首页 中国特色英语词汇

中国特色英语词汇

举报
开通vip

中国特色英语词汇中国特色英语词汇 海啸词汇总结 资料说明: : 海啸词汇总结 tsunami 海啸 natural disaster 自然灾害 tidal waves 潮汐波,浪潮 epicenter 震中 temblor 地震 aftershock 余震 magnitude 震级 tragedy 灾难 wreckage 残骸 death toll 死亡人数 survivors 幸存者 victims 受灾者 tsunami warning system 海啸预警系统 earthquake moni...

中国特色英语词汇
中国特色英语词汇 海啸词汇总结 资料说明: : 海啸词汇总结 tsunami 海啸 natural disaster 自然灾害 tidal waves 潮汐波,浪潮 epicenter 震中 temblor 地震 aftershock 余震 magnitude 震级 tragedy 灾难 wreckage 残骸 death toll 死亡人数 survivors 幸存者 victims 受灾者 tsunami warning system 海啸预警系统 earthquake monitoring 地震监控 international contributions 国际援助 evacuation team 撤运小组 smaller tremors 小震 海啸词汇总结 tsunami 海啸 natural disaster 自然灾害 tidal waves 潮汐波,浪潮 epicenter 震中 temblor 地震 aftershock 余震 magnitude 震级 tragedy 灾难 wreckage 残骸 death toll 死亡人数 survivors 幸存者 victims 受灾者 tsunami warning system 海啸预警系统 earthquake monitoring 地震监控 international contributions 国际援助 evacuation team 撤运小组 smaller tremors 小震动,小地震 中英对照看病就诊名词 医学名词 Medical Terminology 症状 Symptom 药品 Medicine 过敏 Allergy 发烧 Fever medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 高烧 High Fever 健康诊断 Gernral Check-up 发冷 Chillsz Physical Examination 发汗 Sweats 检查 Examination 盗汗 Night Sweats 入院 Admission to Hospotial 倦怠 Tireness 退院 Discharge from Hospital 失眠 Insomnia 症状 Symptom 肩头发硬 Stiffness in Shoulder 营养 Nutrition 打喷嚏 Sneeze 病例 Clinical History 打嗝 Hiccup 诊断 Diagnosis 痒 Itch 治疗 Treatment 腰疼 Low Back Pain 预防 Prevention 头疼 Headache 呼吸 Respiration 痛 Pain (Ache) 便通 Bowel Movement 急性疼痛 Acute Pain 便 Stool 激痛 Severe Pain 血液 Blood 钝痛 dull Pain 脉搏 Pulse, Pulsation 压痛 Pressing Pain 尿 Urine 刺痛 Sharp Pain 脉搏数 Pulse Rate 戳痛 Piercing Pain 血型 Blood Type 一跳一跳地痛 Throbbing Pain 血压 Blood Pressure 针扎似的痛 Prickling Pain 麻醉 Anesthesia 烧痛 Burning Pain 全身麻醉 General Anesthesia 裂痛 Tearing Pain medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 静脉麻醉 Intravenous Anesthesia 持续痛 Continuous Pain 脊椎麻醉 Spinal Anesthesia 不舒服 Uncomfortable 局部麻醉 Local Anesthesia 绞痛 Colic 手术 Operation 放射痛 Rediating Pain 切除 Resectionlie 溃烂痛 Sore Pain 副作用 Side Effect 痉挛痛 Crampy Pain 洗净 Irrigation 顽痛 Persistent Pain 注射 Injection 轻痛 Slight Pain X光 X-Ray 血尿 Bloody Urine 红外线 Ultra Red-Ray 浓尿 Pyuria 慢性的 Chronic 粘液便 Mucous Stool 急性的 Acute 粘土样便 Clay-Colored Stool 体格 Build 验血 Blood Analysis 亲戚 Relative 红血球 Red Cell 遗传 Heredity 白血球 White Cell 免疫 Immunity 呼吸数 Respiration Rate 血清 Serum 呼气 Expiration 流行性的 Epidemic 吸气 Inspiration 潜伏期 Incubation Period 呼吸困难 Difficulty in Breathing 滤过性病毒 Virus 不规则脉搏 Irregular Pulse 消毒 Sterilization 慢脉 Bradycardia 抗生素 Antibiotic 快脉 Rapid Pulse 脑波 E.E.G 尿浑浊 Cloudy Urine medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 洗肠 Enema 蛋白质 Albuminuria 结核反映 Tuberculin Reaction 糖尿 Glucosuria 华氏 Fahrenheit 瘦 thin, Skinny 摄氏 Celsius, Centigrade 肥 Fat 中国特色英语词汇 爱心工程 Loving Care Project ? 安家费 settling-in allowance ? 安慰奖 consolation prize ? 暗箱操作 black case work ? 按资排辈 to assign priority according to seniority ? 按揭贷款 mortgage loan ? 按揭购房 to buy a house on mortgage; to mortgage a house B ? 把关 guard a pass ? 霸权主义 hegemonism ? 吧台 bar counter ? 把握大局 grasp the overall situation ? 拔河(游戏) tug-of-war ? 摆花架子 a metaphor for presenting an attractive facade but in reality lacking substance ? 拜金主义 money worship ? 百年老店 century-old shop ? 白热化 be white-hot ? 摆脱贫困 shake off poverty; lift oneself from poverty ? 拜把兄弟 sworn brothers ? 摆架子 put on airs ? 白马王子 Prince Charming ? 拜年 pay New Year call ? 摆谱儿 put on airs; show off; keep up appearances ? 班车 shuttle bus ? 半拉子工程 uncompleted project ? 板楼,板式楼 slab-type apartment building ? 斑马线 zebra stripes ? 班门弄斧 teach one’s grandma to suck eggs ? 搬迁户 a relocated unit or household ? 半脱产 a partial sabbatical from work ? 帮倒忙 trying to help but causing more trouble in the process ? 傍大款 (of a girl) find a sugar daddy; be a mistress for a rich man; lean on a moneybags ? 包产到户 fixing of farm output quotas for each household; production contracted to each household ? 