轴流风机特点 。参数
一(HTF(GYF)系列消防高温排烟轴流通风机概述、特点
(1)HTF(GYF)系列消防高温排烟轴流通风机,由上海交通大学和上虞市亿通风机有限公司联合研制共同开发,具有性能优良,耐高温性能良好,效率高,占地比离心风机少,安装方便等特点。
(2)HTF(GYF)系列消防高温排烟轴流通风机经“国家消防装备质量监督检验中心“检测合格,其性能达到国内领先水平,经全国三十多个省市的消防部门认可。
(3)耐高温性能优良:风机测试符合GBJ45,82消防
规范
编程规范下载gsp规范下载钢格栅规范下载警徽规范下载建设厅规范下载
标准
要求
对教师党员的评价套管和固井爆破片与爆破装置仓库管理基本要求三甲医院都需要复审吗
,风机采用独特
设计
领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计
,耐高温电机内置,配置电机冷却系统,能在300氏摄度高温条件下连续运行100分钟以上,100氏摄度温度条件下连续20小时/次不损坏,广泛应用于高级民用建筑,烘箱,地下车库,隧道等场合; (4)适用范围广:可以根据高级民用建筑的不同要求,采用变速或多速驱动形式,心达到一机两用(即常用通排风和消防时高温排烟)的目的;叶型分为轴流式(HTF(GYF)-I,II)和混流式HTF(GYF),IG,亦可制作屋顶式,消音式。
(5)效率高:本系列风机采用先进的CAD软件经多目标优化设计研制开发的新产品,以实测表明风机效率大于80%,部分大机号大于85%,并具有效率曲线平坦的特点,有利于节能;
(6)安装方便,占地较离心风机少:该风机基本形式为轴流式风机或混流式风机,可直接与风管连接或墙壁安装,安装形式可采用垂直或水平式。很大程度上节省了占地面积。
Otherwise the pump should be checked again to install. 4.2.5.1 structure embedded phase 1, toilet drain structure places a waterproof steel bushings, measure width of the beam, use galvanized steel pipe welding and sealing rings, measure elevation on positions in the structure main bars of beams, welded prison using sawdust block. Hole thin iron sleeve construction, length about 200 mm, easy installation and handle construction, casing used touch Remover (available used oil paint), Eachd8, transfer and underground drainage pipe installation mounting, hang-dry pipe must first make an outline, the carrier according to the design of slope planted well hung code, pipe hangers, prefabricated piping Bay and state provision and other sanitary and drainage provision for finding sizes, clamp the connection interface. The connection between the pipe and the main pipe to ensure smooth, sloping according to design requirements, no camber behavior occurs. Buried trunk pipe supporting frame, before you install DUN, planted well pipe sizes, will be reserved for finding and fixed the pipe size, and then sealing with cement mortar. 9, after the construction of water testing, water testing and well outside through-ball after completion of construction. 10, construction notes: when using metal pipe clamps,
二(HTF(GYF)系列消防高温排烟轴流通风机性能的选择和型号说明
三(HTF(GYF),I型消防高温排烟轴流风机参数表
Otherwise the pump should be checked again to install. 4.2.5.1 structure embedded phase 1, toilet drain structure places a waterproof steel bushings, measure width of the beam, use galvanized steel pipe welding and sealing rings, measure elevation on positions in the structure main bars of beams, welded prison using sawdust block. Hole thin iron sleeve construction, length about 200 mm, easy installation and handle construction, casing used touch Remover (available used oil paint), Eachd8, transfer and underground drainage pipe installation mounting, hang-dry pipe must first make an outline, the carrier according to the design of slope planted well hung code, pipe hangers, prefabricated piping Bay and state provision and other sanitary and drainage provision for finding sizes, clamp the connection interface. The connection between the pipe and the main pipe to ensure smooth, sloping according to design requirements, no camber behavior occurs. Buried trunk pipe supporting frame, before you install DUN, planted well pipe sizes, will be reserved for finding and fixed the pipe size, and then sealing with cement mortar. 9, after the construction of water testing, water testing and well outside through-ball after completion of construction. 10, construction notes: when using metal pipe clamps,
四(HTF(GYF),II型双速消防高温排烟轴流通风机性能参数表(1)
四(HTF(GYF),II型双速消防高温排烟轴流通风机性能参数表(2)
Otherwise the pump should be checked again to install. 4.2.5.1 structure embedded phase 1, toilet drain structure places a waterproof steel bushings, measure width of the beam, use galvanized steel pipe welding and sealing rings, measure elevation on positions in the structure main bars of beams, welded prison using sawdust block. Hole thin iron sleeve construction, length about 200 mm, easy installation and handle construction, casing used touch Remover (available used oil paint), Eachd8, transfer and underground drainage pipe installation mounting, hang-dry pipe must first make an outline, the carrier according to the design of slope planted well hung code, pipe hangers, prefabricated piping Bay and state provision and other sanitary and drainage provision for finding sizes, clamp the connection interface. The connection between the pipe and the main pipe to ensure smooth, sloping according to design requirements, no camber behavior occurs. Buried trunk pipe supporting frame, before you install DUN, planted well pipe sizes, will be reserved for finding and fixed the pipe size, and then sealing with cement mortar. 9, after the construction of water testing, water testing and well outside through-ball after completion of construction. 10, construction notes: when using metal pipe clamps,
五(HTF(GYF),I,II系列消防高温排烟通风机外形及安装尺寸表
Otherwise the pump should be checked again to install. 4.2.5.1 structure embedded phase 1, toilet drain structure places a waterproof steel bushings, measure width of the beam, use galvanized steel pipe welding and sealing rings, measure elevation on positions in the structure main bars of beams, welded prison using sawdust block. Hole thin iron sleeve construction, length about 200 mm, easy installation and handle construction, casing used touch Remover (available used oil paint), Eachd8, transfer and underground drainage pipe installation mounting, hang-dry pipe must first make an outline, the carrier according to the design of slope planted well hung code, pipe hangers, prefabricated piping Bay and state provision and other sanitary and drainage provision for finding sizes, clamp the connection interface. The connection between the pipe and the main pipe to ensure smooth, sloping according to design requirements, no camber behavior occurs. Buried trunk pipe supporting frame, before you install DUN, planted well pipe sizes, will be reserved for finding and fixed the pipe size, and then sealing with cement mortar. 9, after the construction of water testing, water testing and well outside through-ball after completion of construction. 10, construction notes: when using metal pipe clamps,
Otherwise the pump should be checked again to install. 4.2.5.1 structure embedded phase 1, toilet drain structure places a waterproof steel bushings, measure width of the beam, use galvanized steel pipe welding and sealing rings, measure elevation on positions in the structure main bars of beams, welded prison using sawdust block. Hole thin iron sleeve construction, length about 200 mm, easy installation and handle construction, casing used touch Remover (available used oil paint), Eachd8, transfer and underground drainage pipe installation mounting, hang-dry pipe must first make an outline, the carrier according to the design of slope planted well hung code, pipe hangers, prefabricated piping Bay and state provision and other sanitary and drainage provision for finding sizes, clamp the connection interface. The connection between the pipe and the main pipe to ensure smooth, sloping according to design requirements, no camber behavior occurs. Buried trunk pipe supporting frame, before you install DUN, planted well pipe sizes, will be reserved for finding and fixed the pipe size, and then sealing with cement mortar. 9, after the construction of water testing, water testing and well outside through-ball after completion of construction. 10, construction notes: when using metal pipe clamps,