Section 32 32 23
KEYSTONE CONCRETE RETAINING WALL
PART 1: GENERAL
1.01 Description
A. Work shall consist of designing, furnishing and construction of a KEYSTONE Country
Manor Retaining Wall System in accordance with these specifications and in reasonably
close conformity with the lines, grades, design, and dimensions shown on the plans. No
alternate wall systems will be considered.
B. Work includes preparing foundation soil, furnishing and installing leveling pad, unit drainage
fill and backfill to the lines and grades shown on the construction drawings.
C. Work includes furnishing and installing geogrid soil reinforcement of the type, size, location,
and lengths designated on the construction drawings.
1.02 Related Sections
A. Section 31 00 00 - Earthwork
1.03 Reference Documents
A. American Society for Testing and Materials (ASTM)
1. ASTM C140 Sampling and Testing Concrete Masonry Units
2. ASTM C1372 Specification for Dry-Cast Segmental Retaining Wall Units
3. ASTM D422 Particle-Size Analysis of Soils
4. ASTM D698 Laboratory Compaction Characteristics of Soil -Standard Effort
5. ASTM D1557 Laboratory Compaction Characteristics of Soil -Modified Effort
6. ASTM D3034 Polyvinyl Chloride Pipe (PVC)
7. ASTM D4318 Liquid Limit, Plastic Limit and Plasticity Index of Soils
8. ASTM D4475 Horizontal Shear Strength of Pultruded Reinforced Plastic Rods
9. ASTM D4476 Flexural Properties of Fiber Reinforced Pultruded Plastic Rods
10. ASTM D4595 Tensile Properties of Geotextiles - Wide Width Strip
11. ASTM D5262 Unconfined Tension Creep Behavior of Geosynthetics
12. ASTM D5818 Evaluate Installation Damage of Geosynthetics
13. ASTM D6637 Tensile Properties of Geogrids – Single or Multi-Rib
14. ASTM D6638 Connection Strength - Reinforcement/Segmental Units
15. ASTM D6706 Geosynthetic Pullout Resistance in Soil
16. ASTM D6916 Shear Strength Between Segmental Concrete Units
B. American Association of State Highway and Transportation Officials (AASHTO)
1. AASHTO M 252 Corrugated Polyethylene Drainage Pipe
2. AASHTO M 288 Geotextile Specification for Highway Applications
C. National Concrete Masonry Association (NCMA)
1. NCMA SRWU-1 Test Method for Determining Connection Strength of SRW
1606382722.doc Page 1 11/19/2015
2. NCMA SRWU-2 Test Method for Determining Shear Strength of SRW
1.04 Submittals/Certification
A. Contractor shall submit a Manufacturer's certification, prior to start of work, that the
retaining wall system components meet the requirements of this specification and the
structure design.
B. Contractor shall submit construction drawings and design calculations for the retaining wall
system prepared and stamped by a Professional Engineer registered in the state of the
project. The engineering designs, techniques, and material evaluations shall be in
accordance with the Keystone Design Manual.
1.05 Quality Assurance
A. Contractor shall submit a list of five (5) previously constructed projects of similar size and
magnitude by the wall installer where the specific or similar retaining wall system has been
constructed successfully. Contact names and telephone numbers shall be listed for each
project.
B. Contractor shall provide evidence that the design engineer has a minimum of five years of
documental experience in the design for reinforced soil structures. The design engineer
shall provide proof of current professional liability insurance with an aggregate coverage limit
of not less than $2,000,000.
C. Owner shall/may provide soil testing and quality assurance inspection during earthwork and
wall construction operations. Contractor shall provide any quality control testing or
inspection not provided by the Owner. Owner's quality assurance program does not relieve
the contractor of responsibility for quality control and wall performance.
1.06 Delivery, Storage and Handling
A. Contractor shall check all materials upon delivery to assure that the proper type, grade,
color, and certification have been received.
B. Contractor shall protect all materials from damage due to jobsite conditions and in
accordance with manufacturer's recommendations. Damaged materials shall not be
incorporated into the work.
PART 2: PRODUCTS
2.01 Definitions
A. Keystone Country Manor Units - a concrete retaining wall element machine made from
Portland cement, water, and aggregates.
B. Structural Geogrid - a structural element formed by a regular network of integrally
connected tensile elements with apertures of sufficient size to allow interlocking with
surrounding soil, rock, or earth and function primarily as reinforcement.
1606382722.doc Page 2 11/19/2015
C. Unit Drainage Fill - drainage aggregate that is placed within and immediately behind the
Keystone concrete units.
