
Architectural Concrete C CE A A GC GC Walls
Vinyl Wall Covering FF&E I I I PA
VWC Installation C CE I I/A GC
Antibacterial Paste C I I I/A GC GC
Millwork C I/CE I/A I/A GC GC
Marble, Decorative Tile C CE I/A A GC GC Base
Tile Marble or Granite in Guest Baths C CE I/A A GC GC
(Walls, Floors & Base)
Wood (Suites) C CE I/A A GC GC Ceiling
Applied Texture C CE A A GC GC
Suspended (I Provides Profile of Material, C CE I/A A GC GC
Framing for Attachment is by A)
B. DOORS Doors, Hardware and Trim C CE I/A A GC GC C. MILLWORK Fixed Cabinet Work C CE I/A A GC GC Mini-bar enclosure, Granite Counter-Top, C CE I/A A GC GC Mirror At Back Wall & Glass Shelves
Bath Granite Counter-Top & Back Splash C CE I/A A GC GC D. PLUMBING Plumbing Fixtures within Guestroom area C CE A A GC GC E. ELECTRICAL Conduit, Cable & All Wiring Devices C CE EE EE GC GC Master Antenna
8
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人
Conduit (Empty) C CE EE EE GC GC
Equipment/Cable & Install C CE EE EE GC GC Employee Radio Page System
Equipment/Installation FF&E S S/V PA V
Security/TV Surveillance System
Conduit (Empty) C CE S/EE EE GC GC
Cable & Installation C CE S/EE EE GC GC
Camera, Movable Equipment C PA S/EE S/EE GC GC
F. MISCELLANEOUS Planters (Interiors)
Fixed C CE I/A A GC GC
Movable FF&E I I I PA IN Directional Graphics & Room Numbers FF&E G G G PA IN Linen Chutes C CE A A GC GC Art Work FF&E I I I PA IN
G. GUEST ROOM SPECIALTIES Television Sets FF&E PA PA PA IN
Mini Bars FF&E PA PA PA IN
Radios FF&E PA PA PA IN
Bathroom Hardware & Fixtures C CE I/A A GC GC Bathroom Mirrors C CE I/A A GC GC Closet Doors & Finish Hardware C CE I/A A GC GC Closet Shelves, Coat Rods & Hooks C CE I/A A GC GC Draperies & Rods FF&E I I I PA IN
Blocking C CE I/A A GC GC Jacuzzi, Sauna, Etc C CE A/I A/ME GC GC Attached Bathroom Accessories C CE A/I A GC GC (Including Handicapped)
Blocking C CE A/I A GC GC Towels, Bathroom & Loose Accessories FF&E PA PA PA IN -
9
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人
400 SERVICE AREAS
A. FINISHES Floors
Carpet and Pad FF&E I I I PA
Carpet Installation C CE I I/A GC -
Vinyl, Quarry or Ceramic Tile C CE I/A A GC GC
Architectural Concrete C CE A A GC GC Wall
Vinyl Wall Covering FF&E I I I PA
VWC Installation C CE I I/A GC -
Antibacterial Paste C CE A/I A GC GC
Paint C CE I/A I/A GC GC Base
Ceramic or Quarry C CE I/A A GC GC
Vinyl C CE I/A A GC GC Ceiling
Support System C CE A A GC GC
Painted/Sprayed Surface C CE A A GC GC
B. DOORS & STOREFRONT INCLUDING HARDWARE & EXTERIOR TRIM
Frame & Door C CE A A GC GC Hardware C CE A A GC GC
C. MILLWORK Cabinet Work (Offices) C CE I A/I GC GC Cabinet Work (Food Service Areas) C CE K A GC GC Plumbing Fixtures C CE ME ME GC GC Electrical Within C CE EE EE GC GC Utility Shelving,Storage(Fixed)-wood C CE A A GC GC
D. ELECTRICAL Conduit, Cable & All Wiring Devices C CE EE EE GC GC All Exposed Switches & Receptacles for C CE A/EE A/EE GC GC Lights, Power to Televisions & Telephone
10
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人 E. LIGHTING Direct Wire C CE A/EE A/EE GC GC
Support Blocking C CE A A GC GC F. ELEVATORS (SERVICE) Machines, Equipment & System C CE A/EC A/EC GC GC Cab Interior C CE A A GC GC G. HVAC Basic System C CE A/ME ME/A GC GC H. PLUMBING Basic System C CE A/ME ME/A GC GC Fixtures C CE A/ME ME/A GC GC I. FIRE PROTECTION Sprinklers (Including Heads) C CE FP/ME ME GC GC Smoke Detectors C CE FP/ME EE GC GC Emergency Voice Communications C CE FP/ME EE GC GC Fire Extinguisher Cabinet C CE FP/A A GC GC Fire Extinguisher C CE FP/A A GC GC Pull Stations/Lights C CE FP/ME EE/A GC GC Fire Annunciator Panels C CE FP/ME EE/A GC GC J. GENERAL SYSTEMS Telephone Conduit, Cores, Pullboxes, Junction Boxes, C CE EE/A EE/A GC GC Plywood Backboards, Grounding, w/Pull Wire
Cable & Wiring Device C CE EE/S S PA V
Equipment & Installation FF&E S EE/S S PA V Master Antenna
Conduit Cable EE/A EE/A C CE GC GC
Equipment & Installation EE/A EE/A C CE GC GC Employee Radio Page System
Conduit Cable C CE EE EE GC GC
Equipment & Installation FF&E S S/V PA V
Security/TV Surveillance Systems
Conduit (Empty) C CE EE EE GC GC
11
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人
Cable, Power & Installation C CE S EE/S/V GC GC
Cameras & Movable Equipment FF&E S EE/S EE GC GC Sound System
Conduit (Empty) S/EE EE C CE GC GC
Equipment/Cable & Installation S S EE C GC GC Computer System Conduit w/Pull Wire, Backboard Grounding C CE EE EE GC GC
Cable & Wiring Devices C CE EE/S EE/S/V PA V
Equipment & Installation FF&E S S S/V PA V Dedicated Circuit/UPS/”Clean” Electrical Supply C CE S/EE EE GC GC F & B Point of Sale Register
Conduit with Pull Wire C CE EE EE GC GC
Cable, Equipment & Installation FF&E S S EE PA V
Dedicated Electrical Supply C CE EE EE GC GC
K. MISCELLANEOUS Directional Graphics FF&E G G G PA IN Exit & Required Signs C CE A/EE A/EE GC GC
12
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人
400 SERVICE AREAS Wall Protection (Bumpers) C CE A A GC GC Corner Guards
Kitchen Areas C KC/CE KC KC GC GC
B.O.H C CE A A GC GC Security Fence C CE A A GC GC Dock Leveler C CE A A GC GC Trash Compactor FF&E KC KC KC/A PA V Lockers & Benches C CE A A GC GC Shelving (Knockdown) FF&E PA IN
Key File/Cabinet FF&E PA IN
Laundry Equipment (Set in Place) FF&E LC LC LC/A PA V Final Connections, Interconnections C CE A/LC/ME LC/ME GC GC Rough-In C CE A/LC/ME ME GC GC
13
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
Contract Budget Estimate Design Purchased Installed Doc’s By DESCRIPTION Category By By By By 合同文件 名称 预算类别 估算人 设计人 采购人 安装人 编制人
401 KITCHENS, PANTRIES BAR
Kitchen Exhaust Ventilation C CE K/M ME GC GC Duct Work & Fans C CE K/ME ME GC GC Hoods & Installation C K K K GC GC/KC Fire Suppression System C K K K GC GC/KC Walk-In Refrigeration C K K K/A GC GC/KC Pre-Fab Boxes & Refrigeration C K K K/A GC GC/KC Insulated Floor Slab & Finish C CE K/A A GC GC Conduit for Refrigeration Lines & Control C CE K ME GC GC Slab Depression C CE K/A A GC GC Kitchen & Bar Equipment C K K K GC GC/KC
Final Connection & Interconnection C CE K/ME K/ME GC GC
Blocking (As Required) C CE K/A A GC GC
Rough-In C CE K/ME K/ME GC GC Hand Sinks & Drinking Fountains FF&E K K/ME K/ME GC GC Floor Sinks, Trench Drains & Grates C CE K/A K/ME GC GC/KC Work Tables and Shelves FF&E K K K GC V/KC Beverage Dispensing System
Conduit for Beverage Lines w/Pull C CE K/ME ME GC GC
Beverage Lines FF&E K K K PA V
605 SWIMMING POOL Pool C CE A A GC GC Equipment C CE A/ME A/ME GC GC
14
叶予舜 7/29/2012 12:05:40 AM
希尔顿酒店设计和施工标准
15
叶予舜 7/29/2012 12:05:40 AM