首页 landmark培训内容-小林

landmark培训内容-小林

举报
开通vip

landmark培训内容-小林landmark培训内容-小林 第一天内容 合成记录 查找频率 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) N...

landmark培训内容-小林
landmark培训内容-小林 第一天内容 合成记录 查找频率 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 提取子波: beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 井旁道子波 DATABASE FILTER时变子波 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 其中要井口子波归零 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 第二天内容 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 合成记录相关(距离越近表明相关越好) 红线为合成记录,绿线为地震 显示测井曲线 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 井壁垮塌严重,要曲线编辑 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 合成记录保存 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 子波贡献 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 地震解释 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 地震选线 选色 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 测线间距 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 断层解释 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 断层属性修改 断层命名 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 建立地层 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 地层追踪(截块对比) 层位改名 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 地层内插 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 地层圆滑 面积删除 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 自动追踪 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 断层断距 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 断层平面组合 构造图 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 图的修饰 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 范围删除 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 加注释 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 第三天培训内容 层拉平 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 时深转换 TDQ beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 速度体的输出 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 速度体的查看 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall DEPTH TEAM三维速度体(比TDQ可视,可用层来 约束,应用速度谱的资料) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 加地层 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 井资料添加 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 测井曲线编辑 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 第四天内容 ZMAP-PLUS 建立文件夹 1.EXPORT TO Z-MAP PLUS beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 2.设置路径 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 建立ZDF数据 3.底图命名 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 底图属性 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 删除底图属性 4(等值线网格化 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 5.平滑 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 6.等值线 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 7.颜色修饰 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 删除文件语句 等值线的修定 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 小的等值线删除 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 等值线修改后重新网格 加断层的等值线 新建断层 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 断层内掏空(BLANK) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 图片输出 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 图片存在DEMO目录下 第五天内容 POSTSTACK,叠后处理,属性提取 SHIFT+2键 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 自动增益(AUTOMATIC GAIN CONTROL道间自动 增益;TRACE EQUALIZATION道内自动增益; ENVELOPE SCALING包层比例;CONSTANT SCALAR常数比例;TIME不同时间段比例) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall TIME-SCALE beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall FILETE(信燥比与分辨率) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall PHASE ROTATION相位旋转 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall RESAMPLE重采样 AUTOCORRELATE自动相关 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall DECONVOLVE反折机,让轴更多 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall ENHANCE数据增强(TRACE MIX二维中可用) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall DIP-SCAN倾角扫描叠加 PAL提取属性 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall ESP相关(这道和周围道的相似性) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 时间切片 EDGE DETECTION 边界检测 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 波形分类(波形不同,代表沉积相不同) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 如果不能选样点,就用标准 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall
本文档为【landmark培训内容-小林】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_624976
暂无简介~
格式:doc
大小:2MB
软件:Word
页数:118
分类:
上传时间:2018-09-26
浏览量:9