首页 卡西欧计算机使用说明

卡西欧计算机使用说明

举报
开通vip

卡西欧计算机使用说明卡西欧计算机使用说明 键记号 fx-4500pa 型计算器上的键钮均可用来执行多种不同的计算功能。 以橙色表示的各功能? 将会在先按下shift键后产生。 以浅绿色表示的各功能? 将会在先按下2ndf键后产生。 以红色表示的各功能? 将会在先按下alpha键后产生。 以绿色表示的各功能? 将会在基数模式时产生。 以蓝色字表示的各功能? 将会在sd模式或lr模式时产生。 environment negative tube wiring should be used in low-voltage tr...

卡西欧计算机使用说明
卡西欧计算机使用 说明 关于失联党员情况说明岗位说明总经理岗位说明书会计岗位说明书行政主管岗位说明书 键记号 fx-4500pa 型计算器上的键钮均可用来执行多种不同的计算功能。 以橙色表示的各功能? 将会在先按下shift键后产生。 以浅绿色表示的各功能? 将会在先按下2ndf键后产生。 以红色表示的各功能? 将会在先按下alpha键后产生。 以绿色表示的各功能? 将会在基数模式时产生。 以蓝色字表示的各功能? 将会在sd模式或lr模式时产生。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 手控计算模式 计算模式 mode 0:comp模式 一般计算,包括函数计算。 mode 1:基数模式 2进制)8进制)10进制)16进制的转换)计算,以及逻辑运算。 mode 2:lr 模式 线性回归计算。(当本模式被设定后,符号“lr”将会在显示屏上显示出来。) mode 3:sd 模式 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 偏差值计算。(当本模式被设定后,符号“sd”将会在显示屏上显示出来。) *0~3模式是各自独立的模式,不能同时使用。 mode.:eng 模式 工学符号计算。(当本模式被设定后,符号“eng”将会在显示屏上显示出来。)。 * 当fx-4500pa型计算器的电源被切掉时,则最后所被使用的计算模式将会被保留在存储装置内。 角度测量模式 mode 4:deg 模式 指定“度”的测量。(当本模式被设定后,符号“ d”将会在显示屏上显示出来。) mode 5:rad 模式 指写“弧度”的测量。(当本模式被设定后,符号“ r”将会在显示屏上显示出来。) mode 6:gra 模式 指定“百分度”的测量。(当本模式被设定后,符号“g”将会在显示屏上显示出来。 * 除了基数模式之外,4~6模式可与手控计算联用。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 显示模式 mode 7:fix 模式 指定小数点位数。(当本模式被设定后,符号“fix”将会在显示屏上显示出来。) mode 8:sci 模式 指定有效数字的位数。(当本模式被设定后,符号“sci”将会在显示屏上显示出来。) mode 9:norm 模式 解除“fix”及“sci”模式的指定。 这个操作,也改变指数显示的范围。 * 除了基数模式之外,7~9模式可与手控计算联用。 当fx-4500pa型计算器的电源被切掉时,则最后所被使用的计算模式将会被保留在存储装置内。 程序计算模式 mode exp:wrt 模式 设定之后即可进行程序(文件)的输入或修改。(当本模式被设定后,符号“wrt”将出 现在显示屏上。)再按一次本键,即可解除wrt模式。 mode ans:defm 模式 按本键可以扩大存储区数。(当本模式被设定后,“defm”将会在显示屏上出现显示。) 在设定本模式之后,输入一个数值,再按w键即可指定存储区的数量。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 缩写参照表 双行显示屏 本机具有双行显示屏的特色。上行显示屏设有光点式矩阵显示屏,它具有输入缓冲器的特征,并可供显示12个字符。下行显示屏则可供显示10位数的尾数和2位数的指数。当方程式被输入时,会显示在上行显示屏中,然后按exe键执行计算后,其计算结果将会显示在下行显示屏中。此构造可使方程式和计算结果同时显示在显示屏上。 此外,当文件名称被显示出来时,文件名称会显示于上行显示屏,而文件号码则会显示于下行显示屏。当程序被显示出来时,程序数据会显示于上行显示屏,而程序行数则会显示于下行显示屏。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 显示符号 本显示屏将会标示fx-4500pa型计算器现在所进行的计算操作状态的指示符号。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 指数显示 在进行一般的计算时,本机可以显示至10位数字。但是,若计算的结果超出此范围时,计算结果将自动地 以指数形式显示出来。您可以自由选择两种不同的指数表示法: 当小数字数或有效数字位数没有设定时,可以按mode 9键来选设上述的模式。由于现在的状态没有被 显示出来,因此必须按下列步骤进行操作来确定两种显示中的其中一种: environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 本说明书的各实例中所示的是指数显示格式“a”的计算结果。 如何读取指数显示格式的计算结果。 特定显示功能 在分数)16进制及其它特定的计算时,计算结果将以下列的方式显示: 1、分数 2、16进制数字 3、60进制数字 自动关机功能 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 为了节省电池的电源,若在大约6分钟内不作任何操作时,本机件将会自动切断电源。按ac键,可重新接通电源。请注意,即使电源切断,存储内容也会被保存起来。 