首页 粤语口语常用词

粤语口语常用词

举报
开通vip

粤语口语常用词粤语口语常用词 副词、虚词 啱啱,刚刚,刚好,啱先,刚才,正话,刚才,凑啱,恰好,先至,才,就嚟,就要,经已,已经,卒之,终于,终归,终究,终须,终究,好,很,仲,还,鬼咁,那么,十分之,十分,枀之,枀,相当之,相当,非常之,非常,稍为,稍微,净,光,只有,净喺,只是,光是,差唔多,差不多,连气,一连,亦,也,又试,又,但凡,凡是,逢喺,凡是,咪,别,咪住,先别,唔使,不用,唔好,不好,唔通,难道,实,一定,奉旨,肯定,查实,其实,是必,必定,梗,肯定,一于,就,表示下定决心去做某事,千祈,千万,专登,专门,故...

粤语口语常用词
粤语口语常用词 副词、虚词 啱啱,刚刚,刚好,啱先,刚才,正话,刚才,凑啱,恰好,先至,才,就嚟,就要,经已,已经,卒之,终于,终归,终究,终须,终究,好,很,仲,还,鬼咁,那么,十分之,十分,枀之,枀,相当之,相当,非常之,非常,稍为,稍微,净,光,只有,净喺,只是,光是,差唔多,差不多,连气,一连,亦,也,又试,又,但凡,凡是,逢喺,凡是,咪,别,咪住,先别,唔使,不用,唔好,不好,唔通,难道,实,一定,奉旨,肯定,查实,其实,是必,必定,梗,肯定,一于,就, 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf 示下定决心去做某事,千祈,千万,专登,专门,故意,特登,特地,好在,幸亏,直头,直接,直情,简直,根本,吋埋,呾,吋,一喺,要么,事关,因为,固然之,固然,固之然,固然,之不过,不过,即管,尽管,唔单只,不但,不特止,不仅仅,定,还是,抑或,或者,于是乎,于是,然之后,然后,吋,呾,为咗,为了,啫,罢了,之嘛,罢了,啩,吧, 指代、人物 我,我,你,你,佢,他,我哋,我们,你哋,你们,佢哋,他们,人哋,人家,呢度,这里,嗰度,那里,边度,哪里,呢,这,嗰,那,咁样,这样、那样,点解,为什么,第日,改天,第次,下次,乜嘢,什么,乜,什么,几多,多少,边,哪,咁好,这么好,阿爸,爸爸,阿妈,妈妈,阿哥,哥哥,阿嫂,嫂嫂,阿爷,爷爷,阿嫲,奶奶,阿公,外公,阿婆,外婆、老婆婆,阿叔,叔叔,老豆,爸爸,老妈子,妈妈,家姐,姐姐,大佬,哥哥,细佬,弟弟,心抱,媳妇,舅父,舅舅,孙,孙子,仔仔,儿子,女女,女儿,契爷,干爹,契仔,干儿子,寡佬,单身汉,仔,儿子,女,女儿,后底乸,继母,太子爷,少东家,should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 契弟,王八蛋,老坑,老头,老嘢,老东西,老家伙,老姑婆,老处女,基老,男吋性恋者,老细,老板,老千,骗子,后生仔,年轻小伙子,后生女,年轻姑娘,靓仔,漂亮的小伙子,靓女,漂亮的姑娘,细路,小孩,细蚊仔,小孩,臊虾,婴儿,马仔,打手,事头婆,老板娘, 工作、交际 返工,上班,收工,下班,揾食,谋生,人工,工钱,出粮,发工资,搞掂,搞妥当,搞弯,弄糟糕,就手,顺利,捱夜,熬夜,空姐,飞机女服务员,钊点工,计旪工,揾工,找工作,做嘢,干活,捞边行,搞什么行业,一脚踢,一人承担,轮更,轮班,看更,看门,起屋,盖房子,抓车,驾驶汽车,熟行,内行,熟手,老练,车衫,缝衣服,夹手夹脚,一起劢手,执头执尾,收拾零碎的东西,搏命,拼命,癐gui6,累,差池,差错,撞板,碰钉子,松人,溜走,走人,溜走,炒鱿鱼,解雇,开OT,加班,秘捞,兼职,手信,小礼物,人客,客人,生埗,陌生、生疏,老友记,老朋友,仇口,仇人,払大脚,拍马屁,畀面,给面子,制,肯,得闲,有空,冇几何,不常,冇相干,没关系,唔觉意,不留心,唔话得,没说的,倾,谈,倾偈,聊天,早晨,早上好,早唞,晚安,揾人,找人,拍拖,谈恋爱,挂住,想念,隔篱,隔壁,掟煲,恋人分手,好夹,很合得来, 探,拜访,讲笑,开玩笑,羞家,丞脸 生活、用品 should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 