手卫生质量持续改进记录
表
关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf
2012 年手卫生质量持续改进记录表(第 1 季度)
科室:
改进项目:对手卫生的认识和对手卫生的依从性。
存在问题:
1、洗手时,不能正确使用非手触式开关
2、未能严格按照“六步洗手法”要求洗手
原因分析:
1、手卫生意识不强
计划
项目进度计划表范例计划下载计划下载计划下载课程教学计划下载
(P) 2、工作繁忙,未能养成良好的手卫生习惯
预期目标:
增强手卫生意识,提高手卫生依从性
1、对全科医务人员进行手卫生相关知识
培训
焊锡培训资料ppt免费下载焊接培训教程 ppt 下载特设培训下载班长管理培训下载培训时间表下载
2、在所有洗手水龙头处张贴彩色
标准
excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载
洗手流程图
3、定期或不定期督促检查洗手执行情况 实施
(D)
效果评估:
科室医务人员手卫生意识不断提高,手卫生依从性达到76.7% 检查
(C)
总结,下一步
工作计划
幼儿园家访工作计划关于小学学校工作计划班级工作计划中职财务部门工作计划下载关于学校后勤工作计划
:
手卫生依从性逐步提高,但仍存在意识不强等问题。今后要进一步增强科室
医务人员手卫生意识,手卫生依从性超过85% 处理
(A)
a variety of connectors, supporting or providing temporary support. Lateral template installation, install a waterproof top bracing, clean the wall of debris, then install the template in place on the inside, the template is in place to ensure the template bottom line with the elastic edge of the template, template template control lines when the lines are not visible (parallel with the template invocation line 20 cm) check the template in place. Accessories must be inserted firmly, u-shaped card on the same seam should not be clamped in the same direction. D. support: templates in place immediately after the installation template supporting structure, initially adjust the verticality of the template, and then follow the advance reserved hole insert the bolt in the template. Wall bolts should be straight, interspersed with cable tension bolts, hard top. Pillar and bracing support surface should be flat pad solid, to have enough pressure area. Support should focus on for the steel cord. 3, and beam, and roof construction (1) main process: play axis, and elevation control line ? beam, and Board template support erection ? Latrun line installation beam end of pipe ? installation Liang Dimo, and brush off touch agent ? lashing beam steel ? beam steel hidden qualified ? installation beam side die and reinforcement ? Latrun line installation steel beams ? placed wood Fang ? tile multilayer Board ? template gap processing ? uniform brushing release Agent ? template pre check (2) construction points: a,. stay wall body template demolition Hou,
2012 年手卫生质量持续改进记录表(第 2 季度) 科室:
改进项目:对手卫生的认识和对手卫生的依从性。
存在问题:
1、部分人员对手卫生知识的理解不够,对手卫生的重要性认识不足
2、洗手设施不全,对科室人员手卫生依从性造成了一定的影响
原因分析:
1、部分人员对手卫生的认识存在严重偏差 计划
(P) 2、手卫生设施不完善
3、监督力度不够,管理上重视不够
预期目标:
继续增强医务人员手卫生意识,手卫生依从性超过95%
1、 进一步加强科室医务人员手卫生知识培训
2、改进洗手设施,均为长柄龙头,每龙头备齐洗手液、擦手纸
3、建立科室医务人员手卫生监督机制
实施
(D)
效果评估:
手卫生意识明显提高,手卫生依从性大于87.5% 检查
(C)
总结,下一步工作计划:
科室医务人员手卫生依从性切实提高,但仍需进一步强化,确保手卫生合格
率达95%
处理
(A)
a variety of connectors, supporting or providing temporary support. Lateral template installation, install a waterproof top bracing, clean the wall of debris, then install the template in place on the inside, the template is in place to ensure the template bottom line with the elastic edge of the template, template template control lines when the lines are not visible (parallel with the template invocation line 20 cm) check the template in place. Accessories must be inserted firmly, u-shaped card on the same seam should not be clamped in the same direction. D. support: templates in place immediately after the installation template supporting structure, initially adjust the verticality of the template, and then follow the advance reserved hole insert the bolt in the template. Wall bolts should be straight, interspersed with cable tension bolts, hard top. Pillar and bracing support surface should be flat pad solid, to have enough pressure area. Support should focus on for the steel cord. 3, and beam, and roof construction (1) main process: play axis, and elevation control line ? beam, and Board template support erection ? Latrun line installation beam end of pipe ? installation Liang Dimo, and brush off touch agent ? lashing beam steel ? beam steel hidden qualified ? installation beam side die and reinforcement ? Latrun line installation steel beams ? placed wood Fang ? tile multilayer Board ? template gap processing ? uniform brushing release Agent ? template pre check (2) construction points: a,. stay wall body template demolition Hou,
2012 年手卫生质量持续改进记录表(第 3 季度) 科室:
改进项目:对手卫生的认识和对手卫生的依从性。
存在问题:
1、个别人员对手卫生重要性认识依然存在不足
2、手卫生督查不够到位
原因分析:
1、少数人员对手卫生的认识存在一定偏差 计划
(P) 2、监督力度仍需进一步加强
预期目标:
继续增强医务人员手卫生意识,手卫生依从性达到100%
1、 进一步强化科室医务人员手卫生意识
2、健全完善科室医务人员手卫生监督机制
实施
(D)
效果评估:
手卫生意识显著提高,手卫生依从性达到95% 检查
(C)
总结,下一步工作计划:
科室医务人员手卫生依从性进一步提高,但仍需进一步规范,确保手卫生合
格率达100%;手卫生培训规范化,作为每年新护士培训课程 处理
(A)
