首页 天津电缆短路或断路应急预案

天津电缆短路或断路应急预案

举报
开通vip

天津电缆短路或断路应急预案天津电缆短路或断路应急预案 目 录 1 基本情况 2 事故类型和危险程度分析 2.1 事故类型 2.2 危险程度分析 3 组织机构和职责 3.1 应急救援组织及职责 3.2 应急救援专业队伍及职责 3.3 应急救援组织机构图 4 预防与预警 4.1 日常巡查 4.2 预警行动 5 信息报告程序 6 应急响应 6.1 响应分级 6.2 响应程序 6.3 应急处置措施 6.4 触电急救 7 应急结束 8 应急物资与装备保障 9 附件 9.1 本单位应急救援组织及专业救援队伍人员信息表 ...

天津电缆短路或断路应急预案
天津电缆短路或断路 应急预案 办公室装修施工应急预案 下载公司关于消防应急预案火灾的应急预案防汛防洪应急预案施工生产安全应急预案 目 录 1 基本情况 2 事故类型和危险程度分析 2.1 事故类型 2.2 危险程度分析 3 组织机构和职责 3.1 应急救援组织及职责 3.2 应急救援专业队伍及职责 3.3 应急救援组织机构图 4 预防与预警 4.1 日常巡查 4.2 预警行动 5 信息 报告 软件系统测试报告下载sgs报告如何下载关于路面塌陷情况报告535n,sgs报告怎么下载竣工报告下载 程序 6 应急响应 6.1 响应分级 6.2 响应程序 6.3 应急处置 措施 《全国民用建筑工程设计技术措施》规划•建筑•景观全国民用建筑工程设计技术措施》规划•建筑•景观软件质量保证措施下载工地伤害及预防措施下载关于贯彻落实的具体措施 6.4 触电急救 7 应急结束 8 应急物资与装备保障 9 附件 9.1 本单位应急救援组织及专业救援队伍人员信息表 9.2 应急装备清单 meters village between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils canteen, and wangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism features village", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XX Meters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn baby, pass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, and XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula village whole village advance, and day care center, major project of early work. Second, develop eco-agriculture construction of the Canyon. Economic development of eco-agricultural construction in an important position, accelerated "8321" works completed caoguo 23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-off society of the industrial base. Third, start a poverty alleviation project. Storming the headquarters was established, well-organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner, the task force entered the village door communication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implementation of projects 电缆短路、断路应急预案 1 基本情况 本公司供电方式采取集中供电方式,供电设备与受电设备之间通过各类电缆相连。其中高压电缆采用交联聚乙烯绝缘电缆,低压动力电缆及低压控制电缆采用聚氯乙烯绝缘电缆,信号电缆采用聚乙烯绝缘电缆。电缆的敷设方式室内采取沿桥架敷设、室外沿电缆沟敷设。由于各种原因导致的电缆短路或断路事件,严重威胁公司电力系统的安全运行。为了有效预防、及时控制和消除电缆短路或断路事故的危害,最大限度地减少电缆火灾事故造成的损失和缩小停电范围,保障变电所、配电电井及主要设备区域的安全运行及生产的连续进行,依据《电气运行规程》、《应急预案编制导则(公司版)》、《中华人民共和国消防法》等管理规程或法律法规制定本预案。 本预案适用于公司内电缆故障引起短路或断路时的应急处理。 2 事故类型和危险程度分析 2.1 事故类型 电缆绝缘性能的降低、超负荷运行、相间短路、接地短路等故障或不正常运行状态均可能引发电缆短路或断路。 2.2 危险程度分析 根据电缆短路或断路事件的性质及事件发生后对系统运行影响的严重性,将电缆短路或断路事件分为一般事件(I级)、较大事件(II级)和重大事件(III级)。 2.2.1 一般事件 单根电缆短路或断路,但对附近电缆不造成影响,且不会造成同电箱内其他开关停止运行; 2.2.2 较大事件 电缆故障短路或断路并影响附近电缆的安全运行; 2.2.3 重大事件 低压或高压电缆故障短路或断路,影响电气系统的运行或造成公司全面停止供电; 3 组织机构及职责 3.1 应急救援组织及职责 ementation of projectscommunication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implthe task force entered the village door organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner,-rd, start a poverty alleviation project. Storming the headquarters was established, welloff society of the industrial base. Thi-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea agricultural construction in an important position, accelerated "8321" works completed caoguo-agriculture construction of the Canyon. Economic development of eco-e whole village advance, and day care center, major project of early work. Second, develop ecovillagand XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula ass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, by, pMeters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn ba llage", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XXres viwangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism featuage between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils canteen, and meters vill2 应急救援组织 组成成员 职责 1、组织制定、完善设备部事故应急预案, 决定预案的启动与终止; 2、指挥、协调现场各应急救援队伍开展救援应急救援现场设备部经理/ 行动,调配和使用应急资源等; 指挥部 电气主管 3、组织部门应急预案的演练; 4、事故得到有效控制后协助公司对事故的调 查与处理,恢复生产 1、指挥应急救援队伍开展应急救援工 作; 现场指挥部负电气主管(节假日或 2、决定事故响应级别是否升级并向公 责人 夜间公司总值班) 司总经理报告; 3、事故的处理情况及时向公司负责人汇报。 