首页 上网、淘宝网图片不显示的四种解决方案

上网、淘宝网图片不显示的四种解决方案

举报
开通vip

上网、淘宝网图片不显示的四种解决方案上网、淘宝网图片不显示的四种解决方案 淘宝看不到图片 我上淘宝看不图片啊 都很长时间了 大概有一月了 所以不可能是网络问题 还有就是我不是卖家 么有上传图片 就像下面图片这样 我都等了好长时间就是不显示 刷新也不行 解决方案: 方案一:修复网络DNS 1. 打开【电脑管家】?【工具箱】?【DNS优选】: 2. 点击【重新检测】?在平均值最低点(或者是114.114.114.114,已达到更换其他 DNS的目的)点击【启用】: some valve, test its open flexibil...

上网、淘宝网图片不显示的四种解决方案
上网、淘宝网图片不显示的四种解决方案 淘宝看不到图片 我上淘宝看不图片啊 都很长时间了 大概有一月了 所以不可能是网络问题 还有就是我不是卖家 么有上传图片 就像下面图片这样 我都等了好长时间就是不显示 刷新也不行 解决方案: 方案一:修复网络DNS 1. 打开【电脑管家】?【工具箱】?【DNS优选】: 2. 点击【重新检测】?在平均值最低点(或者是114.114.114.114,已达到更换其他 DNS的目的)点击【启用】: some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness test pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot melt connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 using special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to maintain sufficient cooling time, and check the thermal welding results. Pipe diameter (mm) welding depth (mm) heating time (s), plug (s) cool (m) 20 14 5 4 3 25 15 7 4 3 32 16.5 8 6 4 40 18 12 6 4 2, quality control of concrete structure embedded 2.1 in accordance with design 3. 按键盘【win】+【R】打开运行,在运行框中输入“cmd”,按【确定】,在命令行提示符界面中输入“ ipconfig /flushdns” 按键盘【Enter】键: 注:这个方案是为了修复DNS,电脑有可能是因为病毒原因或网络环境问题导致DNS解析不通导致无法访问网页,如果此方案仍无法解决,可以尝试修复本地连接属性中的DNS服务器地址为114.114.114.114进行修复,如果仍然不行,可以尝试修改路由器DNS地址,如果是公司网络请联系公司网管进行网络维护。 方案二:清除缓存 some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness test pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot melt connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 using special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to maintain sufficient cooling time, and check the thermal welding results. Pipe diameter (mm) welding depth (mm) heating time (s), plug (s) cool (m) 20 14 5 4 3 25 15 7 4 3 32 16.5 8 6 4 40 18 12 6 4 2, quality control of concrete structure embedded 2.1 in accordance with design 1. 打开【Internet Explorer】?【设置】?【Internet选项(O)】: 2. 选择【删除(D)】: 3. 勾选所有选项?【删除(D)】: some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness test pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot melt connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 using special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to maintain sufficient cooling time, and check the thermal welding results. Pipe diameter (mm) welding depth (mm) heating time (s), plug (s) cool (m) 20 14 5 4 3 25 15 7 4 3 32 16.5 8 6 4 40 18 12 6 4 2, quality control of concrete structure embedded 2.1 in accordance with design 方案三:重置IE 温馨提示:以下方案会删除您所有的ie设置与记录,建议您先尝试其他的方案后或备 份重要数据后,再行操作~ 1. 打开【Internet Explorer】?【设置】?【Internet选项(O)】: some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness test pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot melt connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 using special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to maintain sufficient cooling time, and check the thermal welding results. Pipe diameter (mm) welding depth (mm) heating time (s), plug (s) cool (m) 20 14 5 4 3 25 15 7 4 3 32 16.5 8 6 4 40 18 12 6 4 2, quality control of concrete structure embedded 2.1 in accordance with design 2. 选择【高级】?【重置(S)】: 3. 点选【删除个人设置(P)】?【重置(R)】: some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness test pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot melt connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 using special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to maintain sufficient cooling time, and check the thermal welding results. Pipe diameter (mm) welding depth (mm) heating time (s), plug (s) cool (m) 20 14 5 4 3 25 15 7 4 3 32 16.5 8 6 4 40 18 12 6 4 2, quality control of concrete structure embedded 2.1 in accordance with design 4. 点选【关闭(R)】: 方案四:安装谷歌浏览器并设为为默认浏览器,使用谷歌浏览器浏览网页 1. 打开电脑管家?点击【软件管理】,在搜索框中输入"谷歌浏览器"?找到软件后点 击安装 2. 安装完成后,打开谷歌浏览器,点击【自定义】?【设置(S)】: 3. 下拉列表,找到默认浏览器,点击【将Google Chrome设置为默认浏览器】: some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness test pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot melt connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 using special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to maintain sufficient cooling time, and check the thermal welding results. Pipe diameter (mm) welding depth (mm) heating time (s), plug (s) cool (m) 20 14 5 4 3 25 15 7 4 3 32 16.5 8 6 4 40 18 12 6 4 2, quality control of concrete structure embedded 2.1 in accordance with design 注:如果以上方案没有解决问题,可以尝试重启路由器再进行访问网页,如果还不行 可尝试关闭退出安防软件再进行访问网站 以上资料来源:QQ电脑管家论坛 some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness test pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot melt connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 using special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to maintain sufficient cooling time, and check the thermal welding results. Pipe diameter (mm) welding depth (mm) heating time (s), plug (s) cool (m) 20 14 5 4 3 25 15 7 4 3 32 16.5 8 6 4 40 18 12 6 4 2, quality control of concrete structure embedded 2.1 in accordance with design
本文档为【上网、淘宝网图片不显示的四种解决方案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_353097
暂无简介~
格式:doc
大小:318KB
软件:Word
页数:0
分类:生活休闲
上传时间:2018-08-09
浏览量:4