a variety of connectors, supporting or providing temporary support. Lateral template installation, install a waterproof top bracing, clean the wall of debris, then install the template in place on the inside, the template is in place to ensure the template bottom line with the elastic edge of the template, template template control lines when the lines are not visible (parallel with the template invocation line 20 cm) check the template in place. Accessories must be inserted firmly, u-shaped card on the same seam should not be clamped in the same direction. D. support: templates in place immediately after the installation template supporting structure, initially adjust the verticality of the template, and then follow the advance reserved hole insert the bolt in the template. Wall bolts should be straight, interspersed with cable tension bolts, hard top. Pillar and bracing support surface should be flat pad solid, to have enough pressure area. Support should focus on for the steel cord. 3, and beam, and roof construction (1) main process: play axis, and elevation control line ? beam, and Board template support erection ? Latrun line installation beam end of pipe ? installation Liang Dimo, and brush off touch agent ? lashing beam steel ? beam steel hidden qualified ? installation beam side die and reinforcement ? Latrun line installation steel beams ? placed wood Fang ? tile multilayer Board ? template gap processing ? uniform brushing release Agent ? template pre check (2) construction points: a,. stay wall body template demolition Hou,
手卫生考核合格率统计图
100.00%
90.00%
80.00%
70.00%
60.00%手卫生考评成绩
50.00%西部40.00%北部30.00%
20.00%
10.00%
0.00%第一季度第三季度
手卫生考核合格率曲线图 100.00%
90.00%
80.00%
70.00%
60.00%手卫生考评成绩
50.00%西部
北部40.00%
30.00%
20.00%
10.00%
0.00%
第一季度第二季度第三季度第四季度
a variety of connectors, supporting or providing temporary support. Lateral template installation, install a waterproof top bracing, clean the wall of debris, then install the template in place on the inside, the template is in place to ensure the template bottom line with the elastic edge of the template, template template control lines when the lines are not visible (parallel with the template invocation line 20 cm) check the template in place. Accessories must be inserted firmly, u-shaped card on the same seam should not be clamped in the same direction. D. support: templates in place immediately after the installation template supporting structure, initially adjust the verticality of the template, and then follow the advance reserved hole insert the bolt in the template. Wall bolts should be straight, interspersed with cable tension bolts, hard top. Pillar and bracing support surface should be flat pad solid, to have enough pressure area. Support should focus on for the steel cord. 3, and beam, and roof construction (1) main process: play axis, and elevation control line ? beam, and Board template support erection ? Latrun line installation beam end of pipe ? installation Liang Dimo, and brush off touch agent ? lashing beam steel ? beam steel hidden qualified ? installation beam side die and reinforcement ? Latrun line installation steel beams ? placed wood Fang ? tile multilayer Board ? template gap processing ? uniform brushing release Agent ? template pre check (2) construction points: a,. stay wall body template demolition Hou,
心血管科手卫生用品领用量统计表
70
60
50
40洗手液
快速手消30
三维柱形图 320
10
0第一季度第三季度
心血管科手卫生用品领用量曲线图 70
60
50
洗手液40
快速手消
30
20
10
0
第一季度第三季度
a variety of connectors, supporting or providing temporary support. Lateral template installation, install a waterproof top bracing, clean the wall of debris, then install the template in place on the inside, the template is in place to ensure the template bottom line with the elastic edge of the template, template template control lines when the lines are not visible (parallel with the template invocation line 20 cm) check the template in place. Accessories must be inserted firmly, u-shaped card on the same seam should not be clamped in the same direction. D. support: templates in place immediately after the installation template supporting structure, initially adjust the verticality of the template, and then follow the advance reserved hole insert the bolt in the template. Wall bolts should be straight, interspersed with cable tension bolts, hard top. Pillar and bracing support surface should be flat pad solid, to have enough pressure area. Support should focus on for the steel cord. 3, and beam, and roof construction (1) main process: play axis, and elevation control line ? beam, and Board template support erection ? Latrun line installation beam end of pipe ? installation Liang Dimo, and brush off touch agent ? lashing beam steel ? beam steel hidden qualified ? installation beam side die and reinforcement ? Latrun line installation steel beams ? placed wood Fang ? tile multilayer Board ? template gap processing ? uniform brushing release Agent ? template pre check (2) construction points: a,. stay wall body template demolition Hou,