首页 国家安全社区建设基本要求

国家安全社区建设基本要求

举报
开通vip

国家安全社区建设基本要求国家安全社区建设基本要求 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 ...

国家安全社区建设基本要求
国家安全社区建设基本要求 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 国家安全社区建设基本要求AQ/T9001-2006 1 范围 本 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 规定了安全社区建设的基本要求, 旨在帮助社区规范事故与伤害预防和安全促进工作,持续改进安全绩效。 本标准适用于通过安全社区建设,最大限度地预防和降低伤害事故,改善社区安全状况,提高社区人员安全意识和安全保障水平的社区。本标准供从事安全管理、事故与伤害预防和社区工作的人员使用。 2 规范性引用文件 下列文件中的条款通过本标准的引用而成为本标准的条款。凡是注日期的引用文件,其随后所有的修改单(不包括勘误的内容)或修订版均不适用于本标准,然而,鼓励根据本标准达成协议的各方研究是否可使用这些文件的最新版本。凡是不注日期的引用文件,其最新版本适用于本标准。 2.1 ILO/OSH2001:职业安全健康管理体系 导则,国际劳工组织; 2.2 世界卫生组织 2002:安全社区准则; 2.3 GB/T28001-2001:职业健康安全管理体系 规范。 3 术语 3.1 安全 safety 免除了不可接受的事故与伤害风险的状态。 3.2 社区 community 聚居在一定地域范围内的人们所组成的社会生活共同体。 3.3 安全社区 safe community 建立了跨部门合作的组织机构和程序,联络社区内相关单位和个人共同参与事故与伤害预防和安全促进工作,持续改进地实现安全目标的社区。 3.4 安全促进 safe promotion temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 为了达到和保持理想的安全水平,通过策划、组织和活动向人群提供必须的保障条件的过程。 3.5 伤害 injury 人体急性暴露于某种能量下,其量或速率超过身体的耐受水平而造成的身体损伤。 3.6 事故 accident 造成人员死亡、伤害、疾病、财产损失或其他损失的意外事件。 3.7 事件 incident 导致或可能导致事故与伤害的情况。 3.8 危险源 hazard 可能造成人员死亡、伤害、疾病、财产损失或其他损失的根源或状态。 3.9 事故隐患 accident potential 可导致事故与伤害发生的人的不安全行为、物的不安全状态、不良环境及管理上的缺陷。 3.10 风险 risk 特定危害性事件发生的可能性与后果的结合。 3.11 风险 评价 LEC评价法下载LEC评价法下载评价量规免费下载学院评价表文档下载学院评价表文档下载 risk assessment 评价风险程度并确定其是否在可接受范围的全过程。 3.12 绩效 performance 基于安全目标,与社区事故与伤害风险控制相关活动的可测量结果。 3.13 目标 objectives 社区在安全绩效方面要达到的目的。 3.14 不符合 non-conformance 任何与工作标准、惯例、程序、法规、绩效等的偏离,其结果能够直接或间接导致事故、伤害或疾病,财产损失、工作环境破坏或这些情况的组合。 3.15 持续改进 continual improvement 为了改进安全总体绩效,社区持续不断地加强事故与伤害预防工作的过程。 rotection measures. Piling piling machinery, machinery,proof, Sun p-proof, shock-rements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosioneathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requish-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-ump power cable insulationhes push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pswitcoxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving b ctly,asures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correprotection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection me lding machine zero connection protection, leakagetype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-head lines, the operator should wear insulated shoes, wear insulated gloves; Frogerdevice shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric ovheld electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective -andzero connection protection is good. Shield inspection date 4 h-way push switches; Leakage protection sensitive effective ground-onerd, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be ents. Inspection date 3 chain saws (circular saws), guaback safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirem-Plane blade with protective hand guard, rolling plane equipped with spring tion;Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operasafety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. lever s, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, andle; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission partreliabion smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installat16 organization name project -bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5 2 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 4 安全社区基本要素 4.1 安全社区创建机构与职责 建立跨部门合作的组织机构,整合社区内各方面资源,共同开展社区安全促进工作,确保 安全社区建设的有效实施和运行。 安全社区创建机构的主要职责包括: a)组织开展事故与伤害风险辨识及其评价工作; b)组织制定体现社区特点的、切实可行的安全目标和 计划 项目进度计划表范例计划下载计划下载计划下载课程教学计划下载 ; c)组织落实各类安全促进项目的实施; d)整合社区内各类资源,实现全员参与、全员受益,并确保能够顺利开展事故与伤害预防 和安全促进工作; e)组织评审社区安全绩效; f)为持续推动安全社区建设提供组织保障和必要的人、财、物、技术等资源保障。 4.2 信息交流和全员参与 社区应建立事故和伤害预防的信息交流机制和全员参与机制。 a)建立社区内各职能部门、各单位和组织间的有效协商机制和合作伙伴关系; b)建立社区内信息交流与信息反馈渠道,及时处理、反馈公众的意见、建议和需求信息, 确保事故和伤害预防信息的有效沟通; c) 建立群众组织和志愿者组织并充分发挥其作用,提高全员参与率; d) 积极组织参与国内外安全社区网络活动和安全社区建设经验交流活动。 