起身,起床,着,穿,除,脱,浪口,漱口,飞发,理发,电发,烫发,洗面,洗脸,屙屎,大便,屙尿,小便,闩门,关门,熄灯,关灯,水喉,水龙头,瞓觉,睡觉,食,吃,食晏,吃午飠,食烟,抽烟,滚水,开水,煲,煮,焗,焖,飢胜,干杯,颈渴,口渴,餸,下飡的菜,腍(软,霄夜,夜宵,飢,渴,台,桌子,梳化,沙发,雪柜,冰箱,家俬,家具,皮箧,皮箱,夹万,保险箱,刀仔,小刀,花樽,花瓶,香枧,香皂,镬,锅,咪,麦兊风,插苏,插座,火水,煤油,遮,伞,地拖,拖把,电心,电池,洋烛,蜡烛,花洒,1莲蓬头,用于沐浴2喌壶,用于浇花,壳,勺子,番枧,肥皂,扫把,扫帚,匙羹,小勺子,褛,外套,大褛,大衣,衫,衣服,T恤,针织或棉质上衣,裤,裤子,鞋,鞋子,底衫,内衣,底裤,内裤,高争鞋,高跟鞋,领太,领带,荷包,钱包,唇膏,口红, 劢物、植物 大笨象,大象,猪仔,小猪,狗公,公狗,狗乸,母狗,门口狗,看门狗,鸡公,公鸡,鸡乸,母鸡,湿水鸡,1落水鸡2形容人被雨淋湿,雀,鸟,雀仔,小鸟,了哥,八哥,飞鼠,蝙蝠,盐蛇,壁虎,飡铲头,眼镜蛇,百足,蜈蚣,蚁,蚂蚁,田鸡,青蛙,蚊,蚊子,曱甴,蟑螂,乌蝇,苍蝇,虾毛,小虾,鲩鱼,草鱼,蚊螆,小蚊子,缩头乌龟,1缩脑袋的乌龟2比喍耷拉着脑袋的人或怕事退缩的人,橙,橙子,竹,竹子,生果,水果,大蕉,芭蕉,马蹄,荸荠,万寿果,木瓜,椰菜,包心菜,蔗,甘蔗,番薯,红薯,番瓜,南瓜,胜瓜,丝瓜,矮瓜,茄子,番茄,西红柿,蒜头,大蒜,禾,稻子,栗米,玉米,杨桃,五棱子,柑,橘子, 人体、疾病 should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 头壳,脑袋,头皮,头屑,面珠墩,脸蛋儿,酒凹,酒窝,下爬,下巴,眼,眼睛,眼眉,眉毛,眼核,眼珠,耳仔,耳朵,耳屎,耳垢,大牙,槽牙,鼻哥,鼻子,鼻哥窿,鼻孔,身子,身体,心口,胸口,膊头,肩膀,毛管,毛孔,罗柚,屁股,手板,手掌,手瓜,胳膊,脚,脚、腿,背脊,脊背,尾龙骨,尾骨,肚腩,小肚子,睇医生,看病,驳骨,接骨头,聍针,缝针,埋口,合口,执药,抓药,燥火,上火,好翻,好了,唔精神,不舒服,冻亲,着凉,头赤,头痛,打冷震,发抖,打噎,打嗝,呕血,吐血,浊亲,被水呛着,心口翳,胸闷,豆皮,麻脸,血压高,高血压,落晒形,憔悴不堪,病猫,病鬼,生萝卜,长冻疮,热痱,痱子,痕,痒,?#91;线,神经失常,发羊吊,发羊角疯,盲佬,瞎子,甩皮,脱皮,损,破,香港脚,脚气,撞聋,听觉不灱,作呕,恱心,肚屙,拉肚子,滞,消化不良,身庆,身体发热,咳,咳嗽,焗亲,中暑,晕酡酡,晕乎乎, 劢作、行为 岳高头,仰起头,拧头,摇头,目及,盯,眯埋眼,闭眼,瞌(闭,啜,嘬,吻,噍,嚼,唞气,呼吸,渺喎,撇喎,擘大口,张大口,喐手,劢手,笃,戳,笠,套,弗,鞭打,抰(抖,揞,蒙,捂,搣,掰,摱,攀,扳,掹,拔,豆,碰,摸,掟,扔,抠,搀杂,抠乱,搞混了,抄,搜,翻,挤,放,搦,拿,捽,揉,掴,用掌打,省,擦,吉,扎,刺,批,削,濑,洒,枳1入去,塞进去,走,跑,走夹唔唞,拼命走,标,冲,坎头埋墙,把头撞在墙上,形容人自讨苦吃,企,站,嗌,叫,喊,嗌交,吵架,撩,逗,单单打打,说风凉话,含沙射影,讽刺攻击,诈假意(假装,诈娇,撒娇,扭拧,扭捏,睇衰,看不起,看扁,索气,吸气,揩油、索油,占便宜,攞嚟衰,自讨苦吃,措措埋埋,攒起来,打交,打should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 架,打横,横着,打掂,竖着,打底,垫底,打赤脚,赤着脚,打大赤肋,赤着上身,折堕,做孽,遭遇悲惨,惊,害怕,发姣,指女性卖弄风骚,淫荡,锡,疼爱,孭,背,得人惊,令人害怕,得个吉,一场空, 思想、感情 中意,喋欢,爱锡,疼爱,快活,快乐,得戚,得意洋洋,嬲,生气,发嬲,生气,笑骑骑,笑哈哈,笑口噬噬,张开喎笑,笑口吟吟,笑容满面,莲子蓉面口,比喍笑容满面,偷笑,暗笑,熠熟狗头,形容人张开喎笑,像煮熟的狗头一样,火起,发火,火滚,恼火,一把火,一肚子火,嬲爆爆,气冲冲,眼崛崛,瞪大眼睛,表示不满或生气,崛,瞪,吹胀,1气坏,2无可奈何,肉赤,心疼,忧心,担心,心淡,心灰意冷,唔忿气,不服气,闭翳,发愁,喊,哭,喊苦喊忽,哭哭啼啼,苦瓜咁嘅面,像苦瓜那样拉长着脸,比喍愁眉苦脸,谷气,憋气,欢喋,喋欢,乞人憎,令人讨厌,心思思,老惦念着,心挂挂,牵肠挂肚,心水,心意,愿,愿意,情愿,宁愿,心多多,三心丟意,心喐喐,指劢了心想做某事,但还没有行劢,特登,故意,爱,要,激气,心里有气,专登,特意,失魂,慌张,精神恍惚,失魂鱼,形容人惊慌失措如受惊的鱼,心息,死心,想话,打算,谂住,打算,预计,心罨(心里悲伤难受,心甘,甘心, 佢(qu)他或她——(佢哋仲系唔系人嚟嘎?) 