Bates_House纸模
Fold Guide
Optional - Cut out windows (leaving the center rails). Build the window inserts and glue in place behind
each window and door opening. Note - “Mother” is in the front, top, left window.
5B 5B
8A
Insert tabs through slots
and glue down tabs
...
Fold Guide
Optional - Cut out windows (leaving the center rails). Build the window inserts and glue in place behind
each window and door opening. Note - “Mother” is in the front, top, left window.
5B 5B
8A
Insert tabs through slots
and glue down tabs
Apply a small amount of glue to top corners and
top edges. Insert tabs through slots of 5A, 2B and 2C.
DO NOT GLUE DOWN TABS YET!
Score and fold the edges of
5A, 2B and 2C as shown.
Apply a small amount of glue to bottom corners and
top edges of roof parts 6A and 6B.
Position roof parts so TABS ARE OUTSIDE (see inset)!
When roof is in position, glue down tabs.
2B 2C
5A
6B
6B
6A
6A
Apply a small amount of glue
to top corners and edges.
Apply a small amount
of glue to bottom
corners and edges.
Assemble roof parts 6A and 6B.
TABS ARE OUTSIDE!
4A
1A
3A
2A 2A
3A
7A
7B
A
Please note that this project is not recommended for children. It requires a moderate degree of skill, and the use of a cutting blade, which is extremely dangerous.
When using cutting blades always use protective eyewear. This model was designed to be printed on Matte Paper Heavyweight, and the use of white glue is recommended.
Black dashed lines represent a mountain fold (a fold which point upward), and orange dashed lines represent a valley fold (the fold points downward). The orange dashed lines are
accompanied by a red “+” at each end. These are to be used as pin guides. Poke small holes at the “+”, flip the sheet over, and score between the holes for a clean valley fold.
Read the instructions and study the illustrations carefully before beginning.
A free project from http://www.haunteddimensions.raykeim.com
B
Apply a small amount of glue to bottom
corners and top edges of tower roof 5C.
Position roof parts so
TABS ARE OUTSIDE (see inset)!
When roof is in position,
glue down tabs.
5C
5C
8E
8D
8C
4H
4C
8B 4J
4J
4B
6C
Completed Model
6C
4B
4B x 2
6C x 2
4F & 4G
4F & 4G
4D4D 4iAssemble tower roof parts 5C and dormer 4D.
Insert tabs in slot
then glue down tabs.
Attach beneath side door.
Attach to side of porch.
Apply glue to
tabs then insert.
TABS ARE OUTSIDE!
1 of 9
slots
"Mother" window
Porch
7B here
1A
3A4A
2 of 9
slots
slots
slots
2A
2C
2B
A free project from http://www.haunteddimensions.raykeim.com
3 of 9
3A
Attach piece
2A here
A free project from http://www.haunteddimensions.raykeim.com
4 of 9
to 3A
4A
4B 4B
4C
4D
4i
4H
4J
4F 4G
slots
A free project from http://www.haunteddimensions.raykeim.com
5 of 9
slots
slots
slots slots
slots5C
5A
5B
A free project from http://www.haunteddimensions.raykeim.com
6 of 9
slots
slotsslots
slotsslots
slots
6A
Front
Back
6B
6C 6C
A free project from http://www.haunteddimensions.raykeim.com
7 of 9
7A
7B
A free project from http://www.haunteddimensions.raykeim.com
slots
slots
8 of 9
8A
8B*
8B
8D*
8C*
8C
8E 8E*
8D
8A*
* for optional transparency printing
A free project from http://www.haunteddimensions.raykeim.com
9 of 9
Mother
Side Door
Front Door
Tower front
Towerside
Optional window inserts
A free project from http://www.haunteddimensions.raykeim.com
本文档为【Bates_House纸模】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。