首页 机房搬迁总体方案

机房搬迁总体方案

举报
开通vip

机房搬迁总体方案机房搬迁总体方案 信息中心机房 搬迁实施方案 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical devia...

机房搬迁总体方案
机房搬迁总体 方案 气瓶 现场处置方案 .pdf气瓶 现场处置方案 .doc见习基地管理方案.doc关于群访事件的化解方案建筑工地扬尘治理专项方案下载 信息中心机房 搬迁实施方案 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 目 录 第一章 项目介绍................................................................................ 2 一. 项目描述 .................................................................................. 2 二. 机房主要设备详单 ................................................................... 2 第二章 机房搬迁实施方案................................................................. 6 一(人力安排 .................................................................................. 6 二(设备情况调研 ........................................................................... 7 二(搬迁准备 ...................................................错误~未定义书签。 二(搬迁实施 ...................................................错误~未定义书签。 第三章 系统应急与灾难恢复方案 ................................................... 10 第四章 注意事项 软件开发合同注意事项软件销售合同注意事项电梯维保合同注意事项软件销售合同注意事项员工离职注意事项 ...............................................................................11 第五章 后期维护.................................................错误~未定义书签。 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 第一章 项目介绍 一( 项目描述 计划将位于大厦2楼机房中的所有计算机设备搬迁至新大楼的中心机房,为了确保整个机房搬迁的顺利进行,保证将所有设备安全可靠搬迁到新的机房,并确保所有设备和应用系统及时正常启动,确保业务系统正常开展和数据的安全有效,将承担制定的信息系统设备搬迁任务,提供具体的实施技术方案。 二(机房主要设备详单 1、小型机+磁盘阵列(双机加阵列) (1)HP rx7620(2台)+日立HDS 9570 主机:8*Intel Itanium 2 CPU,16G PC2100 ECC内存,36.4G SCSI硬盘,10/100/1000BT以太网口,2N+1个冗余热插拔电源。 备机:4*Intel Itanium 2 CPU,8G PC2100 ECC内存,36.4G SCSI硬盘,10/100/1000BT以太网口,2N+1个冗余热插拔电源。 存储:146GB 10RPM磁盘22个。 McDATA4300光纤交换机(2台):4*光纤模块。 (2)IBM P630(2台)+IBM 7133 主/备机:POWER4+1.2G*4,4GRAM,36G*2, 单电源,双网卡。 存储:4*146GB。 2(服务器 (1)IBM x3850 M2(3台)(保内) A(其中2台:2*Xeon 7350,8*1GB,3*HS 146G SAS,2*1440W。 B(其中1台:4*Xeon 7330,8GB,3*HS 146G SAS,2*1440W。 (2)IBM x3650(4台)(保内) 至强MP3.0GHz,4G内存,3*73.4G SCSI热插拔硬盘。 (3)IBM x365(4台)(保外) 4*至强MP2.2GHz,4G内存,3*73.4G SCSI热插拔硬盘,双千兆以太网适配器,双电源。 (4)浪潮英信NF420R(2台)+磁盘阵列(保外) 3 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 主/备机:Xeon MP2.2G*2,4GECC DDRRAM,73 G *2,双电源,双网卡。 存储:73 G *4。 (5)浪潮NF560D2(2台)+AS400光纤磁盘阵列(保内) 主/备机:2*四核XeonE7420,8G内存,3*146G 15000转热插拔SAS硬盘,2*千 兆网卡,热插拔1200W 1+1冗余电源。 存储:8*300G 15000转SAS硬盘。 (6)曙光I220-XV1塔式服务器(2台)(保外) X2.4/1G/36G。 (7)曙光R220-MP1机架式服务器(4台)(保外) 2颗XEON MP2.0G CPU,4G ECC DDR内存,2块36G SCSI热插拔硬盘,双1000M RJ—45网卡,冗余双电源 (8)维豪机架式服务器(3台)(保外) (9)IBM x345(1台)(保外) (10)IBM x346(1台)(保外) (11)浪潮英信NF360R(1台)(保外) (12)信产局曙光服务器(2台)(保内) 3(网络设备 (1)华为NE05路由器(1台)(保外) (2)华为S6506交换机(3台)(保外) (3)华为S3026C交换机(4台)(保外) (4)华为S3026E交换机(3台)(保外) (5)华为AR 28-80路由器(1台)(保外)(省厅设备) (6)华为2600系列路由器(1台)(保外)(省厅设备备份) 4(安全设备 (1)东软NetEyeFW4120防火墙(2台)(1台保外,1台保内) (2)东软NetEyeFW4120 VPN网关(1台)(保外) (3)意源IB-NPS3000网闸(1台)(保外) (4)华为Eudemon200防火墙(1台)(保外) (5)天融信NGFW4000-T防火墙(1台)(保外)(未启用) seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft (6)东软NetEye IPS7100(1台)(保内) (7)H3C SecPath F100-A-SI防火墙(1台)(保内)(信产局) 5(不间断电源 科士达UPS:30KVA,10组电池柜,120节电池,保外。 6(空调 格力空调 7(涉及的软件 软件包含了IBM 微码、操作系统和双机软件。HP微码、操作系统和双机软件。所有PC 服务器操作系统和机群软件和所有网络、安全设备的管理配置软件。WEB LOGIC 中间件,ORACLE数据库。容灾软件,山大???应用软件。 5 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 第二章 机房搬迁实施方案 一、人力安排 工程师 主要负责 内容 财务内部控制制度的内容财务内部控制制度的内容人员招聘与配置的内容项目成本控制的内容消防安全演练内容 人数 责任单位 HP小型机工程师 负责HP小型机软硬件系统调研、拆装、维修、2 ??? 运行维护;项目负责人 ??? IBM小型机工程师 负责HP小型机软硬件系统调研、拆装、维修、2 运行维护; ??? 网络工程师 负责UPS的调研、拆装、维修、运行维护 2 PC 服务器工程师 负责PC 服务器的调研、拆装、维修、运行2 ??? 维护 UPS工程师 负责UPS的调研、拆装、维修、运行维护 1 ??? 空调工程师 负责空凋的调研、拆装、维修、运行维护 1 ??? ORACLE数据库专家 负责数据库的调研、安全、维修、运行维护 2 当地 运输团队 比较专业的运输公司出人力和搬运设备 多人 ??? 商务辅助 提供预防性设备到场; 2 ??? 当出现设备损坏及时补充备件到场 灾难恢复专家 确保不出现数据丢失 1 ??? 系统整合 完成硬件的整合和重建,确保系统整体可用性 2 ??? 山大?? ? 用户 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 三、搬迁准备 1(设备迁移前的准备工作(新机房) 1) 新机房内的准备工作主要是对于机房环境的确认,包括:市电供电系 统环境确认,供电系统线路情况确认,各种电压测量,空调设备的正常运 转情况。新场地的环境要达标,电压,,,,,零地电压小于,,,温度 在,,摄氏度正负,摄氏度之内。电源插座符合小型机的要求。 2)、根据静电地板承重能国规划各个机柜、各个网络设备的摆放位置。可 以事先量好机器的具体尺寸,之后到现场规划机器的具体摆放位置,力争最 合理、最充分地利用机房的有效空间。 3)、UPS供电系统,电池供电性能检测,UPS主机参数确认,UPS供电输 出参数测量。这是有一点要注意,关键服务器的电源插座要参考老机房的插 座标准制作,确保规格和型号保持一致。提前准备好电源,保证服务器到位 能及时上电测试。 4)、网络环境确认 对新机房的外网要提前调试好,测试与远程各点的连通情况,特别要保 证关键医院、药店的联网情况。内网布线调试工作提前做好,保证核心交换 上架后各楼层内网能正常。 新机房的环境准备工作要提前做好,关键的电源、网络准备充分后,才 能进行搬迁,否则一旦某个环节出现问题,将影响业务正常启用。 2( 运输方案确定 (1)运输公司的确定,在当地或就近聘请机房专业的搬家运输公司。运输人力在8人以上,并由升降车,平推车等。 (2)搬运线路的勘查。 (3)木箱、海绵、防震垫、海绵、防静电袋、硬盘专用箱等准备。 (4)阵列硬盘单独包装运输。 (5)主机采用部分整体搬迁模式运输。 3(人力准备 7 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 用户等相关人员在2周前确定协调一致。 4(备份工作 (1)数据备份 所有关键数据(包括程序,数据库,各服务器的配置参数、操作系统等)的全备份。其中数据库数据备份前1天先做1套备份,一套备份在1TB的移动硬盘上,以套备份在磁带上,备份出来的介质经验证可靠后单独存放,专人保管。 以上工作在搬迁的前几天可以分期完成,系统备份工作平时也是工作内容。 (2)系统软件备份 操作系统除了hp小型机的hpux操作系统和ibm小型机的aix操作系统外,其他与都是windows server 2003,基本应用为weblogic,oracle,???软件系统等都要备份。首先确保极其的系统盘严格有镜像备份,其次要用磁带完成系统备份。 在给主机关机断电之前,需要严格按照顺序来关闭应用软件及进程,等所有应用软件进程全部停止,则关闭操作系统。 四(搬迁实施 1(最后一次完整数据备份工作 所有关键数据(包括程序,数据库,各服务器的配置参数、操作系统等)的全备份。其中数据库数据备份做两套备份,一套备份在1TB的移动硬盘上,以套备份在磁带上,备份出来的介质经验证可靠后单独存放,专人保管。 在搬迁前(服务器关机下电前)要最后做一次完整的全备份。 2(标记线缆和设备 由相关硬件工程师对服务器和存储设备的连接进行打标工作,在设备的显著位置标记编号,在线缆的两头标记所连接的设备编号,并在标记过程中对设备和线缆的位置有一个总体上的认识。 3(机房搬迁步骤(设备至新机房) 如果新、老机房的各项准备工作提前做好做细,机房的整体搬迁从进场 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 准备到搬迁、测试完毕大概需要三天时间,搬迁工作建议发布停机3天的通 告。大致可以安排在第一天各设备下架搬迁,第二天各设备上架加电测试, 第三天整体测试。 具体的搬迁步骤统计在下面表中: 步骤 时间 主要工作内容 负责方 关键数据的全备份,注意检查确认备份数据备份 停机后 ???、应用方 有效性。 检查各个设备连线,信号灯,液晶显示小型机、存储巡检 停机后 ?? 屏等,查看是否有错误,检查标签 网络设备检查 停机后 核对各交换机端口, 记录 混凝土 养护记录下载土方回填监理旁站记录免费下载集备记录下载集备记录下载集备记录下载 配置信息 网络集成商 应用服务器检查 停机后 核对应用服务器配置信息 ???、应用方 说明:以上检查工作在做备份时同步进行 小型机、存储关机 第一天 正常关闭双机、数据库系统后下电 ?? 小型机、存储下架 第一天 将机器下架出机柜,同时做好编号 ?? 包括网络、应用服务器等设备的下架 其它设备下架 第一天 网络工程师、??? 做好 下架设备打包 第一天 看需要,关键设备最好包上塑料膜防震 搬家公司 说明:下架工作各司其职,做好自已设备记录,螺丝包装好做上说明 安排一辆货运车,一次性的把与主机和磁盘阵列相关所有的设 备都运输到新机房大楼,准备好一些防雨的油布或塑料薄膜可 以以防万一下雨时挡雨用(了解天气情况,最好不要安排雨天装车搬运 第一天 搬迁)。注意过程中尽量避免剧烈的碰撞。到达新机房后,将 设备按照放置到机柜附近位置并清点设备清单,避免搬迁过程 中有所遗漏。 小型机和机柜到了新机房后,即可安排 小型机、存储上架 第一天 人员上架,同时按原来的位置做好连线?? 工作 将小型机及存储阵列上电,并按照磁盘 阵列、小型机的顺序依次开机,注意的 是,要待上一台系统启动完毕后再开下 小型机、存储加电测一台设备。启动后,检查磁盘阵列,小第一天 ?? 试 型机信号灯是否正常,在磁盘阵列和小 型机上检查错误日志,看其是否正常启 动。