3.2 应急救援专业队伍及职责 专业救援组 组成成员 职责 接警与通知:接到事故报告后,判断事 负责人:电气主管/ 故性质,向指挥部报告。 强电领班 通讯联络组 通讯:确保通讯系统完好、畅通,并能 组员:变电室值班人 协助应急处理(对讲机、应急电话、广 员 播报警系统等)。 负责人:设备部安全警戒:建立事故警戒区域,记录进入事 员 故警戒区人员,厂区干道管制。 安全警戒组 组员:设备部办公室人员疏散:负责事故单位界区内人员安 其他人员 全疏散及人员清点。 负责人:电气主管 抢险:第一时间故障解除或抢修 方案 气瓶 现场处置方案 .pdf气瓶 现场处置方案 .doc见习基地管理方案.doc关于群访事件的化解方案建筑工地扬尘治理专项方案下载 确 组员:强电领班、岗认。 抢险救援组 位员工、技术员、变救援:事故现场受害人员的营救,受害 电室值班人员 人员处紧急及时汇报现场指挥部。 3.3 应急救援组织机构图 meters village between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils cant3/12 een, and wangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism features village", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XX Meters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn baby, pass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, and XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula village whole village advance, and day care center, major project of early work. Second, develop eco-agriculture construction of the Canyon. Economic development of eco-agricultural construction in an important position, accelerated "8321" works completed caoguo 23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-off society of the industrial base. Third, start a poverty alleviation project. Storming the headquarters was established, well-organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner, the task force entered the village door communication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implementation of projects 厂处应急 现场指挥部 设备部经理 通讯联络 安全警戒 电气主管/强电领班 设备部安环员 抢险救援 强电领班 限制事故扩大 消防抢险 变电室值班人员 强电领班、员工 4 日常巡视检查预防、数据整理与预警 4.1 日常巡查 1.检测执行人 电气组主管、领班、员工。 2.检测工具 万用表、电流表、测温仪、反光镜等。 3.电缆检查位置 检查位置主要已电缆端子、电缆绝缘保护为主。 3.检测周期及检测时间 检查周期为每日巡检,标注过的电缆为每日两次检查,出现异常情况的电缆增加主管、 领班每日检查。 检查时间为每日早8:40-11:00;14:00-15:00。 4.电缆温度检测位置及方法 ementation of projectscommunication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implthe task force entered the village door organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner,-rd, start a poverty alleviation project. Storming the headquarters was established, welloff society of the industrial base. Thi-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea agricultural construction in an important position, accelerated "8321" works completed caoguo-agriculture construction of the Canyon. Economic development of eco-e whole village advance, and day care center, major project of early work. Second, develop ecovillagand XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula ass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, by, pMeters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn ba llage", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XXres viwangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism featuage between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils canteen, and meters vill4 电缆测温已测温仪为主,位置主要有电箱内三点(上左、上右、中中)、各个电缆端子及电缆端子0.5-1米出电缆,同时用手感觉电缆绝缘保护是否光滑细腻,如无光滑细腻感觉,此电缆可能发生过超温、硬力等异常现象,对此电缆进行标注。 5.检查检测记录及表格 变电室值班记录:变电室值班人员每两小时对各分柜进行电流观察,记录在《变电室运行记录》上,发现超流超温现象(电流10%,温度上升5?)马上汇报,主管、领班安排员工排查此线路。 