包产到户 fixing of farm output quotas for each household; production contracted to each household medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high ? 包车 to charter a vehicle (bus, train car, etc.); a chartered vehicle ? 保持国民经济发展的良好势头 maintain a good momentum of growth in the national economy ? 保兑银行 confirming bank ? 暴发户 new rich; upstart (persons or households who suddenly became rich through unscrupulous means or unexpected opportunities) ? 曝光 make public; expose ? 保护伞 protective umbrella ? 保健按摩 therapeutic massage ? 保健品 health care products ? 爆冷门 produce an unexpected winner; a dark horse bobbing up ? 暴力片 splatter film ? 背投屏幕 rear projection screen ? 被摘牌的公司 delisted company ? 本命年 one’s year of birth considered in relation to the 12 Terrestrial Branches ? 奔小康 strive for a relatively comfortable life ? 本本主义 bookishness ? 蹦迪 disco dancing ? 蹦极 bungee, bungee jumping ? 闭关政策 closed-door policy ? 闭门羹 given cold-shoulder ? 比上不足,比下有余 "worse off than some, better off than many; to fall short of the best, but be better than the worst" ? 逼上梁山 be driven to drastic alternatives ? 变相涨价 disguised inflation ? 边远贫困地区 outlying poverty-stricken areas ? 边缘知识人 Marginal intellectuals ? 贬值 devalue, devaluate, depreciate (of a currency) ? 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf 面文章 lip service; surface formality ? 表演赛 demonstration match ? 并网发电 combined to the grid ? 伯乐 a good judge of talent (a name of a legendary person in the state of Qin during the Spring and Autumn Period who excelled in evaluating horses) ? 剥离不良资产 strip bad assets off ? 薄利多销 small profit, large sale volume ? 博彩(业) lottery industry ? 剥夺冠军 strip the gold medal of somebody ? 薄利多销 small profits but quick returns; small profits and good sales ? BP 机 beeper, pager ? B to B (B2B) business to business ? B to C (B2C) business to consumer ? 不打不成交 "No discord, no concord. " ? 不到长城非好汉 He who has never been to the Great Wall is not a true man. ? 不分上下的总统选举结果 the neck-and-neck presidential election result ? 不感冒 have no interest medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high ? 不管部部长 minister without portfolio ? 不良贷款 non-performing loan ? 不买帐 not take it; not go for it ? 步行街 pedestrian street ? 步行天桥 pedestrian overpass ? 不以物喜,不以己悲 not pleased by external gains, not saddened by personnal losses ? 不正之风 bad (harmful) practice; unhealthy tendency C ? 擦边球 "edge ball, touch ball" ? 菜篮子工程 shopping basket program ? 菜鸟,新手 green hand ? 采取高姿态 show magnanimity ? 财务报表 financial statement ? 参拜靖国神社 visit to the Yasukuni war shrine ? 参政、议政 participate in the management of State affairs ? 仓储式超市 stockroom-style supermarket ? 层层转包和违法分保 multi-level contracting and illegal sub-contracting ? 茶道 sado ? 差额选举 competitive election ? 查房 make/go the rounds of the wards ? 拆东墙补西墙 rob Peter to pay Paul ? 拆迁户 households or units relocated due to building demolition ? 禅 dhyana ? 产粮大省 granary province ? 产品积压 overstocked products ? 产品结构 product mix ? 产品科技含量 technological element of a product ? 产品生命周期分析 LCA (Life Cycle Analysis) ? 产权明晰、权责明确、政企分开、科学管理 "clearly established ownership, well defined power and responsibility, separation of enterprise from administration, and scientific management " ? 产权 制度 关于办公室下班关闭电源制度矿山事故隐患举报和奖励制度制度下载人事管理制度doc盘点制度下载 、产权关系 property relations; property order ? 唱高调 mouth high-sounding words ? 长江三角洲 Yangtze River delta ? 长江中下游 the middle and lower reaches of Changjiang River ? 长期共存、互相监督、肝胆相照、荣辱与共 "long-term coexistence, mutual supervision, sincere treatment with each other and the sharing of weal or woe " ? 畅通工程 Smooth Traffic Project ? 常务理事 executive member of the council ? 超前消费 pre-mature consumption; overconsuming; excessive consumption; spend beyond one’s means ? 超前意识 superior consciousness ? 超载过牧 overgraze ? 炒作 speculation (stock); sensationalization (news) ? 扯皮 shirk; pass the buck medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high ? 