首页 苹果ipad产品介绍

苹果ipad产品介绍

举报
开通vip

苹果ipad产品介绍苹果ipad产品介绍 附——平板电脑报价表 单市场参考价商品名称 型号 基本配置 位 (元/台) 9.7英寸/电容式触摸屏/操作系统:iOS 4.3/处理器: A5 1GHz/系统内存512MB/存储容量16GB/屏幕分辨率:平板电脑 ipad2 台 3880 1024×768/双摄像头(前30万,后70万像素/续航时 间8小时左右/WiFi功能/ iPad产品简介 ipad 2 苹果iPad 2(16G/WIFI版)参数规格查看: 更多信息 或 更多图片 基本参数 上 市2011年03月 时 间 ...

苹果ipad产品介绍
苹果ipad产品介绍 附——平板电脑报价表 单市场参考价商品名称 型号 基本配置 位 (元/台) 9.7英寸/电容式触摸屏/操作系统:iOS 4.3/处理器: A5 1GHz/系统内存512MB/存储容量16GB/屏幕分辨率:平板电脑 ipad2 台 3880 1024×768/双摄像头(前30万,后70万像素/续航时 间8小时左右/WiFi功能/ iPad产品简介 ipad 2 苹果iPad 2(16G/WIFI版)参数规格查看: 更多信息 或 更多图片 基本参数 上 市2011年03月 时 间 操 作iOS 4.3 系 统 处 理A5 双核,1GHz 器 系 统512MB 内 存 16GB 存 lifting the plug, drainage should be discharged quickly. Close the mouth immediately after shutting the water flow, water seeping in around the faucet without; check the Flushing apparatus sensitivity and reliability. 2 water debug each of the pump motor in the pumping station through the emergency stop button to stop running tests each drain pump starts and automatically selected alternate. 3 devices in the drainage system drainage systems, pipes and accessories for drainage open, smooth gravity flow, siphon rainwater drainage system, meet the design specification. 5.4.2.2 test all drain water drain water test after installation according to the design requirements. Individual days or as piped irrigation Rainwater of the canopy height must each riser at the top of the rain pipe. Fee for concealed or buried drainage pipe irrigation experiment needs to be done before the hidden, the height shall be not less than the lower ground level of irrigation, water after 15 minutes, and then filled the last 5 minutes, if the liquid level does not drop that is qualified. 5.4.2.3 health apparatus water test all the health apparatus installed must be 24 hour water test. Hold water: toilet high tank filled as required; each kind of wash basin, lavatory, laboratory basin should be filled to overflow water pan, MOP, sink at least deep two-thirds; bath of one-third cylinder deep. Test results to sanitary appliances not leakage is qualified. Project quality management section engineering code for construction and acceptance of quality objectives to meet the national, both of the bidding documents and drawings with brilliant construction to 储 容 量 显示屏 屏 幕9.7英寸 尺 寸 屏 幕 分1024×768 辨 率 屏 幕电容式触摸屏,多点式触摸屏 描 述 指 取触摸屏 设 备 设 备IPS屏幕,LED背光,Multi-Touch显示屏,支持132ppi清晰度,耐指纹抗油涂层 描 述 支 持支持多种语言文字同时显示 语 言 网络链接 WiFi功WIFI无线上网,支持802.11b/g/n无线 协议 离婚协议模板下载合伙人协议 下载渠道分销协议免费下载敬业协议下载授课协议下载 能 网Wifi+3G版支持3G网络 络 lifting the plug, drainage should be discharged quickly. Close the mouth immediately after shutting the water flow, water seeping in around the faucet without; check the Flushing apparatus sensitivity and reliability. 2 water debug each of the pump motor in the pumping station through the emergency stop button to stop running tests each drain pump starts and automatically selected alternate. 3 devices in the drainage system drainage systems, pipes and accessories for drainage open, smooth gravity flow, siphon rainwater drainage system, meet the design specification. 5.4.2.2 test all drain water drain water test after installation according to the design requirements. Individual days or as piped irrigation Rainwater of the canopy height must each riser at the top of the rain pipe. Fee for concealed or buried drainage pipe irrigation experiment needs to be done before the hidden, the height shall be not less than the lower ground level of irrigation, water after 15 minutes, and then filled the last 5 minutes, if the liquid level does not drop that is qualified. 5.4.2.3 health apparatus water test all the health apparatus installed must be 24 hour water test. Hold water: toilet high tank filled as required; each kind of wash basin, lavatory, laboratory basin should be filled to overflow water pan, MOP, sink at least deep two-thirds; bath of one-third cylinder deep. Test results to sanitary appliances not leakage is qualified. Project quality management section engineering code for construction and acceptance of quality objectives to meet the national, both of the bidding documents and drawings with brilliant construction to 模 式 蓝 牙支持,蓝牙2.1模块 功 能 音频视频 声 音立体声扬声器,内置麦克风 系 统 音 频支持AAC,MP3,VBR,AIFF,WAV格式 格 式 视 频支持VGAA,MP4,mov,MPEG格式 格 式 外置接口 音 频3.5mm耳机接口 接 口 视 频mini HDMI接口 接 口 其 他苹果Dock接口 接 口 电源参数 电聚合物锂电池 池 lifting the plug, drainage should be discharged quickly. Close the mouth immediately after shutting the water flow, water seeping in around the faucet without; check the Flushing apparatus sensitivity and reliability. 