D. Reinforced Backfill - compacted soil that is placed within the reinforced soil volume as
outlined on the plans.
2.02 Keystone Concrete Retaining Wall Units
A. Keystone concrete units shall conform to the following architectural requirements:
1. Face color - concrete gray, unless otherwise specified. The Owner may specify
standard manufacturers’ color.
2. Face finish – “weathered” rock face on multiple sides. Other face finishes will not
be allowed without written approval of Owner.
3. Bond configuration – randomly utilize the various shapes to avoid repetition of the
same unit size. Avoid stack bonding of unit joint for more than two courses
vertically.
4. Exposed surfaces of units shall be free of cracks or major imperfections when
viewed from a distance of 10 feet under diffused lighting. Chips and imperfections
are expected with the “weathered” rock face texture and are acceptable unless
adversely affecting installation or structural performance.
B. Keystone concrete materials shall conform to the requirements of ASTM C1372 - Standard
Specifications for Segmental Retaining Wall Units.
C. Keystone concrete units shall conform to the following structural and geometric
requirements measured in accordance with ASTM C140 Sampling and Testing Concrete
Masonry Units:
1. Compressive strength: , 3000 psi (21 MPa);
2. Absorption: , 8 % for standard weight aggregates;
3. Dimensional tolerances: ? 1/8" (3 mm) from nominal unit dimensions not including
rough split face;
4. Unit size: 6" (152 mm)(H) x 10" (254 mm)(D) minimum; width of units varies from 4”
(101 mm) to 16” (406 mm) front and back faces. Two to five unit sizes are
typically available;
5. Unit weight: 25 lbs to 60 lbs (11 kg to 27 kg) per unit.
D. Keystone concrete units shall conform to the following performance testing:
1. Inter-unit shear strength in accordance with ASTM D6916 (NCMA SRWU-2): 800-plf (11
kN/m) minimum at 2-psi (13 MPa) normal pressure;
2. Geogrid/unit peak connection strength in accordance with ASTM D6638 (NCMA
SRWU-1): 400-plf (5 kN/m) minimum at 2-psi (13 MPa) normal force.
E. Keystone concrete units shall conform to the following constructability requirements:
1. Vertical setback: vertical (tilt wall back slightly to achieve positive batter) or 1” (25
mm) + per course per the design;
1606382722.doc Page 3 11/19/2015
2. Alignment and grid positioning mechanism - fiberglass pins, one for each pin
placement series or a minimum of one pin per unit;
3. Maximum horizontal gap between erected units shall be , 1/2 inch (13 mm).
2.03 Shear and Reinforcement Pin Connectors
A. Shear and reinforcement pin connectors shall be 1/2-inch (12 mm) diameter thermoset
isopthalic polyester resin-pultruded fiberglass reinforcement rods to provide connection
between vertically and horizontally adjacent units with the following requirements:
1. Pins shall be 3 3/4” (95 mm) long and capped with a 3/4” (19 mm) diameter
“shoulder”.
2. Flexural Strength in accordance with ASTM D4476: 128,000 psi (882 MPa)
minimum;
3. Short Beam Shear in accordance with ASTM D4475: 6,400 psi (44 MPa) minimum.
B. Shear and reinforcement pin connectors shall be capable of holding the geogrid in the
proper design position during grid pre-tensioning and backfilling.
2.04 Base Leveling Pad Material
A. Material shall consist of a compacted crushed stone base or non-reinforced concrete as
shown on the construction drawings.
2.05 Unit Drainage Fill
A. Unit drainage fill shall consist of clean 1” (25 mm) minus crushed stone or crushed gravel
meeting the following gradation tested in accordance with ASTM D-422:
Sieve Size Percent Passing
1 inch (25 mm) 100
3/4-inch (19 mm) 75-100
No. 4 (4.75 mm) 0 - 10
No. 50 (300 um) 0 - 5
B. Drainage fill shall be placed between, and behind the units as indicated on the design 3drawings. Not less than one cubic foot (0.028 m), of drainage fill shall be used for each 2square foot (0.093 m) of wall face unless otherwise specified.
2.06 Reinforced Backfill
A. Reinforced backfill shall be free of debris and meet the following gradation tested in
accordance with ASTM D-422:
Sieve Size Percent Passing
1606382722.doc Page 4 11/19/2015
2 inch (50 mm) 100
3/4-inch (19 mm) 100-75
No. 40 (425 um) 0-60
No. 200 (75 um) 0-35
Plasticity Index (PI) <15 and Liquid Limit <40 per ASTM D-4318.
B. The maximum aggregate size shall be limited to 3/4 inch (19 mm) unless installation
damage tests have been performed to evaluate potential strength reductions to the geogrid
design due to damage during construction.