城镇社会保障体系 urban social security system ? 承包 contract with ? 城乡信用社 credit corroborative in both urban and rural areas ? 吃老本 live on one’s own fat; bask in one’s past glory; rest on one’s laurels ? 持续、稳定、协调发展 sustained, stable and coordinated development ? 吃大锅饭 "egalitarian practice of ""everybody eating from the same big pot"" " ? 吃皇粮 "receive salaries, subsidies, or other supported from the government" ? 充电 recharge one’s batteries; update one’s knowledge; brush up ? 冲帐 strike a balance; counter-balance accounts; reverse an entry ? 重复建设 building redundant project; duplication of similar projects ? 充值卡 rechargeable card ? 筹备委员会 preparatory committee ? 筹划指导委员会 steering committee ? 臭老九 stinking ninth category (of class enemies next to landlords, reactionaries and even spies, etc. , a term of abuse by ultra-Leftists for teachers and other educated people in the 1966-1976 Cultural Revolution) ? 出风头 show off;in the limelight ? 出家 pravrajana; cloister ? 出口转内销 domestic sales of commodities orginally produced for exports ? 触摸屏 touchscreen ? 出气筒 punching bag ? 传销 pyramid sales; multi-level marketing ? 穿小鞋 make it hot for; make trouble for ? 春运 (passenger) transport during the Spring Festival ? 此地无银三百两 A guilty person gives himself away by consciously protesting his innocence. ? 辞旧迎新 bid farewell to the old and usher in the new; ring out the old year and ring in the new ? 从粗放经济转变为集约经济 shift from extensive economy to intensive economy ? 粗放经营 extensive operation ? 粗放式管理 extensive management ? 促进全球经济一体化 foster integration with the global economy D ? 打白条 issue IOU ? 打包儿 use doggy bags to take food home ? 大包干 all-round responsibility system ? 大而全 large and comprehensive; large and all-inclusive ? 大规模杀伤性武器 mass destruction weapon ? 打黑 crack down on speculation and profiteering ? 打假 crack down on counterfeit goods ? 打假办 Office of Cracking down on Fake Products ? 大减价 markdown sales ? 大贱卖 big offering ? 大款 tycoon ? 大腕 top notch, big shot ? 大型电视系列片,长篇电视连续剧 maxi-series medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high ? 大学生创业 university students’ innovative undertaking ? 大要案 major and serious criminal cases ? 大专生 junior college student ? 大专文凭 associate degree ? 待岗 "await job assignment, post-waiting" ? 代培 train on contract; be commissioned to train; directional training ? 代销店 commission agent ? 带薪分流 assign redundant civil servants to other jobs while allowing them to retain their original rank and benefits ? 带薪假期 paid holiday ? 待业 job-waiting ? 待业人员 job-waiting people ? 呆帐 dead account ? 代职 function in an acting capacity ? 单边主义 unilateralism ? 党风建设 construction of the Party conduct ? 党群关系 Party-masses relationship ? 党政机关 Party and government organizations ? 盗版VCD pirated VCD ? 德智体美劳 "all around development of moral, intellectual, physical, aesthetics and labour education " ? 邓小平外交思想 Deng Xiaoping’s diplomatic thoughts ? 低调 low keyed (a metaphor for taking a cautious and slow approach) ? 地方保护主义 regional protectionism ? 地方财政包干制 system whereby local authorities take full responsibility for their finances ? 第三代移动电话(3G手机) third generation mobile; 3G mobile ? 电脑盲 computer illiterate ? 电脑迷 mouse potato ? 点球 penalty kick ? 电视直销 TV home shopping ? 点子公司 consultancy company ? 吊销执照 revoke license ? 丁克一族 DINK (Double Income No Kids) ? 钉子户 person or household who refuses to move and bargains for unreasonably high compensation when the land is requisitioned for a construction project ? "东突"恐怖分子 East Turkistan terrorist ? "豆腐渣"工程 jerry-built project ? 渡假外交 holiday-making diplomacy ? 独生子女 the only child in one’s family ? 对外招商 attract foreign investment ? 多媒体短信服务 MMS (Multimedia Messaging Service) ? 多元化 pluralism ? 多种经营 diversified economy medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
本文档为【中国特色英语词汇】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_260251
暂无简介~
格式:doc
大小:69KB
软件:Word
页数:0
分类:
上传时间:2018-06-19
浏览量:3