4.3 事故与伤害风险辨识及其评价 ortrait () mm, transverse () mm pole joints should be staggered, long barrtical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, prt, veanization design requirements, support height () when m, between columns of the level of support set () road horizontal suppoottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction orglumn bas used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable coial: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; down material full 2 support material support column mater-down, low-approval procedures complete, job Qian should for security lowct check requirements behave records results 1 construction programme programme full, support system design calculation, and 6 serial number check proje-test State observer records form template project name: construction site: construction: support materials: Ann 5-s this this cumulation Engineering formwork supporting system selftoday this thiDay, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5-nch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5mounted on scaffolding or tree bra voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-r, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up lowpoo ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ing wires should be fixed on the insulators;held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Light-2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights handm the the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground frof insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line use o p distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited thection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set uline protetemporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage 3 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 建立并保持事故与伤害风险辨识及其评价制度,开展危险源辨识、事故与伤害隐患排查等 工作,为制定安全目标和计划提供依据。 事故与伤害风险辨识及其评价内容应包括: a) 适用的安全健康法律、法规、标准和其他要求及执行情况; b) 事故与伤害数据分析; c) 各类场所、环境、设施和活动中存在的危险源及其风险程度; d) 各类人员的安全需求; e) 社区安全状况及发展趋势分析; f) 危险源控制措施及事故与伤害预防措施的有效性。 事故与伤害风险辨识及其评价的结果是安全社区创建工作的基础,应定期或根据情况变化 及时进行评审和更新。 4.4 事故与伤害预防目标及计划 根据社区实际情况和事故与伤害风险辨识及其评价的结果制定安全目标,包括不同层次、 不同项目的工作目标以及事故与伤害控制目标,并根据目标要求制定事故与伤害预防计划。计 划应: a) 覆盖不同的性别、年龄、职业和环境状况; b) 针对社区内高危人群、高风险环境或公众关注的安全问 快递公司问题件快递公司问题件货款处理关于圆的周长面积重点题型关于解方程组的题及答案关于南海问题 ; c) 能够长期、持续、有效地实施。 4.5 安全促进项目 为了实现事故与伤害预防目标及计划,社区应组织实施多种形式的安全促进项目。 4.5.1 安全促进项目的重点应针对高危人群、高风险环境和弱势群体,并考虑下列内容: a) 交通安全; rotection measures. Piling piling machinery, machinery,proof, Sun p-proof, shock-rements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosioneathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requish-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-ump power cable insulationhes push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pswitcoxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving b ctly,asures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correprotection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection me lding machine zero connection protection, leakagetype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-head lines, the operator should wear insulated shoes, wear insulated gloves; Frogerdevice shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric ovheld electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective -andzero connection protection is good. Shield inspection date 4 h-way push switches; Leakage protection sensitive effective ground-onerd, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be ents. Inspection date 3 chain saws (circular saws), guaback safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirem-Plane blade with protective hand guard, rolling plane equipped with spring tion;Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operasafety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. lever s, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, andle; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission partreliabion smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installat16 organization name project -bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5 4 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar b) 消防安全; c) 工作场所安全; d) 家居安全; e) 老年人安全; f) 儿童安全; g) 学校安全; h) 公共场所安全; i) 体育运动安全; j) 涉水安全; k) 社会治安; l) 防灾减灾与环境安全。 4.5.2 安全促进项目的实施方案内容应包括: a) 实施该项目的目的、对象、形式及方法; b) 相关部门和人员的职责; c) 项目所需资源的配置和实施的时间进度表; d) 项目实施的预期效果与验证方法及标准。 4.6 宣传教育与培训 社区应有安全教育培训设施,经常开展宣传教育与培训活动,营造安全文 化氛围。宣传教 育与培训活动应针对不同层次人群的安全意识与能力要求制定相应的方案,以 提高社区人员安 全意识和防范事故与伤害的能力。 