最后在小型机上检查阵列上的文件 系统是否被正常识别 按照原先记录的位置将所有网络和安 全设备以及应用服务器上架并连接,并网络、服务器等上架第一天 给设备上电开机,检查其参数及规则设网络、应用 加电测试 定,检测搬迁过程有没有损坏设备硬 件,以及原有设备规则设定是否保存良 9 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 步骤 时间 主要工作内容 负责方 好。 说明:为节省时间,第一天如果能完成搬迁工作,当晚加班将设备先上架加电测试,主要看设备能不能正常启动起来,有无告警灯,这样还有时间及时更换备件。如果搬迁工作一天很难完成, 尽量先搬关键设备如主机、存储和其机柜,我们会为您及时检查设备情况 连接好各网络设备的网线,测试内外网网络连接、调试 第二天 网络、应用、运营商 是否正常,保证网络正常运行 双机及数据库启动 第二天 测试数据库是否正常 ??、应用 应用服务器接入网络,测试能否连上数应用服务器启动 第二天 ???、应用 据库 说明:以上可以同步进行,内外网可以同时连线,内网通了就可以做数据库连接测试 数据检查 第三天 检查数据库中数据是否正常 应用 应用全面测试 第三天 检查应用程序是否正常 应用 测试备份系统能否正常备份,确保数据备份系统测试 第三天 应用 安全。 容灾系统测试 第三天 测试原有容灾系统是否正常 应用、??? 第三章 系统应急与灾难恢复方案 1.应急措施 前提:所有的和数据备份完整无缺,容灾系统正常。 具体内容: (1)当数据发生丢失的时候,使用备份数据来恢复; (2)当ORACLE数据丢失时,我公司直接联系ORACLE原厂工程师提供灾难恢复工具并解决问题及数据的恢复。以保证数据的安全可靠性。 (3)当服务器硬件发生故障的时候,立即联系我公司备件中心,尽快更换备件,如果该主机有集群,把应用系统切换到集群系统备机上,如果是非集群主机,暂时调整应用,尽量使应用系统先运行起来。 (4)发生严重灾难主备机都无法正常工作时,启用容灾系统,保证容灾系统网络正常。 (5)如主机有硬件故障,从最近的备件库提取相应设备更换之。 2.提供整机、阵列、易坏件到场,保证系统安全 (1)提供一台小型机以作备份机器使用,事先在备机上安装和现场一样的操作系统和ORACLE,以便及时切换。 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft (2)针对核心数据存放在HDS存储上的现状,提供一台HDS9500V存储 以作备份使用,如果发生阵列损坏的灾难性故障问题,则及时切换使用。 (3)提供IBM pcserver和其他的pcserver的硬盘(曙光,浪潮)各2块。 因为在搬家过程中,硬盘是最容易损坏的硬件,如果有损坏,及时更换。 (4)提供华三交换机模块2个以作备份,如果搬迁过程中出现问题,把 备份的配置信息及时恢复。 (5)提供小型机连接的san,switch模块2个,光纤线5根,在插拔光纤 的时候容易把光纤线或者模块搞坏,如果出现类似光纤不同状况,急于更换。 (6)提供ibm 7133 存储硬盘2块,存储虽然有raid5 和 hotspare的保护 措施,但是在损坏硬盘的时候要急时更换。 (7)提供网线及水晶头或成品的网线,在搬运网络柜的交换机时,避免 不了一些网线无法使用等情况。 第四章 注意事项 (1)特别注意人身安全:首先注意不要触电;其次由于机柜、机架等都是金属,有较锋利边缘,易划伤手;机器等都很重易砸伤脚,要特别注意。 (2)搬迁前的准备工作一定要细致,对各个设备的布局和线缆的位置要了解清楚,并做详细的标注,包括出具结构拓扑图,位置示意图,设备和线缆的标记,系统重要数据的备份等等。 (3)搬迁时,尽量避免剧烈的碰撞,要做到轻拿轻放,在装车时,各个设备和设备与车厢之间要放置泡沫塑料或纸板来减轻运输途中的碰撞。 (4)搬迁前和搬迁后都要根据设备清单对设备进行清点,避免遗漏。 (5)整个搬迁过程中,和各个应用系统和设备负责人、服务商做好沟通协调工作。 (6)UPS的搬迁可能耗时较长,设备加电测试时可以先用市电进行。单位最好在新机房留用电工及时配合。 (7)搬迁前通知网络运营商提供线路切割。 第五章 后期维护 机器搬迁重新建立系统,经测试完全正常使用,并维修替换完所有搬迁中的 11 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 损坏部件后,主要人员需要在现场观察3天以上,项目负责人需要在系统稳定工 作1周后撤离。 