电箱内留存检查记录:每日巡检时,对每个电箱巡检并把电箱情况记录在《电箱安全检查》中,主管、领班不定时抽查记录,发现未检查或未记录的情况,每次罚款100元。随后每月把检查记录收回分理装订成册。 巡查携带检查记录:《电工巡视维修记录》为电工巡视时随身携带记录,随时记录检查情况(电箱、照明、电气线路、用电设备等不良情况),发现问题马上反馈给领班处理(小问题马上维修;大问题上报、协同决解)。 定期电箱维护:根据《保养 计划 项目进度计划表范例计划下载计划下载计划下载课程教学计划下载 》每季度根据实际情况会编制《配电箱维护》计划,停电后按计划对从变电室至电箱、电缆、用电设备整条线路进行检测。方法如下: 1.使用摇表检测电缆、用电设备阻值是否正常。 2.万用表检查用电设备功率是否与铭牌是否一致,同时进行清洁维护。 3.爬入桥架用手感觉电缆温度、绝缘保护层,随后检查同段桥架内温度相对较高的3根电缆温度。 4.对停电后,连接端子进行紧固,端子头有锈渍的进行除锈打磨或更换。 5.对有需求或有异常的线路进行更换或维修。 每周电量数据记录:每周对变电室所有分闸进行电量统计,记录在《低压出线柜用电量统计》每周于平均使用电量进行对比,以便确定该范围用电量是否超出节能使用要求。如果超出平均电量15%,询问使用部门具体情况并组织出解决方案。 6.统计表格 每月会根据《低压出线柜用电量统计》记录及重要区域所安装电表汇总到《重要区域用电量记录》,同时可以观察到用电量是否超限。如果超限可以根据每日《变电室运行记录》、每周《低压出线柜用电量统计》分析出此线路大体情况(长期用电量增大可以根据情况对该区域进行限流或分流改造;短期超流超限必须查明原因,避免因此而造成其他事故发生)。 meters village between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils cant5/12 een, and wangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism features village", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XX Meters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn baby, pass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, and XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula village whole village advance, and day care center, major project of early work. Second, develop eco-agriculture construction of the Canyon. Economic development of eco-agricultural construction in an important position, accelerated "8321" works completed caoguo 23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-off society of the industrial base. Third, start a poverty alleviation project. Storming the headquarters was established, well-organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner, the task force entered the village door communication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implementation of projects 因馆内环境很多地方无法巡视检查到,现有的检查方法基本上都是日常巡视或者是被动巡视检查,无法做到全面检查,根据以往经验极易发生电缆短路、断路及不明原因起火等事故,如果发生事故损失将不可避免。 变电室值班人员每两小时负责对变电室高低压柜进行巡检,发现异常及时通报区域主管进行妥善处理; 电修岗位每周负责对厂区桥架及电缆进行巡检,发现异常及时通报区域主管进行妥善处理; 各变电所、开关所、马达控制中心均安装有火灾报警仪,可以实时监控各配电室运行情况,当发生火灾等异常情况自动报警; 电仪区域对厂区电缆中间接头进行建档管理,每年6月安排点检,发现异常及时处理。 4.2 预警行动 4.2.1 电缆短路或断路事件发生后,现场人(目击者、单位、个人或火灾报警确认人)或电运中控运行人员立即向当值调度或值长报告; 4.2.2 当值强电领班立即将报警信息报告设备部经理、主管或公司总值班 4.2.3 设备部经理或公司总值班接到报警后,立即成立现场指挥部,发布生产安全事故的应急救援命令。各救援专业小组在第一时间赶赴现场,迅速开展各项应急救援工作。 5 信息报告程序 现场发现者/ 变电室值班人员 ementation of projectscommunication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implthe task force entered the village door organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner,-rd, start a poverty alleviation project. Storming the headquarters was established, welloff society of the industrial base. Thi-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea agricultural construction in an important position, accelerated "8321" works completed caoguo-agriculture construction of the Canyon. Economic development of eco-e whole village advance, and day care center, major project of early work. Second, develop ecovillagand XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula ass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, by, pMeters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn ba llage", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XXres viwangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism featuage between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils canteen, and meters vill6 强电领班/变电室值班人员 301/500 工作日 休息日/夜间 电气主管 公司总值班 25383793/ 