开发商交房时必须具备五证两
书
关于书的成语关于读书的排比句社区图书漂流公约怎么写关于读书的小报汉书pdf
三
表
关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf
交房程序应该是业主先验房、开发商修房、业主满意后收房时才交纳合理的费用。
开发商交房时必须具备五证两书三表。交房程序应该是业主先验房、开发商修房、业主满意后收房时才交纳合理的费用。 五证两书是什么,
五证
《国有土地使用证 》
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
《建设用地规划许可证》
《建设
工程
路基工程安全技术交底工程项目施工成本控制工程量增项单年度零星工程技术标正投影法基本原理
规划许可证》
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
《建设工程
施工
文明施工目标施工进度表下载283施工进度表下载施工现场晴雨表下载施工日志模板免费下载
许可证》
《商品房预售(销售)许可证》
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
两书
《住宅质量保证书 》
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
《住宅使用说明书 》
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
三 表
《住宅面积实测表》
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
《
竣工验收
工程竣工验收人防工程竣工验收要求住宅小区规划竣工验收工程竣工验收会议议程工程竣工验收及移交
备案表》
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
《分户验收记录表 》
以上文件齐全才能具备办理房产证的条件
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
<中华人民共和国房屋所有权证>
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic