首页 家适合做的四十道家常菜

家适合做的四十道家常菜

举报
开通vip

家适合做的四十道家常菜家适合做的四十道家常菜 (点击每个菜的菜名,可以查看具体过程) 可乐鸡翅 脆皮豆腐 蒜蓉娃娃菜 鲫鱼豆腐汤 梅干菜烧肉 四季豆炒肉丝 茭白肉丝 豆豉鸡翅 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded...

家适合做的四十道家常菜
家适合做的四十道家常菜 (点击每个菜的菜名,可以查看具体过程) 可乐鸡翅 脆皮豆腐 蒜蓉娃娃菜 鲫鱼豆腐汤 梅干菜烧肉 四季豆炒肉丝 茭白肉丝 豆豉鸡翅 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 红烧青鱼段 鸭肫炒青椒 牛肚炒大蒜 香菇排骨 盐水对虾 莴笋烧肉 蚝油牛肉 洋葱炒鸡蛋 青椒肉丝 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 百合鱼片 排骨萝卜汤 蚝油生菜 酸辣土豆丝 茄子西红柿 鱿鱼炒洋葱 大白菜烧藕丸子 木耳鱼丸 黄花菜炒鸡蛋 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 糖醋炸香骨 咖喱土豆牛肉 面筋青椒 毛豆鸡丁 红烧鲳扁鱼 干煸四季豆 毛豆烧鸡块 爆炒腰花 爆炒圆白菜 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 黄豆猪蹄 鱼香肉丝 西红柿炒鸡蛋 面筋包塞肉 皮蛋黄瓜汤 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
本文档为【家适合做的四十道家常菜】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_654168
暂无简介~
格式:doc
大小:88KB
软件:Word
页数:0
分类:生活休闲
上传时间:2018-08-10
浏览量:6