首页 夏日海滩发型20变 每到夏天就要去海边

夏日海滩发型20变 每到夏天就要去海边

举报
开通vip

夏日海滩发型20变 每到夏天就要去海边夏日海滩发型20变 每到夏天就要去海边 准备好去海边狂欢度假了吗,无论是泳池畔的派对还是沙滩上的烤肉大会,你的造型不应该只能是湿漉漉的发辫以及大脱妆,想当海滩上最耀眼的女孩,快来看看ELLE.com为你整理的二十个海滩发型灵感~ 准备好去海边狂欢度假了吗,无论是泳池畔的派对还是沙滩上的烤肉大会,你的造型不应该只能是湿漉漉的发辫以及大脱妆,想当海滩上最耀眼的女孩,快来看看ELLE.com为你整理的二十个海滩发型灵感~ 自然侧马尾 自然的侧马尾即使从水中起身也不至于太过凌乱。 Ellipticity of ...

夏日海滩发型20变 每到夏天就要去海边
夏日海滩发型20变 每到夏天就要去海边 准备好去海边狂欢度假了吗,无论是泳池畔的派对还是沙滩上的烤肉大会,你的造型不应该只能是湿漉漉的发辫以及大脱妆,想当海滩上最耀眼的女孩,快来看看ELLE.com为你整理的二十个海滩发型灵感~ 准备好去海边狂欢度假了吗,无论是泳池畔的派对还是沙滩上的烤肉大会,你的造型不应该只能是湿漉漉的发辫以及大脱妆,想当海滩上最耀眼的女孩,快来看看ELLE.com为你整理的二十个海滩发型灵感~ 自然侧马尾 自然的侧马尾即使从水中起身也不至于太过凌乱。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 华丽发饰 谁说在海滩发型只能用无趣的小发饰,像这样用华丽的大蝴蝶结固定住头发,不只实用也更 时髦。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 伪短发造型 如果前天忘了好好保养头发,让发质看起来没有精神的话,快把整头的头发挽起,伪短发造 型不只能隐藏住缺点也看起来更有青春活力。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 缤纷头巾 选用头巾为发型加分,它缤纷的色彩不只可让造型更美丽,或许也可以有防晒的功能。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 时髦头巾 挑选头巾的重点在于要和泳衣相互搭配,让造型更时髦、完整~ Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 柔顺直发 又长又柔顺的发型在夏日海滩边是无法实现的事吗,不不不,用一点免冲洗乳霜为日晒后的 秀发补湿和锁水,就能赶走毛躁,海滩上的柔顺直发也能轻松达成~ Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 热带花朵 和夏日海滩风情最搭配的就是热带花朵了~大胆戴上花朵的发饰,简单完成应景的潮流发型。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 浪漫发带 让简单的发髻也能有更多的风格可能,试试浪漫的蕾丝发带吧~ Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 优雅草帽 具备防晒效果,又能打造最时尚优雅造型的莫过于是一顶草帽了~ Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 派对小帽 除了花朵发饰以外,一顶充满戏剧效果的华丽小帽也是个不错的选择,也是具有强烈自我风 格的狂欢派对造型。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 甜美卷发 穿上复古风格剪裁的泳衣,那发型当然也要搭配一下。夹出前额的斜刘海,另外再用电棒卷 出微乱的自然卷发,席卷海滩的六零年代甜美风格就完成了~ Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 浓密卷马尾 拥有浓密卷发的妳,可以把头发绑成一束具份量的卷马尾,配上图腾印花泳装和民族风的配 件,狂野性感的造型在沙滩上一定能吸引众人的目光。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 多层次发辫 想要迷人的发辫造型,记得把握两大重点:把发辫固定在一侧,让造型简单清爽;另外绑出 重复、多层次的交缠发辫可以让你在一片相似的发型中更突出。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 光泽马尾 简单的低马尾,加上用一絽头发覆盖住发圈处,充满光泽的完美发质就是这个发型的主角。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 气质公主头 中长发绑出公主头,利用简单的翻转技巧可以让发型更有气质。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 低调光芒发箍 不想要太过高调,但又想让造型有些变化的话,闪耀着低调光芒的发箍是你的发型心机好伙 伴。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 经典高马尾 永远不会出错的经典马尾,绑在接近头顶的位置更能展现夏日的活力~ Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 俏丽包子头 在头顶绑出俏丽的包子头,不仅是最清爽又有朝气的发型。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 高雅发髻 像是芭蕾舞者般的高雅发髻,配上性感小洋装就是泳池畔最迷人的造型。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test 印花发带 利用独特的印花发带让脸侧的头发不凌乱,选择能够搭配比基尼的印花图案是不能够忽略的 小细节。 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test
本文档为【夏日海滩发型20变 每到夏天就要去海边】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_435706
暂无简介~
格式:doc
大小:529KB
软件:Word
页数:0
分类:
上传时间:2017-12-05
浏览量:7