宣传教育与培训方案应: a) 与事故和伤害预防的目标及计划内容一致; b) 充分利用社会和社区资源; c) 立足全员宣传和培训,突出对事故与伤害预防知识的培训和对重点人 群的专门培训; d) 考虑不同层次人群的职责、能力、文化程度以及安全需求; ortrait () mm, transverse () mm pole joints should be staggered, long barrtical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, prt, veanization design requirements, support height () when m, between columns of the level of support set () road horizontal suppoottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction orglumn bas used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable coial: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; down material full 2 support material support column mater-down, low-approval procedures complete, job Qian should for security lowct check requirements behave records results 1 construction programme programme full, support system design calculation, and 6 serial number check proje-test State observer records form template project name: construction site: construction: support materials: Ann 5-s this this cumulation Engineering formwork supporting system selftoday this thiDay, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5-nch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5mounted on scaffolding or tree bra voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-r, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up lowpoo ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ing wires should be fixed on the insulators;held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Light-2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights handm the the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground frof insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line use o p distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited thection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set uline protetemporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage 5 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar e) 采取适宜的方式,并规定预期效果及检验方法。 4.7 应急预案和响应 对可能发生的重大事故和紧急事件,制定相应的应急预案和程序,落实预防措施和具体应 急响应措施,确保应急预案的培训与演练,减少或消除事故、伤害、财产损失和环境破坏,在 发生紧急情况时能做到: a) 及时启动相应的应急预案,保障涉险人员安全; b) 快速、有序、高效地实施应急响应措施; c) 组织现场及周围相关人员疏散; d) 组织现场急救和医疗救援。 4.8 监测与监督 制定不同层次和不同形式的安全监测与监督方法,监测事故与伤害预防目标及计划的实现 情况。建立社区内政府和相关部门的行政监督,企事业单位、群众组织和居民的公众监督以及 媒体监督机制,形成共建社区和共管社区的氛围。 安全监测与监督内容应包括: a) 事故与伤害预防目标的实现情况; b) 安全促进计划与项目的实施效果; c) 重点场所、设备与设施安全管理状况; d) 高危人群与高风险环境的管理情况; e) 相关安全健康法律、法规、标准的符合情况; f) 社区人员安全意识与安全文化素质的提高情况; g) 工作、居住和活动环境中危险有害因素的监测; h) 全员参与度及其效果; i) 事故、伤害、事件及不符合的调查。监测与监督结果应形成文件。 4.9 事故与伤害记录 rotection measures. Piling piling machinery, machinery,proof, Sun p-proof, shock-rements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosioneathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requish-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-ump power cable insulationhes push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pswitcoxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving b ctly,asures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correprotection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection me lding machine zero connection protection, leakagetype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-head lines, the operator should wear insulated shoes, wear insulated gloves; Frogerdevice shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric ovheld electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective -andzero connection protection is good. Shield inspection date 4 h-way push switches; Leakage protection sensitive effective ground-onerd, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be ents. Inspection date 3 chain saws (circular saws), guaback safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirem-Plane blade with protective hand guard, rolling plane equipped with spring tion;Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operasafety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. lever s, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, andle; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission partreliabion smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installat16 organization name project -bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5 6 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 建立事故与伤害记录制度,明确事故与伤害信息收集渠道,为实现持续改进提供依据。事故与伤害记录应能提供以下信息: a) 事故与伤害发生的基本情况; b) 伤害方式及部位; c) 伤害发生的原因; d) 伤害类别、严重程度等; e) 受伤害患者的医疗结果; f) 受伤害患者的医疗费用等。 记录应实事求是,具有可追溯性。 4.10 安全社区创建档案 建立规范、齐全的安全社区创建档案,将创建过程的信息予以保持,包括: a) 组织机构、目标、计划等相关文件; b) 相关管理部门的职责,关键岗位的职责; c) 社区重点控制的危险源,高危人群、高风险环境和弱势群体的信息; d) 安全促进项目方案; e) 安全 管理制度 档案管理制度下载食品安全管理制度下载三类维修管理制度下载财务管理制度免费下载安全设施管理制度下载 、安全作业指导书和其他文件。 