2 water debug each of the pump motor in the pumping station through the emergency stop button to stop running tests each drain pump starts and automatically selected alternate. 3 devices in the drainage system drainage systems, pipes and accessories for drainage open, smooth gravity flow, siphon rainwater drainage system, meet the design specification. 5.4.2.2 test all drain water drain water test after installation according to the design requirements. Individual days or as piped irrigation Rainwater of the canopy height must each riser at the top of the rain pipe. Fee for concealed or buried drainage pipe irrigation experiment needs to be done before the hidden, the height shall be not less than the lower ground level of irrigation, water after 15 minutes, and then filled the last 5 minutes, if the liquid level does not drop that is qualified. 5.4.2.3 health apparatus water test all the health apparatus installed must be 24 hour water test. Hold water: toilet high tank filled as required; each kind of wash basin, lavatory, laboratory basin should be filled to overflow water pan, MOP, sink at least deep two-thirds; bath of one-third cylinder deep. Test results to sanitary appliances not leakage is qualified. Project quality management section engineering code for construction and acceptance of quality objectives to meet the national, both of the bidding documents and drawings with brilliant construction to 类 型 续 航10小时左右,具体时间视使用环境而定 时 间 功能参数 摄 像双摄像头(前置:30万像素,后置:70万像素) 头 图 片支持JPG,TIFF,GIF格式 浏 览 内 置方向感应器,环境光线感应,距离感应器 感 应 其 他加入FaceTime功能,1080p高清视频输出功能,FaceTime视频通话功能,GarageBand音乐软件 功 能 外观参数 产 品241.2×185.7×8.8mm 尺 寸 产 品601g 重 量 机 壳玻璃和不锈钢材质 材 质 lifting the plug, drainage should be discharged quickly. Close the mouth immediately after shutting the water flow, water seeping in around the faucet without; check the Flushing apparatus sensitivity and reliability. 2 water debug each of the pump motor in the pumping station through the emergency stop button to stop running tests each drain pump starts and automatically selected alternate. 3 devices in the drainage system drainage systems, pipes and accessories for drainage open, smooth gravity flow, siphon rainwater drainage system, meet the design specification. 5.4.2.2 test all drain water drain water test after installation according to the design requirements. Individual days or as piped irrigation Rainwater of the canopy height must each riser at the top of the rain pipe. Fee for concealed or buried drainage pipe irrigation experiment needs to be done before the hidden, the height shall be not less than the lower ground level of irrigation, water after 15 minutes, and then filled the last 5 minutes, if the liquid level does not drop that is qualified. 5.4.2.3 health apparatus water test all the health apparatus installed must be 24 hour water test. Hold water: toilet high tank filled as required; each kind of wash basin, lavatory, laboratory basin should be filled to overflow water pan, MOP, sink at least deep two-thirds; bath of one-third cylinder deep. Test results to sanitary appliances not leakage is qualified. Project quality management section engineering code for construction and acceptance of quality objectives to meet the national, both of the bidding documents and drawings with brilliant construction to 机 壳黑色 颜 色 平板电脑附件 包平板电脑主机 x1 装连接线 x1 清说明书 x1 单 充电器 x1 保修信息 保 修全国联保,享受三包服务 政 策 质 保1年 时 间 质 保1年硬件维修,90天电话支持 备 注 客 服400-627-2273 电 话 详苹果公司为所有在保修期内的苹果产品提供全球保修服务。AppleCare维护 计划 项目进度计划表范例计划下载计划下载计划下载课程教学计划下载 (ACPP)或 Appl细eCare优质服务与技术支持方案(APSS)扩展的维修服务、技术支持同样为苹果桌面型电脑、服内务器和显示器提供全球保修服务。无论ACPP或APSS是在哪个国家或地区购买的,由它们涵盖的容 产品的维修服务与响应时间都取决于苹果在使用产品的所在国家或地区的苹果产品维修细则。 