术语与功能 shift 转换键 按本键即可使用功能指令与在键板上的以橙色表示的符号功能。当显示屏上有“s”的标示出现时,即表示已按了shift键。若再按一次shift键时,则“s”的标示将会消失。而且机体也将回复至使用此状态之前的原有状态。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 2ndf 第2 转换键 按本键即可使用功能指令与键板上的以浅绿色表示的符号功能。当显示屏上有“f”的标示出现时,即 表示已按下了2ndf键。若再按一次2ndf键时,则“f”的标示将会消失,而且机体也将回复至使用此状态 之前的原有状态。 mode 模式键 按本键即可设定本机体的状态,或指定角度测量的单位。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 以上各功能均使用于标准偏差值及回归的计算。请参阅“标准偏差值计算”及“回归计算”等的详细 说明。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean * 在进行除法运算时,使用“ / ”(斜线)键。 在程序的计算时,将数据输入之后,或是在计算已得到结果后继续执行计算时,按本键,可得到计算 结果。 在按shift键之后按本键,即可进行百分比的计算。请注意,在基数模式时将无法进行百分比的计算。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean off 电源切断键 按本键可将机体的电源切断。所设定的模式和存储器内容即使在电源关闭时,亦可继续保存。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean filf文件键 按本键以调用所记录的文件。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 在基数模式时按本键,可在逻辑运算中执行“not”功能。 在基数模式时先按本键,再输入一个数值,可得到该数值的负数数值。该负数即为所输入数值的2的 补码。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 1、先按本键后再输入一个数值,以得到该数值的常用对数值。 2、先按shift键后再按本键时,则此后所输入的数值将成为10的指数数值。 3、按2ndf键后再按本键时,“fixm”将会被输入。 4、在基数模式,按本键以指定计算器为16进制的计算模式。 5、在基数模式,先按shift键后再按本键,则此后所输入的数值都被指定为16进制的数值。 1、先按本键后再输入一个数值,可得到该数值的自然对数值。 2、按shift键后再按本键时,则此后所输入的数值将成为“e”的指数数值。 3、按2ndf键后再按本键时,用于执行变量输入指令的“, ”符号会被输入。 4、在基数模式,按本键以指定计算器为2进制的计算模式。 5、在基数模式,先按shift键后再按本键,则此后所输入的数值都被指定为2进制的数值。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 1、先输入x值,再按本键,然后输入y值(任一数值)可求得x的y乘方。 2、要计算y数值的x次乘方根时,先按shift键后再按本键即可求出。 3、按2ndf键后再按本键时,用于执行变量输入指令的“,”符号会被输入。 4、在基数模式时,按本键可指定计算器为8进制的计算模式。 5、在基数模式时,先按shift键后再按本键,则此后所输入的数值都被指定为8进制的数值。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 1、按此键可以在统计方程式和其他方程序中输入逗号。 2、先按shift键再按此键,即可输入分号。 3、在lr模式,先按2ndf键再按此键,即可求得回归计算中y的估计值。 1、按此键以将显示屏上的数值输入存储器里。请注意当计算方程式显示出来时,先算出计算结果后才 能存入存储器里。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 2、先按shift键再按此键则可将显示屏上的数值从存储器里减去。 3、在lr模式和sd模式,按此键即可输入数据。 4、在lr模式和sd模式,先按shift键再按此键即可消除已输入在存储装置中的不正确数据。 计算的优先顺序 本机使用真代数逻辑来进行方程式各部分的计算,其计算顺序如下所示: * 当计算方程式使用括号时以括号内为第一优先。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 坐标变换 1、您的科学计算器可以让您执行直角坐标和极坐标之间的坐标变换。 2、计算结果存入变量存储区v和变量存储区w。变量存储区v的内容最初显示出来。要显示变量存储区w的内容时,请按rcl w键。 3、极坐标时,θ的计算值可在-80?[θ?180?的范围内求出。(计算范围与弧度和百分度的计算范围相同。) 4、以下的操作在基数模式时无效。若是计算器位于基数模式时,请在按下mode,再按o之后开始操作。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 分数 分数以下列顺序输入和显示:整数)分子)分母。 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 数值的小数位数指定,有效位数和指数的显示 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean
本文档为【卡西欧计算机使用说明】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_314871
暂无简介~
格式:doc
大小:773KB
软件:Word
页数:47
分类:生活休闲
上传时间:2017-09-01
浏览量:17