f) 安全社区创建活动的过程记录。包括:创建活动的过程、效果记录;安全检查和监测与监督的记录等。 安全社区创建档案的形式包括文字(书面或电子文挡)、图片和音像资料等。 社区应制定安全社区创建档案的管理办法,明确使用、发放、保存和处置要求。 4.11 预防与纠正措施 针对安全监测与监督、事故、伤害、事件及不符合的调查,制定预防与纠正措施并予以实施。对预防与纠正措施的落实情况应予以跟踪,确保: a) 不符合项已经得到纠正; b) 已消除了产生不符合项的原因; c) 纠正措施的效果已达到计划要求; ortrait () mm, transverse () mm pole joints should be staggered, long barrtical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, prt, veanization design requirements, support height () when m, between columns of the level of support set () road horizontal suppoottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction orglumn bas used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable coial: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; down material full 2 support material support column mater-down, low-approval procedures complete, job Qian should for security lowct check requirements behave records results 1 construction programme programme full, support system design calculation, and 6 serial number check proje-test State observer records form template project name: construction site: construction: support materials: Ann 5-s this this cumulation Engineering formwork supporting system selftoday this thiDay, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5-nch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5mounted on scaffolding or tree bra voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-r, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up lowpoo ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ing wires should be fixed on the insulators;held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Light-2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights handm the the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground frof insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line use o p distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited thection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set uline protetemporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage 7 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar d) 所采取的预防措施能防止同类不符合的产生。 社区内部条件的变化(如场所、设施及设备变化、人群结构变化等)和外部条件的变化(如法律法规要求的变化、技术更新等)对社区安全的影响应及时进行评价,并采取适当的纠正与预防措施。 4.12 评审与持续改进 社区应制定安全促进项目、工作过程和安全绩效评审方法,并定期进行评审,为持续不断地开展安全社区建设提供依据。 评审内容应包括: a) 安全目标和计划; b) 安全促进项目及其实施过程; c) 安全社区建设效果。 d) 确定应持续进行或应调整的计划和项目; e) 为新一轮安全促进计划和项目提供信息。 社区应持续改进安全绩效,不断消除、降低和控制各类事故与伤害风险,促进社区内所有人员安全保障水平的提高。 rotection measures. Piling piling machinery, machinery,proof, Sun p-proof, shock-rements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosioneathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requish-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-ump power cable insulationhes push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pswitcoxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving b ctly,asures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correprotection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection me lding machine zero connection protection, leakagetype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-head lines, the operator should wear insulated shoes, wear insulated gloves; Frogerdevice shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric ovheld electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective -andzero connection protection is good. Shield inspection date 4 h-way push switches; Leakage protection sensitive effective ground-onerd, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be ents. Inspection date 3 chain saws (circular saws), guaback safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirem-Plane blade with protective hand guard, rolling plane equipped with spring tion;Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operasafety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. lever s, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, andle; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission partreliabion smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installat16 organization name project -bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5 8
本文档为【国家安全社区建设基本要求】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_348269
暂无简介~
格式:doc
大小:116KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-10-16
浏览量:21