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 13 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 1、搬迁前准备工作 a) 对需搬迁设备及其连接电缆进行真,设备进行编号,确定搬迁后的位置, 作成表格: 序号 设备名称 设备编号 目标机柜 b) 准备好所需要的网络跳线及光纤跳线。 c) 完成临时线路安装及测试。 d) 做好施工组织方案,并通知相关人员准时到场。 2、原有IT设备的临时搬迁 本次机房改造工程是在原有老机房的基础上进行改造,本阶段搬迁主要的针对原有老机柜老设备的临时搬迁:原有老机柜13台,其中网络机柜6台,服务器机柜7台,在机房拆除时就应考虑分区域拆除,先完成管理机房及钢瓶间的拆除及装修工作,将所有服务器设备及部分网络设备临时搬迁至管理机房,考虑到网络接入光缆及楼层水平布线的长度问题,将部分网络设备临时搬迁至钢瓶间。搬迁安排如下: 1)搬迁条件 , 管理机房、钢瓶间完成装修。 , 临时强、弱电电缆搭建完毕。 , 搬迁小组各人员到位,并详细了解注意事项。 2)搬迁安排 , 设备搬迁工作安排在节假日进行,持续时间1~2天。 , 设备拆除前应关闭电源。 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft , 设备搬迁时考虑先搬迁网络设备,网络设备搬迁完毕后,调式小组负责 对网络系统的恢复,搭建好网络平台。 , 服务器设备的搬迁应一台一台搬迁,搬一台调试一台。 , 若紧急情况,请专家及时指导解决。 3、电池的搬迁 电池的搬迁时间受电池间加固工程影响,在电池间加固工程完成后,开始电 池的搬迁工作。 1)搬迁条件 , 电池间加固工程完毕。 , 电池间装修完成。 , 电池间强电电缆铺设到位。 , 临时场地的空调到位。 , 搬迁小组各人员到位,并详细了解注意事项。 2)搬迁安排 , 设备搬迁工作安排在节假日进行,持续时间1~2天。 , 设备拆除前应关闭UPS主机,UPS的关闭开启应由UPS厂家技术人员进 行。 , 电池共有4个1000*1000*1800的电池架,应一个电池架一个电池的搬 迁。 , 在遇到有明显老化的电池(鼓出或漏液)时,应及时通知甲方,及时更 换。 , 电池搬迁完毕后,UPS开机,检测是否正常。 4、原有IT设备的二次搬迁 在主机房区域拆除装修完毕,新增机柜到位,强弱电管线铺设测试完毕后, 15 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft 应安排将临时场地的IT设备搬迁回主机房区域。 1)搬迁条件 , 主机房区装修完毕。 , 主机房强弱电管线铺设完毕,并测试通过。 , 精密空调、新风安装调试完毕。 , 搬迁小组各人员到位,并详细了解注意事项。 2)搬迁安排 , 设备搬迁工作安排在节假日进行,持续时间1~2天。 , 设备拆除前应关闭临时电源。 , 设备搬迁时考虑先搬迁网络设备,网络设备搬迁完毕后,调式小组负责 对网络系统的恢复,搭建好网络平台。 , 服务器设备的搬迁应一台一台搬迁,搬一台调试一台。 , 若紧急情况,请专家及时指导解决。 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft (1)机房装修 建筑装修是整个机房的基础。它主要起着功能区的合理划分及保证机房环境达标的作用。对机房平面作整体规划,并进行相应的装修 设计 领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计 。机房装修不同于普通装修,要求防尘、防水、防静电、防鼠、保温、防结露、阻燃并具有良好的抗电磁场干扰性。 (2)机房电气系统 机房的供配电系统是一个综合性系统,是机房高可用性的保证。电子信息设备投入服务后如无一个长期稳定可靠的供电系统来保证设备正常运行,势必造成不良后果。 包括低压配电柜、在线扩容的模块化UPS不间断电源系统、照明系统、辅助供配电、电缆线路敷设等。 (3)机房空调新风系统 机房空调新风系统是机房运行环境的保障。电子信息系统设备是高精密的电子设备,对机房环境有严格的要求,其中最重要的是温度、湿度和洁净度。即是所谓的三度要求。 主机房配备行级水冷式空调系统及VRV吸顶式空调,并配备相应的新风、排烟系统。 (4)机房消防系统 机房火灾自动报警与气体灭火系统能自动捕捉监测区内火灾发生时的烟雾或热气,发出声光报警;同时,具有“联动”功能,即通过控制线路将消防给气设备,按照规定的要求动作,指挥各种消防设备在火灾时密切配合,各司其职,投入工作。 气体消防区域主要为主机房、配电间。 (5)机房接地和防雷系统 机房防雷接地系统是整体机房安全运行的保证。