25385768 专业救援组 设备部安全员 安全警戒:工作日设备部安环员 设备部经理 节假日公司安全值班 抢险救援:强电领班:/ 6 应急响应 6.1 响应分级 按照电缆短路或断路事件的性质及事件发生后对系统运行影响的严重性,事件分三个级别 危害等级 危害说明 危害控制 meters village between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils cant7/12 een, and wangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism features village", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XX Meters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn baby, pass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, and XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula village whole village advance, and day care center, major project of early work. Second, develop eco-agriculture construction of the Canyon. Economic development of eco-agricultural construction in an important position, accelerated "8321" works completed caoguo 23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-off society of the industrial base. Third, start a poverty alleviation project. Storming the headquarters was established, well-organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner, the task force entered the village door communication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implementation of projects 第一阶段 单根电缆短路短路或断路,但对1、强电组在最短时间内做好处?级 附近电缆不造成影响,且不会造理及恢复工作; 响应级别 成同电箱内其他开关停止运行 2、事后将处理情况报告厂处 1、设备部经理担任现场指挥,各电缆短路故障短路或断路并影响第二阶段 专业组协调处置。 附近电缆的安全运行 2. 事后将处理情况报告公司相?级 关领导。 响应级别 第三阶段 低压或高压电缆故障短路或断1.初期由设备部经理负责现场指 路,影响电气系统的运行或造成?级 挥。 公司全面停止供电 2.现场指挥纳入公司总指挥,由响应级别 公司总指挥负责指挥救援行动。 6.2 响应程序 6.2.1 发生?级响应级别:启动区域现场处置方案,由事故单位所在的区域负责人领导指挥,组织设备抢修,暂不需要启动公司应急预案; 6.2.2 发生?级响应级别:由设备部经理宣布启动公司应急预案,各应急专业小组进入应急状态,按各自职责开展应急救援工作。根据应急处置情况,涉及需要其他部门协助处理的,应启动其他相关应急预案。 6.2.3 发生?级响应级别:本部无法有效控制事故状态时,在应急处理的同时应立即向公司应急指挥中心报告。 6.3 应急处置措施 6.3.1 单根电缆短路短路或断路,但对附近电缆不造成影响; a) 发现者立即向当班领班或主管汇报,当班领班或主管立即通报设备部进行确认; b) 事故区域在故障现场设置警戒区域,禁止无关人员进入故障点8米范围内; c) 事故区域相关人员检查确认为一般事件,拉开故障电缆开关,确认故障电缆电源 开关确已分闸; d) 事故区域负责人向电气主管/强电领班和应急指挥部汇报事故处理情况; e) 事故区域做好善后处理,并将处理结果及时向应急指挥部汇报; 6.3.2 电缆短路故障短路或断路并影响附近电缆的安全运行 a) 发现者立即向当班领班或主管汇报,当班领班或主管立即通报设备部进行确认; b) 设备部在故障现场设置警戒区域,禁止无关人员进入故障点8米范围内; ementation of projectscommunication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implthe task force entered the village door organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner,-rd, start a poverty alleviation project. Storming the headquarters was established, welloff society of the industrial base. Thi-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea agricultural construction in an important position, accelerated "8321" works completed caoguo-agriculture construction of the Canyon. Economic development of eco-e whole village advance, and day care center, major project of early work. Second, develop ecovillagand XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula ass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, by, pMeters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn ba llage", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XXres viwangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism featuage between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils canteen, and meters vill8 c) 设备部通知事故区域相关人员检查确认为较大事件,通知当班领班或主管需停电 设备位号,电气主管/设备部经理通知相关岗位做好应急处理; d) 变电室值班人员拉开故障电缆及附近受影响电缆电源开关,确认故障电缆电源开 关及受影响电缆电源开关确已分闸; e) 事故区域负责人向电气主管/强电领班和应急指挥部汇报事故处理情况; f) 事故区域做好善后处理,并将处理结果及时向应急指挥部汇报; 6.3.3 高压电缆故障短路或断路 a) 发现者立即向当班领班或主管汇报,当班领班或主管立即通报设备部进行确认; b) 设备部在故障现场设置警戒区域,禁止无关人员进入故障点8米范围内; c) 设备部通知事故区域相关人员检查确认为较大事件,通知当班领班或主管需停电 