优势 lifting the plug, drainage should be discharged quickly. Close the mouth immediately after shutting the water flow, water seeping in around the faucet without; check the Flushing apparatus sensitivity and reliability. 2 water debug each of the pump motor in the pumping station through the emergency stop button to stop running tests each drain pump starts and automatically selected alternate. 3 devices in the drainage system drainage systems, pipes and accessories for drainage open, smooth gravity flow, siphon rainwater drainage system, meet the design specification. 5.4.2.2 test all drain water drain water test after installation according to the design requirements. Individual days or as piped irrigation Rainwater of the canopy height must each riser at the top of the rain pipe. Fee for concealed or buried drainage pipe irrigation experiment needs to be done before the hidden, the height shall be not less than the lower ground level of irrigation, water after 15 minutes, and then filled the last 5 minutes, if the liquid level does not drop that is qualified. 5.4.2.3 health apparatus water test all the health apparatus installed must be 24 hour water test. Hold water: toilet high tank filled as required; each kind of wash basin, lavatory, laboratory basin should be filled to overflow water pan, MOP, sink at least deep two-thirds; bath of one-third cylinder deep. Test results to sanitary appliances not leakage is qualified. Project quality management section engineering code for construction and acceptance of quality objectives to meet the national, both of the bidding documents and drawings with brilliant construction to 各色smart cover 1.iPad 2将拥有一个前置摄像头和一个后置摄像头 上一代iPad根本就没有摄像头,只有一个感光点,调节屏幕亮度用。因此,iPad 2拥有两个摄像头,将非常有利于苹果推广Facetime功能。另外,苹果还必须同三星Galaxy Tab等Android平板竞争,Galaxy Tab今年初上市时就已经装备了双摄像头。 2.iPad 2将拥有更大的扬声器 一篇日本博客的照片显示,iPad 2原型机背部拥有更大的扬声器,这或许意味着iPad 2的声音会更好、更大。 3.与之前的谣言相反的是,iPad 2不拥有SD卡插槽或USB接口。 4.iPad 2将更轻便 尽管有谣言称苹果可能将推出7英寸版iPad,众多博客还是认为iPad 2应该只是更加轻薄——大约比前代更薄。 5.iPad 2将侧面将为锥形,背部为平坦设计,与iPod touch类似。 新设计可能是为了容纳效果更好的扬声器,并减少相机放置的磨损。 6.iPad 2将拥有双核处理器,运行速度更快,图形处理能力更强。 这意味着,iPad 2将在不牺牲电池寿命的情况下运行更快。 7.苹果预计iPad 2在2011年达到4000万销量。 台湾电子时报报道,这一数字意味着,新款iPad可能占据全球PC 70%的市场份额。然而,根据Gartner的统计数据,2011年全球PC出货量预计为4.09亿,也就是说iPad 2的4000万销量占全球PC市场的份额约为10%。 8.iPad 2抗污、抗反光能力更强 台湾电子时报报道,苹果正在研发抗污、抗反光显示屏,以进一步应对来自亚马逊Kindle的竞争。 9.iPad 2三围为:240.8mm*165.8mm*9.4mm. 10.ipad2具有3G功能,可不根据无线网络直接联网。 成都办事处金奖特曲品牌部 2011年9月26日 lifting the plug, drainage should be discharged quickly. Close the mouth immediately after shutting the water flow, water seeping in around the faucet without; check the Flushing apparatus sensitivity and reliability. 2 water debug each of the pump motor in the pumping station through the emergency stop button to stop running tests each drain pump starts and automatically selected alternate. 3 devices in the drainage system drainage systems, pipes and accessories for drainage open, smooth gravity flow, siphon rainwater drainage system, meet the design specification. 5.4.2.2 test all drain water drain water test after installation according to the design requirements. Individual days or as piped irrigation Rainwater of the canopy height must each riser at the top of the rain pipe. Fee for concealed or buried drainage pipe irrigation experiment needs to be done before the hidden, the height shall be not less than the lower ground level of irrigation, water after 15 minutes, and then filled the last 5 minutes, if the liquid level does not drop that is qualified. 5.4.2.3 health apparatus water test all the health apparatus installed must be 24 hour water test. Hold water: toilet high tank filled as required; each kind of wash basin, lavatory, laboratory basin should be filled to overflow water pan, MOP, sink at least deep two-thirds; bath of one-third cylinder deep. Test results to sanitary appliances not leakage is qualified. Project quality management section engineering code for construction and acceptance of quality objectives to meet the national, both of the bidding documents and drawings with brilliant construction to
本文档为【苹果ipad产品介绍】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_682974
暂无简介~
格式:doc
大小:45KB
软件:Word
页数:13
分类:生活休闲
上传时间:2017-09-18
浏览量:55