首页 公路工程竣工验收鉴定书、交工证书

公路工程竣工验收鉴定书、交工证书

举报
开通vip

公路工程竣工验收鉴定书、交工证书公路工程竣工验收鉴定书、交工证书 公路工程(合同段)交工验收证书 交工验收时间: 合同段交工验收证书第 号 工程名称: 合同段名称及编号: 项目法人: 设计单位: 施工单位: 监理单位: 本合同段主要工程量: 本合同段价款 原合同 实际 本合同段工期 原合同 实际 对工程质量、合同执行情况的评价、遗留问题、缺陷的处理意见及有关决定(内容较多时,可用附件) beam and reinforced concrete floor. , Hanger location should be correct, ...

公路工程竣工验收鉴定书、交工证书
公路工程 竣工验收 工程竣工验收人防工程竣工验收要求住宅小区规划竣工验收工程竣工验收会议议程工程竣工验收及移交 鉴定书、交工证书 公路工程( 合同 劳动合同范本免费下载装修合同范本免费下载租赁合同免费下载房屋买卖合同下载劳务合同范本下载 段)交工验收证书 交工验收时间: 合同段交工验收证书第 号 工程名称: 合同段名称及编号: 项目法人: 设计单位: 施工单位: 监理单位: 本合同段主要工程量: 本合同段价款 原合同 实际 本合同段工期 原合同 实际 对工程质量、合同执行情况的评价、遗留问题、缺陷的处理意见及有关决定(内容较多时,可用附件) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall (施工单位的意见) 施工单位法人代表或授权人(签字) 单位盖章 年 月 日 (合同段监理单位对有关问题的意见) 合同段监理单位法人代表或授权人(签字) 单位盖章 年 月 日 (设计单位的意见) 设计单位法人代表或授权人(签字) 单位盖章 年 月 日 (项目法人的意见) 项目法人代表或授权人(签字) 单位盖章 年 月 日 (注:表中内容较多时,可用附件。) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 公路工程竣工验收鉴定书 一 工程名称 工程地点及 二 主要控制点 三 建设依据 技术 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 与 四 主要指标 建设规模 五 及性质 开工日期 年 月 日 六 竣工日期 年 月 日 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 批准概算 七 竣工决算 工程建设 八 主要内容 主要材料 九 实际消耗 实际征用土 十 地数(亩) beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 建设项目工程 十一 质量鉴定结论 对建设、设计、施工、 十二 建设单位的综合评价 建设项目管理 十三 综合评价及等级 有关问题的 十四 决定和建议 附表:1、竣工验收委员会名单 2、工程交接单位代表签名表 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 竣工验收委员会名单 职务或职 姓 名 所 在 单 位 签 名 称 主任 委员 副主任 委员 委 员 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 竣工验收代表名单 序号 姓 名 所 在 单 位 职务或职称 签 名 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 工程交接单位代表签名表 姓 名 所 在 单 位 职务或职称 签 名 主管部门 监督单位 项目法人 设计单位 监理单位 施工单位 接养单位 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 竣工验收工程质量评分表 项目名称: 名称 实得分数 权值 加权得分 备注 交工验收工程质量 0.2 质量监督机构 0.6 工程质量鉴定 竣工验收委员会 0.2 工程质量 合 计 1.0 加权平均分 质量等级 计算: 复核: 年 月 日 竣工验收委员会工程质量评分表 项目名称: 序号 项目 评定内容 分值 实得分 路基边线直顺度、路基沉陷、亏 坡、松石、涵洞及排水系统完善状况, 支档工程外观和稳定情况。 路面平整度、裂缝、脱皮、石子 外露、沉陷、车辙、桥头(台背)跳 车现象,泛油、碾压痕迹等。 一 主体工程质量 70 桥面平整度、栏杆扶手、灯柱、 伸缩缝、混凝土外观状况。 隧道渗漏、松石、排水、通风、 照明以及衬砌外观状况。 交通安全设施及交叉工程的外 观及使用效果等。 房屋及机电系统等功能和外观; 二 沿线服务设施 其他设施,如加油站、食宿服务等设10 施的使用效果及外观。 绿化工程、隔音消声屏等是否符 三 环境保护工程 合设计要求。施工现场清理及还耕情10 况。与自然环境、景观的协调情况。 内容齐全,书写打印清晰、装订四 竣工图表 10 整齐,符合相关要求。 合计 100 注:1、缺二、三项时,应得分仍按100分计。例如:缺项目二时,实得分应除以0.9;项 目二、三均缺时,实得分应除以0.8,依次类推。 2、主体工程评定内容缺项时,其应得分仍按70分计。 beam and reinforced concrete floor. , Hanger location should be correct, install neat and firm, tubes and scaffolds should be in very close touch. Pipe and bracket weld shall not eat, burn-through and other phenomena. (2) No heat displacement of the pipe, the suspenders should be installed vertically, boom length can be adjusted; thermal displacement pipe, hangers should be ? of thermal displacement offset value in the opposite direction tilt installation. Two hot pipe of varying displacement or displacement in the opposite direction, unless specified design shall use the same hanger. (3), davit specifications should comply with the design requirements. (4) large diameter pipe valve, there should be support shall not be piping weight. (5) fixed to the structure of pipe support, crane and carrier shall not affect safety. (6) steel pipe support spacing for horizontal installation according to the design requirements and the national construction code. (7) the riser pipe, when the height is less than or equal to 5M, installed on each floor, 1 for height is greater than 5M, each floor shall be not less than 2, it tube cards apart from the ground level to more than 1.5~1.8M,2 pipe clamp can be installed symmetry. 7. installation of indoor drainage pipe (1) pipe and pipe fittings should comply with the design requirements and the provisions of the code. (2) pipe through the basement wall 竣工验收建设项目综合评定表 项目名称: 名称 实得分数 权值 加权得分 备注 竣工验收工程质量 0.7 项目建设管理 0.15 综合评价 项目设计工作 0.05 综合评价 项目监理工作 0.05 综合评价 项目施工管理 0.05 综合评价 合 计 1.0 建设项目加权平均分 综合评价 等级 计算: 复核: 年 月 日
本文档为【公路工程竣工验收鉴定书、交工证书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_833902
暂无简介~
格式:doc
大小:41KB
软件:Word
页数:14
分类:生活休闲
上传时间:2017-09-18
浏览量:788