首页 DUO陈奕迅2011温州演唱会

DUO陈奕迅2011温州演唱会

举报
开通vip

DUO陈奕迅2011温州演唱会DUO陈奕迅2011温州演唱会 (180、280、380已售光… 唉~节哀~) 门票票样: from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust...

DUO陈奕迅2011温州演唱会
DUO陈奕迅2011温州演唱会 (180、280、380已售光… 唉~节哀~) 门票票样: from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 活动海报 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 演唱会时间:2011年6月18日晚20点 演唱会场馆:温州市体育馆 演唱会票价(元): 看台280元 380元 480元 580元 内场880元1280元1680元2000元 座位分布图: from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order “DUO陈奕迅2011温州演唱会”将于6月18日20时在温州体育馆实力唱响。这是陈奕迅在温 州的首次个唱,这次温州演唱会让大家看到的将是原汁原味的“DUO演唱会”~据主办方透露, 整个DUO演唱会制作成本过千万~ 演唱会的主题是“DUO”,即双面之意,“我有时真的可以很顽皮,也可以很正经”,陈奕迅这样解 释道,要带给观众新鲜感:“同一个人但不同的感觉”。相信“双面”款Eason魅力十足,定能给大 家带来意想不到的惊喜视听盛宴,为2011年的温州演出市场打了一剂强心针。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 1、注意留意演唱会当天的天气情况,酌情准备适宜的衣物打扮。 2、如果是要外地的歌迷,请提前预定住宿的酒店旅馆,准备好必须的换洗衣物和洗漱用品。 3、加油呐喊的工具要带好,还有自制的灯排等,这样才能增加气势。 4、望远镜要带好,特别是内场和看台的歌迷这是必备的,呵呵。 5、相机、DV可以带,不过请注意保管好。 6、注意钱包财务安全,不能光顾HIGH了,小心扒手。 7、注意人身安全,不要随意在场内走动,不能太兴奋做出过激行为。 8、带好必备照相机、DV机、望远镜、手机等并妥善保管,如现场不准拍摄照相,要遵守现场秩序。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 中文名:陈奕迅 外文名:Eason Chan 出生日期:1974年7月27日 民族:汉族 出生地:香港 体重:160 磅 毕业院校:英国金斯顿大学 经纪公司:环球新艺宝唱片 经纪人:陈家瑛 所获成就:香港地区的“叱咤乐坛男歌手金奖 叱咤乐坛我最喜爱的男歌手奖 十大劲歌金曲最受欢迎男歌星奖 十大劲歌金曲亚太区最受欢迎香港男歌星奖 2009新城国语力至尊歌手大奖 台湾金曲奖最佳国语男演唱人奖 日本地区2008年MTV日本音乐录像带大奖台湾地区最佳BuzzAsia奖 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order Eason的DUO广州演唱会效果一级棒,没有拖沓,全程唱到尾。有粤语歌,国语歌曲也不少, 很享受~现场的感觉果然很不同啊~我爱eason~ 最爱EASON 喜欢他的声音,喜欢他的老歌,喜欢他的演唱方式,喜欢他给我们歌迷的惊喜。舞台华丽漂亮, 演出很完美,谢谢,eason~ 华尔兹的舞步 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
本文档为【DUO陈奕迅2011温州演唱会】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_648706
暂无简介~
格式:doc
大小:387KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-09-27
浏览量:30