landmark培训内容-小林
第一天内容
合成记录
查找频率
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
提取子波:
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
井旁道子波
DATABASE FILTER时变子波
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
其中要井口子波归零
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
第二天内容
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
合成记录相关(距离越近表明相关越好)
红线为合成记录,绿线为地震
显示测井曲线
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
井壁垮塌严重,要曲线编辑
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
合成记录保存
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
子波贡献
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
地震解释
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
地震选线
选色
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
测线间距
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
断层解释
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
断层属性修改
断层命名
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
建立地层
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
地层追踪(截块对比)
层位改名
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
地层内插
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
地层圆滑
面积删除
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
自动追踪
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
断层断距
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
断层平面组合
构造图
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
图的修饰
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
范围删除
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
加注释
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
第三天培训内容
层拉平
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
时深转换
TDQ
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
速度体的输出
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
速度体的查看
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
DEPTH TEAM三维速度体(比TDQ可视,可用层来
约束,应用速度谱的资料)
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
加地层
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
井资料添加
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
测井曲线编辑
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
第四天内容
ZMAP-PLUS
建立文件夹
1.EXPORT TO Z-MAP PLUS
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
2.设置路径
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
建立ZDF数据
3.底图命名
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
底图属性
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
删除底图属性
4(等值线网格化
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
5.平滑
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
6.等值线
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
7.颜色修饰
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
删除文件语句
等值线的修定
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
小的等值线删除
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
等值线修改后重新网格
加断层的等值线
新建断层
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
断层内掏空(BLANK)
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
图片输出
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
图片存在DEMO目录下
第五天内容
POSTSTACK,叠后处理,属性提取
SHIFT+2键
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
自动增益(AUTOMATIC GAIN CONTROL道间自动
增益;TRACE EQUALIZATION道内自动增益;
ENVELOPE SCALING包层比例;CONSTANT
SCALAR常数比例;TIME不同时间段比例)
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
TIME-SCALE
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
FILETE(信燥比与分辨率)
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
PHASE ROTATION相位旋转
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
RESAMPLE重采样
AUTOCORRELATE自动相关
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
DECONVOLVE反折机,让轴更多
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
ENHANCE数据增强(TRACE MIX二维中可用)
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
DIP-SCAN倾角扫描叠加
PAL提取属性
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
ESP相关(这道和周围道的相似性)
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
时间切片
EDGE DETECTION 边界检测
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
波形分类(波形不同,代表沉积相不同)
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
如果不能选样点,就用标准
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
本文档为【landmark培训内容-小林】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。