机房设施的雷击过压及电磁干扰防护,是保护通信线路、设备及人身安全的重要技术手段,是确保通信线路畅通、设备安全运行不可缺少的技术环节。 (6)机房环境监控系统 机房环境监控系统保障机房的安全可靠,实现机房控制的高度自动化,它要求以最少的维护人员,最优化的运营维护手段,来实时监控机房中设备所处的物理环境。 机房环境监控系统包括数字摄像、设备监控(UPS、精密空调、低压配电柜)、环境监控(室内温、湿度、测漏)等。 (7)机房机柜系统 随着IT业的飞速发展变化,现代化机房里面的IT设备多为机架式设备,如机架式服务器、刀片式服务器,安装在标准的19英寸42U机柜里面,一个机柜的负载量一般小于3KVA,少数机柜负载量会高达10KVA甚至更高。 机柜内的IT微环境不但要保证现在的IT设备的正常工作,也必须预留可扩容的能力,保证今后的IT设备的需求,这是一个很重要的机房设计要求。 (8)机房KVM系统 KVM系统是通过恰当的键盘、鼠标和显示器的配置及其在不同设备之间或不同的机房之间进行多种方式的切换连接,将机房内的一对一进行的设备维护工作延伸到机房外的任何一处,提高工作效率和物理设备的安全性,实现无人机房管理。 17 seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not more than 2 mm per metre, not more than ? 10 mm long; 7, after installation is complete, 1.0MPA water pressure test for strength and 0.6MPA hydraulic tightness Drainage installation drainage system using triage system in the interior design, into the sewage system, water system parts, riser by bonding of UPVC drainage pipe construction, transfer floor cast iron drainage pipes by centrifugal casting, clasp connection of buried pipeline using centrifugal casting iron pipe, socket socket connections, sealing of cement mortar. Diameter of DN100~DN150. Embedded stage of construction stage is divided into structural and piping installed. 1, submersible pumps installation: systems use submersible pumps of product certification and quality control technical documents. Submersible pump installation shall meet the following requirements: 1.1 location, elevation, the design requirements; 1.2 equipment integrity, damage and corrosion, pipe protection intact; turning flexible and no clean sound; 1.3-drive steering confirmation, direction compatible with the pump. Leveling should be based on the level of the pump cover, shaft protruding parts, base level work surface as the basis for measurement, longitudinal and transverse level deviation should not exceed 0.1%. 1.4 after the driving shaft and the driven shaft
本文档为【机房搬迁总体方案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_435706
暂无简介~
格式:doc
大小:142KB
软件:Word
页数:34
分类:生活休闲
上传时间:2017-10-26
浏览量:34