首页 美标欧标衣服尺码对照表

美标欧标衣服尺码对照表

举报
开通vip

美标欧标衣服尺码对照表美标欧标衣服尺码对照表 美标常规尺码表: 女装外套尺码表 美标号型 身高/腰围(厘米) 胸围(厘米) 腰围(厘米) 肩宽(厘米) 袖长(厘米) XS 150/76 89/96 71/79 38.5-41 57-58.5 S 155/80 93/100 75/83 39.5-41.5 58-59.5 M 160/84 97/104 79/87 40.5-42 59.5-61 L 165/88 101/108 83/91 41.5-42.5 60.5-62 女装衫类尺码表 美标号型 身高/腰围(厘米)...

美标欧标衣服尺码对照表
美标欧标衣服尺码对照表 美标常规尺码表: 女装外套尺码表 美标号型 身高/腰围(厘米) 胸围(厘米) 腰围(厘米) 肩宽(厘米) 袖长(厘米) XS 150/76 89/96 71/79 38.5-41 57-58.5 S 155/80 93/100 75/83 39.5-41.5 58-59.5 M 160/84 97/104 79/87 40.5-42 59.5-61 L 165/88 101/108 83/91 41.5-42.5 60.5-62 女装衫类尺码表 美标号型 身高/腰围(厘米) 胸围(厘米) 肩宽(厘米) 袖长(厘米) 领围(厘米) XS 150/76 89/90 38/39 57/58 35 S 155/80 93/94 39/40 58/59 36 M 160/84 97/98 40/41 59.5/60.5 37 L 165/88 101/102 41/42 60.5/61.5 38 女装裤类尺码表 美标号型 身高/腰围(厘米) 裤长(厘米) 腰围(厘米) 臀围(厘米) XS 150/76 101/103 62/64 88-90 S 155/80 103/105 66/68 92-94 M 160/84 105/107 70/72 96-98 L 165/88 105/107 74/76 100-102 男士西装、外套尺码表 美标号型 身高/腰围(厘米) 领围(厘米) 肩宽(厘米) 胸围(厘米) 袖长(厘米) S 160-165/80-84 37-39 45.2-47.6 102-110 57 M 165-170/84-88 40-41 48.8-50 114-118 59 L 170-175/88-102 41-42 50-51.2 118-122 60 XL 175-180/102-108 42-45 51.2-53.6 122-130 62 XXL 180-195/108-114 46-49 54.8-58.4 134-146 64 男士衬衣尺码表 美标号型 身高/腰围(厘米) 领围(厘米) 胸围(厘米) 袖长(厘米) 肩宽(厘米) S 160-165/80-84 36-37 104-106 56-57.5 43.6-44.8 M 165-170/84-88 38-39 106-110 57.5-59 44.8-46 L 170-175/88-102 40-42 110-122 59-61.5 46-49.6 XL 175-180/102-108 43-44 122-130 61.5 49.6-51 XXL 180-195/108-114 45-47 130-136 61.5-62.5 51-53 or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be 男士裤类尺码表 身高/腰围(厘美标号型 胸围(厘米) 裤长(厘米) 臀围(厘米) 米) 2尺1寸-2尺2S 160-165/70-74 107 99-101.5 寸 2尺2寸-2尺5M 165-170/74-82 107-110 101.5-108 寸 2尺3寸-2尺7L 170-175/76-86 110-114 103-113 寸 2尺6寸-2尺9XL 175-180/84-96 114-117 110.5-121 寸 2尺9寸-3尺2XXL 180-185/96-108 117-121 121-133 寸 欧标常规尺码表: 女装外套常规尺码表 女装衬衣常规尺码表 欧标号型 号型 欧标号型 号型 F F 34 145/72A 34 145/72A 36 150/76A 36 150/76A 38 155/80A 38 155/80A 40 160/84A 40 160/84A 42 165/88A 42 165/88A 44 170/92A 44 170/92A 女装裤常规尺码表 男装外套常规尺码表 欧标号型 号型 欧标号型 号型 F F 25 55/58 44 26 58.5-61.5 46 K 27 62-65 48 175/96B 28 65-68.5 50 