C. Material can be site-excavated soils where the above requirements can be met. Unsuitable
soils for backfill (high plastic clays or organic soils) shall not be used in the backfill or in the
reinforced soil mass.
D. Contractor shall submit reinforced fill sample and laboratory test results to the
Architect/Engineer for approval prior to the use of any proposed reinforced fill material.
2.07 Geogrid Soil Reinforcement
A. Geosynthetic reinforcement shall consist of geogrids manufactured specifically for soil
reinforcement applications and shall be manufactured from high tenacity polyester yarn or
high density polyethylene. Polyester geogrid shall be knitted from high tenacity polyester
filament yarn with a molecular weight exceeding 25,000 g/m and a carboxyl end group
values less than 30. Polyester geogrid shall be coated with an impregnated PVC coating
that resists peeling, cracking, and stripping.
B. Ta, Long Term Allowable Tensile Design Load, of the geogrid material shall be determined
as follows:
Ta = Tult / (RFcr*RFd*RFid*FS)
Ta shall be evaluated based on a 75-year design life.
1. Tult, Short Term Ultimate Tensile Strength shall be determined in accordance with
ASTM D4595 or ASTM D6637.
Tult is based on the minimum average roll values (MARV).
2. RFcr, Reduction Factor for Long Term Tension Creep
RFcr shall be determined from 10,000-hour creep testing performed in accordance
with ASTM D5262. Reduction value = 1.45 minimum.
3. RFd, Reduction Factor for Durability
RFd shall be determined from polymer specific durability testing covering the range
of expected soil environments. RFd = 1.10 minimum.
4. RFid, Reduction Factor for Installation Damage
RFid shall be determined from product specific construction damage testing
performed in accordance with ASTM D5818. Test results shall be provided for
each product to be used with project specific or more severe soil type. RFid =
1.05 minimum.
1606382722.doc Page 5 11/19/2015
5. FS, Overall Design Factor of Safety
FS shall be 1.5 unless otherwise noted for the maximum allowable working stress
calculation.
C. The maximum design tensile load of the geogrid shall not exceed the laboratory tested
ultimate strength of the geogrid/facing unit connection divided by a factor of safety of 1.5.
The connection strength testing and computation procedures shall be in accordance with
ASTM D6638 Connection Strength between Geosynthetic Reinforcement and Segmental
Concrete Units (NCMA SRWU-1).
D. Soil Interaction Coefficient, Ci
Ci values shall be determined per ASTM D6706 at a maximum 0.75-inch (19 mm)
displacement.
E. Manufacturing Quality Control
The geogrid manufacturer shall have a manufacturing quality control program that includes
QC testing by an independent laboratory.
The QC testing shall include:
Tensile Strength Testing
Melt Flow Index (HDPE)
Molecular Weight (Polyester)
2.08 Drainage Pipe
A. If required, the drainage pipe shall be perforated or slotted PVC pipe manufactured in
accordance with ASTM D-3034 or corrugated HDPE pipe manufactured in accordance with
AASHTO M252.
2.09 Geotextile Filter Fabric
A. When required, geotextile filter fabric shall be a needlepunched, nonwoven fabric that meets
the requirements of AASHTO M288.
PART 3: EXECUTION
3.01 Excavation
A. Contractor shall excavate to the lines and grades shown on the construction drawings.
Owner's representative shall inspect the excavation and approve prior to placement of
leveling material or fill soils. Proof roll foundation area as directed to determine if remedial
work is required.
B. Over-excavation and replacement of unsuitable foundation soils and replacement with
approved compacted fill will be compensated as agreed upon with the Owner.
3.02 Base Leveling Pad
1606382722.doc Page 6 11/19/2015
A. Leveling pad material shall be placed to the lines and grades shown on the construction
drawings, to a minimum thickness of 6 inches (150 mm) and extend laterally a minimum of
6" (150 mm) in front and behind the Keystone wall unit.
B. Soil leveling pad materials shall be compacted to a minimum of 95 % Standard Proctor
density per ASTM D-698 or 92% Modified Proctor Density per ASTM D1557.
C. Leveling pad shall be prepared to insure full contact to the base surface of the concrete
units.
3.03 Keystone Unit Installation
A. First course of units shall be placed on the leveling pad at the appropriate line and grade.
Alignment and level shall be checked in all directions and insure that all units are in full
contact with the base and properly seated. If vertical unit alignment is chosen, units shall
be uniformly tilted back towards the backfill slightly to create and maintain positive wall
batter.