设备位号,调度通知相关岗位做好应急处理; d) 变电室值班人员拉开对应的高压开关,并确认开关确在分闸位置; e) 变电室值班人员检查确认对应的低压进线开关确在分闸位置,否则手动拉开低压 进线开关; f) 变电室值班人员检查确认低压母联开关是否合闸,否则手动合上低压母联开关; g) 应急人员穿绝缘靴、戴绝缘手套,才可对高压区进行简单检查; h) 事故区域负责人向领班或主管和应急指挥部汇报事故处理情况,并将处理结果及 时向应急指挥部汇报; i) 联系供电公司协助解决此项问题,听从供电局指挥; 6.3.4 低压配电柜故障短路或断路 a) 发现者立即向当班领班或主管汇报,当班领班或主管立即通报相设备部进行确认; b) 设备部在故障现场设置警戒区域,禁止无关人员进入故障点8米范围内; c) 设备部及相关人员检查确认为较大事件,通知当班调度对应的电槽做紧急停电处 理; d) 电运人员拉开对应的高压开关,并确认开关确在分闸位置; e) 电运人员拉开对应的直流刀闸,并确认确在分闸位置 f) 应急人员穿绝缘靴、戴绝缘手套,才可进行检查; g) 事故区域负责人向主管/经理和应急指挥部汇报事故处理情况; h) 事故区域做好善后处理,并将处理结果及时向应急指挥部汇报; 6.3.5 例:2#变压器电缆APD-3短路短路或断路 meters village between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils cant9/12 een, and wangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism features village", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XX Meters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn baby, pass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, and XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula village whole village advance, and day care center, major project of early work. Second, develop eco-agriculture construction of the Canyon. Economic development of eco-agricultural construction in an important position, accelerated "8321" works completed caoguo 23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-off society of the industrial base. Third, start a poverty alleviation project. Storming the headquarters was established, well-organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner, the task force entered the village door communication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implementation of projects a) 故障处理 1) 发现者立即向电厂当班领导汇报,当班领导立即要求电运当班人员查看1# 变压器电缆APD-3电压参数(接地相电压显示为接近0V),确认故障电缆, 确认为重大事件,立即向电气主管及设备部汇报; 2) 设备部在故障现场设置警戒区域,禁止无关人员进入故障点8米范围内; 3) 事故区域组织应急人员携带绝缘工具赶到故障点待命; 4) 电气主管下令电气运行人员将电缆APD-3用电切断; 5) 电器主管接到当班值班人员操作汇报后,通知所有抢修人员到位,检点抢 修工具,同时电气组负责人组织应急人员穿绝缘靴、戴绝缘手套,进行检 查,检查完成后向电力直接 及应急指挥部汇报; 6) 抢修人员检点工具完成后,听从指挥到达指定位置,准备检修; 7) 全部检修完成后,根据检修情况确认事故等级,准备相应物料及工具; 8) 根据事故顶级确认维修方案; 1. 单根电缆短路或断路,但对附近电缆不造成影响,且不会造成同电箱内其 他开关停止运行。根据电缆检查情况对事故电缆进行连接或更换(更换电 缆时根据更换电缆的应急预案进行)。 2. 电缆故障短路或断路并影响附近电缆的安全运行时,对存在损伤的电缆进 行全面检查,随时上报现场情况。因此种情况恢复供电的时间较长,要求 技术人员根据情况预估恢复时间也便确认事故影响范围,方便停电区域做 好应急预案,确保人员、动物、公司财产的损失。电缆检查完成后首先对 未起火电缆进行处理及防护,后续根据情况对问题电缆进行连接或更换(更 换电缆时根据更换电缆的应急预案进行)。 3. 因故障电缆造成整段总闸跳闸,在断开故障电缆开关后合闸,确认其他线 路无问题后,恢复各路供电。如发现其他线路也存在故障,因会造成馆内 大面积停电,需马上通知上级领导,由公司总经理确认启动公司停电应急 预案,同时对整段线路进行各分路电缆进行检查、抢修(需外部力量支援)。 9) 在抢修完成后,做好恢复供电准备,同时将处理结果及时向领导及应急指 挥部汇报; b) 送电操作 1) 确认故障电缆已经修复并试验合格、相应的电缆接线已经恢复,工作票已 ementation of projectscommunication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implthe task force entered the village door organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner,-rd, start a poverty alleviation project. Storming the headquarters was established, welloff society of the industrial base. Thi-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea agricultural construction in an important position, accelerated "8321" works completed caoguo-agriculture construction of the Canyon. Economic development of eco-e whole village advance, and day care center, major project of early work. Second, develop ecovillagand XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula ass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, by, pMeters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn ba llage", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XXres viwangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism featuage between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils canteen, and meters vill10 经终结、工作班成员已经撤离至安全地带,接地线已经拆除; 2) 将2#变压器电缆APD-33开关手车推至工作位置,合闸送电; 3) 向领导及应急指挥部汇报操作结束,系统正常; 6.4 触电急救 当事故现场有人发生触电时,应立即切断电源开关,使触电者尽早摆脱电源,并通知医务人员赶赴现场处理,同时将触电者平移至阴凉通风处,根据实际情况采取触电急救措施,并坚持到医务人员到达现场。 