首页 日本留学热门专业之物流管理

日本留学热门专业之物流管理

举报
开通vip

日本留学热门专业之物流管理日本留学热门专业之物流管理 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move ...

日本留学热门专业之物流管理
日本留学热门专业之物流管理 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 日本留学热门专业之物流管理 与美国相比日本物流发展的历史虽然稍显短暂,但其却以很快的发展速度跻身于世界物流发达国家的前列。由于考虑到去美国要付出高昂的留学费用,一般工薪家庭是无能力担负,留学生们会从专业就业前景等综合方面考虑,都会选择去日本学此专业。因此,日本的物流管理专业也是近年来中国留学生所追捧的专业热门专业之一。 首先咱们了解一下物流相关概念与日本物流方面的 政策 公共政策概论形成性考核册答案公共政策概论形成性考核册答案2018本科2018公共政策概论形成性考核册答案公共政策概论作业1答案公共政策概论形成考核册答案 : 物流管理 物流管理(Logistics Management)是指在社会在生产过程中,根据物质资料实体流动的规律,应用管理的基本原理和科学方法,对物流活动进行计划、组织、指挥、协调、控制和监督,使各项物流活动实现最佳的协调与配合,以降低物流成本,提高物流效率和经济效益。现代物流管理是建立在系统论、信息论和控制论的基础上的。 主要学习科目 本专业学生主要学习经济、会计、贸易、管理、法律、信息资源管理、计算机[3]等方面的基本理论和专门知识,培养具有一定的物流 规划 污水管网监理规划下载职业规划大学生职业规划个人职业规划职业规划论文 与设计、物流管理、物流业运作等能力,能在经济管理部门,贸易公司,物流企业从事政策制定、物流业运作管理应用型、复合型、国际化的物流管理人才。 关于日本物流相关的政策:日本政府认为物流业对提高国家经济活力有着重要的战略意义,政府在1997年即出台了发展物流业的政策措施,基本目标是到2001年,在日本国内进一步完善物流基础设施建设,实现国际水平的物流运作。 在日本物流专业属于商科范畴类专业,有相关此专业并且排名较靠前的学校有: 国立 一桥大学 神户大学 东京大学 京都大学 大阪大学 名古屋大学 北海道大学等 私立 早稻田大学 庆应义塾大学 明智大学 同志社大学 上智大学 中央大学等 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 日本相关物流专业毕业后就职的日企去向主要有: 日本物流企业 日本最大的汽车公司 日本便利店巨头――7-11、国分物流战略、阳光书社物流中心、南王运送成功发展、世界最先进的物流据点――菱食、伊藤洋华堂的经营物流、大和运输的宅急便、朝日啤酒的物流效率、尼康:凭借物流领先世界、加藤的新物流系统、索尼的全球物流奥秘、中央物产的物流中心、菱三应用erp、卡斯美的 采购 采购部分工政府采购法87号令广东省政府采购政府采购法及采购员下一步工作计划 管理、富土通的货运策略、日本报刊的物流模式、 松下的配送中心、先锋电子的库存管理、夏普的需求链管理、小松全面改造信息系统、yamado提供准时服务、kao开发的物流系统、三菱库存的无纸化和无人化、花王川崎的高效率配送、佳能的定基程序、mmh的配送需求计划、佐川急便的运输体制、学研所的配送中心 报告 软件系统测试报告下载sgs报告如何下载关于路面塌陷情况报告535n,sgs报告怎么下载竣工报告下载 、千里丘物流中心的设计方案、资生堂关西物流中心、波拉西日本流通中心、和平岛的物流现代化、西友公司的drp中心、kasumi创造的世界物流神话、东京的大型物流基地、本田汽车的需求链改造等。 open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers
本文档为【日本留学热门专业之物流管理】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_003124
暂无简介~
格式:doc
大小:35KB
软件:Word
页数:0
分类:
上传时间:2018-09-19
浏览量:0