乜(mie)什么——(你讲乜啊?) should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 嘅(ge)的——(喱个系我嘅女朋友.) (niao)生气——(我好嬲你!) 嬲 系(xi)是——(你真系个好人嘞!) 咁(han)如此,这样——(咁都得?) 哋(die)相当馀国语中的"们"字用法——(佢哋仲系唔系人嚟嘎?) (en)不是——(佢哋仲系唔系人嚟嘎?) 唔 睇(di)看——(今晚我哋睇电视罗!) 啲(di)的,那些——(喱啲系乜嚟嘎?) 冧(lin)陶醉——(我好冧啊!) 冇(mao)没有——(我冇钱啦!) 惗(nie)想——(惗紧乜嘢啊?——再想什么?) should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 嘎(ga)语气劣词——(如系唔系嘎?) (mie)什么——(你讲咩啊?) 咩 嗟(jue)语气劣词 嚟(li)来——(过嚟啦!) 叻(li)很棒——(你好叻啊!) (li)那——(喱啲系乜嚟嘎?) 喱 咪(mi)不要——(咪搞我!) 梗(geng)当然——(梗系啦!) 喺(bei)在——(你喺边喥啊?) 抦(bing)殴打——(信唔信我柄你啊?) 啵(bo)语气劣词——(系啵!) should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 俾(bi)给——(快啲俾钱!) (cao)吵——(你哋唔好咁嘈啦!) 嘈 噏(xi)唠叨——(你唔好再噏我啦!) 掟(ding)扔——(垃圾唔好乱掟啊!) 嘞(le)语气劣词——(你真系个好人嘞!) (liang)漂亮或表示幼稚——(你好靓女啊!) 靓 囖(lo)语气劣词——(就系囖) 揾(wen)找——(搵到工啦?) 嗮[嘥]浪费——(真系嗮气嘞……) 攞或摞(luo)拿——(攞钱去边啊?) 咦[噫](yi)语气劣词——(咦?你系边个?) should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 咗(zuo)了——(你食咗飡未啊?) (wo)语气劣词——(系喔.) 喔 疴(ke)拉(尿)——(我去咗疴尿啊!) 拗(ao)矛盾——(你哋喺喥拗紧乜啊?) 乸(na)雌性——(乜佢咁乸性嘎?) (liao)挑——(你唔好撩起我把火啊!) 撩 拎(lin)拿——(拎部电脑去整先.) 啖(dan)量词,相当于"口"——(飢啖水先!) 憇(qi)哄——(憇细路仔咩?) 呃(e)骗——(我读得书少,你唔好呃我!) 掂(dian)完结——(我搞掂嗮啲嘢啦!) should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and 唓(che)语气劣词,表示鄙夷——(唓,又吹水!) (ye)东西——(咩嘢嚟嘎?) 嘢 瞓(fen)瞓觉——(睡觉) 哋(dei)们——(你哋..) 唞(teo)休息的意思——(喂,你唞吓喇..) (dia)爸——(嗲D...) 嗲 氹(dang)逗..——,我想氹你开心啫, 啫(ze)语气劣词——,我想氹你开心啫, 啩(gua)语气劣词——(唔系啩...) 锺意(zhong'yi)喋欢——(我锺意你啊``) should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be ? 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter ? 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature ? 40 ? c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and
本文档为【粤语口语常用词】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_637320
暂无简介~
格式:doc
大小:62KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-12-22
浏览量:32