B. Place the front (any ”weathered” finish side) of units side-by-side. Do not leave gaps
between adjacent units on the front face of the wall. Layout of corners and curves shall be
in accordance with manufacturer's recommendations.
C. Install shear/connecting devices per manufacturer's recommendations.
D. Place and compact drainage fill between and behind wall units. Place and compact
backfill soil behind drainage fill. Follow wall erection and drainage fill closely with structure
backfill.
E. Maximum stacked vertical height of wall units, prior to unit drainage fill and backfill
placement and compaction, shall not exceed one course.
3.04 Structural Geogrid Installation
A. Geogrid shall be oriented with the highest strength axis perpendicular to the wall alignment.
B. Geogrid reinforcement shall be placed at the strengths, lengths, and elevations shown on
the construction design drawings or as directed by the Engineer.
C. The geogrid shall be laid horizontally on compacted backfill and attached to the Keystone
wall pins and within 1 inch of the face of the units. Place the next course of Keystone
concrete units over the geogrid. The geogrid shall be pulled taut, and anchored prior to
backfill placement on the geogrid.
D. Geogrid reinforcements shall be continuous throughout their embedment lengths and
placed side-by-side to provide 100% coverage at each level. Spliced connections between
shorter pieces of geogrid or gaps between adjacent pieces of geogrid greater than 2 inches
are not permitted.
3.05 Reinforced Backfill Placement
1606382722.doc Page 7 11/19/2015
A. Reinforced backfill shall be placed, spread, and compacted in such a manner that
minimizes the development of slack in the geogrid and installation damage.
B. Reinforced backfill shall be placed and compacted in lifts not to exceed 6 inches (150 mm)
where hand compaction is used, or 8 - 10 inches (200 to 250 mm) where heavy compaction
equipment is used. Lift thickness shall be decreased to achieve the required density as
required.
C. Reinforced backfill shall be compacted to a minimum of 95 % Standard Proctor density per
ASTM D-698 or 92% Modified Proctor Density per ASTM D1557. The moisture content of
the backfill material prior to and during compaction shall be uniformly distributed throughout
each layer and shall be dry of optimum, + 0%, - 3%.
D. Only lightweight hand-operated equipment shall be allowed within 3 feet (1 m) from the back
of the Keystone concrete unit.
E. Tracked construction equipment shall not be operated directly upon the geogrid
reinforcement. A minimum fill thickness of 6 inches (150 mm) is required prior to
operation of tracked vehicles over the geogrid. Tracked vehicle turning should be kept to a
minimum to prevent tracks from displacing the fill and damaging the geogrid.
F. Rubber tired equipment may pass over geogrid reinforcement at slow speeds, less than 10
MPH (15 KPH). Sudden braking and sharp turning shall be avoided.
G. At the end of each day's operation, the Contractor shall slope the last lift of reinforced
backfill away from the wall units to direct runoff away from wall face. The Contractor shall
not allow surface runoff from adjacent areas to enter the wall construction site.
3.06 Cap Installation
A. Cap units shall be glued to underlying units with an all-weather concrete construction
adhesive.
3.07 As-built Construction Tolerances
A. Vertical alignment: ? 1.5" (40 mm) over any 10' (3 m) distance.
B. Wall Batter: within 2 degrees of design batter.
C. Horizontal alignment: ? 1.5" (40 mm) over any 10' (3 m) distance.
Corners, bends & curves: ? 1 foot (300 mm) to theoretical location.
D. Maximum horizontal gap between erected units shall be , 1/2 inch (13 mm).
3.08 Field Quality Control
A. Quality Assurance - The Owner shall/may engage inspection and testing services, including
independent laboratories, to provide quality assurance and testing services during
construction. This does not relieve the Contractor from securing the necessary
construction quality control testing.
1606382722.doc Page 8 11/19/2015
B. Quality Assurance should include foundation soil inspection. Verification of geotechnical
design parameters, and verification that the contractor’s quality control testing is adequate
as a minimum. Quality assurance shall also include observation of construction for
general compliance with design drawings and project specifications. (Quality Assurance is
usually best performed by the site geotechnical engineer.)
C. Quality Control – The Contractor shall engage inspection and testing services to perform
the minimum quality control testing described in the retaining wall design plans and
specifications. Only qualified and experienced technicians and engineers shall perform
testing and inspection services.
D. Quality Control testing shall include soil and backfill testing to verify soil types and
compaction and verification that the retaining wall is being constructed in accordance with
the design plans and project specifications.
PART 4: MEASUREMENT AND PAYMENT
1606382722.doc Page 9 11/19/2015
本文档为【Keystone Compac.WORD - keystonewalls.com】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。