首页 联想S510一体机拆机图解

联想S510一体机拆机图解

举报
开通vip

联想S510一体机拆机图解联想S510一体机拆机图解 联想S5100一体机拆机图解 该拆机图解是俺亲手一步一步边拆边照相写的,为的是使大家能够了解他的内部结构, 并指导大家对其进行维护、升级和维修。 一、整机全貌图 二、拆机开始 1、 先拆卸支架的后盖 拆开这个螺 丝 ? 2、 拆卸支架 拆开这个螺 丝 拆开这个螺 丝 3、 再拆卸后大盖的固定螺丝 that balances the sensitivity associated with the following factors: (1) the long ...

联想S510一体机拆机图解
联想S510一体机拆机图解 联想S5100一体机拆机图解 该拆机图解是俺亲手一步一步边拆边照相写的,为的是使大家能够了解他的内部结构, 并指导大家对其进行维护、升级和维修。 一、整机全貌图 二、拆机开始 1、 先拆卸支架的后盖 拆开这个螺 丝 ? 2、 拆卸支架 拆开这个螺 丝 拆开这个螺 丝 3、 再拆卸后大盖的固定螺丝 that balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and (2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the center of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, while carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (that is, agate and knife blades sharp and smooth). So, balance beam made of triangular-ovate, hollowed out in the Middle, triangular-the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direction, Fulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or titanium alloys light metal alloy. V-shaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light metal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itself d the length of the horizontal zero-point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust the size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensitivity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electro-optic balance of sense volume General adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, then, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, 拆开这个螺拆开这个螺 丝 丝 4、 用两个一字起,顺着后开边缘逐个慢慢撬开卡子,卡子很多一圈都是,大家要有耐心。 5、 打开后盖的全景图 6、 拆卸内存盖板,如果只是为了加内存,拆到这就可以加内存了,注意是笔记本的内存哦。 轻轻拨开两个铁 片,就可以打开 这个卡子了。 两个内存插槽 7、 拆卸托架的支撑盘 that balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and (2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the center of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, while carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (that is, agate and knife blades sharp and smooth). So, balance beam made of triangular-ovate, hollowed out in the Middle, triangular-the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direction, Fulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or titanium alloys light metal alloy. V-shaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light metal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itself d the length of the horizontal zero-point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust the size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensitivity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electro-optic balance of sense volume General adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, then, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, 8、 拆卸硬盘托架,拆下螺丝和数据线后按箭头方向稍稍抬起拉出。 数据线和电源线 9、 拆卸光驱,拆下螺丝,用一字起拨送数据线插头,然后按箭头方向稍稍用力拉出。 10、 拆卸扩展接口模块,拆除螺丝后,按箭头方向拉出。 that balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and (2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the center of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, while carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (that is, agate and knife blades sharp and smooth). So, balance beam made of triangular-ovate, hollowed out in the Middle, triangular-the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direction, Fulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or titanium alloys light metal alloy. V-shaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light metal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itself d the length of the horizontal zero-point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust the size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensitivity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electro-optic balance of sense volume General adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, then, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, 这是扩展模块的 插头,安装时确 认插好哦。 11、 拆卸主板保护罩,拆开一个螺丝后就可以按箭头方向拉出了。 12、 主板功能区解析 CPU散热模组 这下面就是传 说中的CPU 电源 电无线网卡 三、注意事项 源 这里面每步都几乎是螺丝和卡子的结合,安装时一定要注意将卡子都推到位,这个机器 做工很精细,如果发现螺丝孔对不上,那肯定就是你卡子没卡好。注意千万不要用蛮力。 否则后果自负。 that balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and (2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the center of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, while carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (that is, agate and knife blades sharp and smooth). So, balance beam made of triangular-ovate, hollowed out in the Middle, triangular-the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direction, Fulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or titanium alloys light metal alloy. V-shaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light metal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itself d the length of the horizontal zero-point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust the size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensitivity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electro-optic balance of sense volume General adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, then, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters,
本文档为【联想S510一体机拆机图解】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_591137
暂无简介~
格式:doc
大小:258KB
软件:Word
页数:16
分类:
上传时间:2017-09-18
浏览量:89