175/100C 29 69-71.5 52 180/104C 30 72--75 54 185/108C 31 75.5-78.5 56 190/112C 32 79-81.5 男装衬衣常规尺码表 or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be 欧标号型 号型 F 37 38 165/84A 39 170/88A 40 175/92A 41 175/96A 42 180/100A 43 180/104A 44 185/108A 45 190/112A 46 165/92A 48 170/96A 50 175/100A 52 180/104A 54 185/108A 56 190/112A 男装正装裤常规尺码表 欧标号型 号型 F 80 175/80A 82 175/82A 84 175/84A 86 180/86A 88 180/88A 90 180/90A 92 185/92B 94 185/94B 欧标男装休闲裤常规尺码表 欧标号型 号型 F 29 165/74A 30 170/78A 31 170/80A 32 175/82A 33 175/84A 35 180/86A 36 180/88A 37 185/92B or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be 38 185/94B 39 185/96B 40 190/100B 42 190/106B 44 195/112B 46 195/116B 家居服、文胸类 规格(cm) 家居服文胸类 下胸围 上胸围 杯型 70A 70CM 80CM A 75A 75CM 85CM A 80A 80CM 90CM A 85A 85CM 95CM A 90A 90CM 100CM A 70B 70CM 82.5CM B 75B 75CM 87.5CM B 80B 80CM 92.5CM B 85B 85CM 97.5CM B 90B 90CM 102.5CM B 70C 70CM 85CM C 75C 75CM 90CM C 80C 80CM 95CM C 85C 85CM 100CM C 90C 90CM 105CM C 70D 70CM 87.5CM D 75D 75CM 92.5CM D 80D 80CM 97.5CM D 85D 85CM 102.5CM D 90D 90CM 107.5CM D 家居服女内裤/睡衣规格(cm) 类 F 均码 S 150-155/80-86 M 155-160/85-93 L 160-165/90-98 XL 165-170/95-103 规格(cm) 家居服束身内衣类 腰围 臀围 F 均码 or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be S 55-61CM 78-89CM M 61-67CM 83-89CM L 67-73CM 86-96CM XL 73-79CM 89-99CM XXL 78-86CM 91-103CM 3XL 86-94CM 94-106CM S 戒指尺码表 备注: 编码 戒指 直径(mm) 周长(mm) 您在订制戒指时,如果不清楚自己手寸的1 6 14 45 号码,可以用这个方法测量出来:先用丝2 7 14.5 46 线绕手指一圈,再把丝线剪下来拉直,用3 8 15.1 47.5 尺子量出丝线的长短,然后对照我们提供4 9 15.3 48 的手寸对照表。最好的方法是请专业的珠5 10 16.1 50.5 宝商使用专用的测量工具帮助解决。 6 11 16.6 52 提示: 1、应在黄昏或晚上量度您的手指,因为在7 12 16.9 53 那段时候手指尺码是最大的; 8 13 17 53.5 2、不要在双手感觉冰冷时进行量度; 9 14 17.7 55.5 3、如穿戴设计较阔的指环,戒围应比正常10 15 18 56.5 尺码大多一号; 11 16 18.2 57 4、本表数值系以国际为主,内围直径系以12 17 18.3 57.5 戒指内圈为准。 13 18 18.5 58 14 19 18.8 59 15 20 19.4 61 16 21 19.7 62 17 22 20.2 63.5 18 23 20.4 64 19 24 21 66 or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
本文档为【美标欧标衣服尺码对照表】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_751406
暂无简介~
格式:doc
大小:35KB
软件:Word
页数:10
分类:
上传时间:2017-09-28
浏览量:311