7 应急结束 当电缆火灾事故得到控制、故障电缆得到修复、系统恢复正常运行,由设备部经理牵头成立事故调查小组,对事故现场进行勘察、组织事故调查并组织上报工作。 8 应急物资与装备保障 8.1 设备部应急指挥领导小组负责按照实现应急功能需要,建立应急救援队伍,并根据人员的变化做适时调整,确保救援组织的实施。 8.2 各救援小组负责人根据各自的分工做好应急救援物资的准备工作,例如对讲机、绝缘手套、绝缘靴、应急灯等。 9 附件 9.1 本单位应急救援组织及专业救援队伍人员信息表 9.1.1 现场指挥部 序号 部门 姓名 职务 办公电话 手机 1 设备部 王赞 设备部经理 25386358 2 设备部 付长德 设备部电气主管 25383793 3 设备部 韩建卫 强电领班 25383791 4 设备部 邢维东 强电领班 25383791 9.1.2 安全警戒组 序号 部门 姓名 职务 办公电话 手机 1 设备部 张旭 设备部安全员 25385568 9.1.3 应急救援组 meters village between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils cant11/12 een, and wangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism features village", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XX Meters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn baby, pass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, and XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula village whole village advance, and day care center, major project of early work. Second, develop eco-agriculture construction of the Canyon. Economic development of eco-agricultural construction in an important position, accelerated "8321" works completed caoguo 23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-off society of the industrial base. Third, start a poverty alleviation project. Storming the headquarters was established, well-organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner, the task force entered the village door communication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implementation of projects 序号 部门 姓名 职务 办公电话 手机 1 设备部 王国中 电工 25387318 电工 25387318 2 设备部 路来才 电工 25387318 3 设备部 张文龙 电工 25387318 4 设备部 侯雅杰 设备部 25387318 电工5 刘少国 设备部 25387318 电工6 张廷录 电工 25387318 7 设备部 王佳鑫 电工 25387318 8 设备部 刘顺杰 9.2 应急装备清单 序号 装备名称 数量 1 10绝缘手套 2付 2 10绝缘靴 2双 3 10kv验电器 1支 4 成套接地线 2套 ementation of projectscommunication policy, mobilization mass base, making poverty eradication plan, and find out about poverty, assist in the implthe task force entered the village door organized, well arranged, formation of 7 supporting task force launched the poverty file state cards work in a timely manner,-rd, start a poverty alleviation project. Storming the headquarters was established, welloff society of the industrial base. Thi-oil tree planting 8887.8 acres. To cultivate new economic growth points, good farmers ' well-23700 acres planted, bubble 4125 acres planted walnuts, sumac 4000 acres planted, Yun Huang Lian 6040 acres planted, tea agricultural construction in an important position, accelerated "8321" works completed caoguo-agriculture construction of the Canyon. Economic development of eco-e whole village advance, and day care center, major project of early work. Second, develop ecovillagand XX meters village pass village Highway hardening, and ancient Dang village disaster Hou traffic reconstruction, and Bula ass group highway construction project; solid do "a water two dirt" regulation, and wood added Jia village, XING side fumin, by, pMeters village debris flow disaster control, building project; started has victims will LOS, wood child moving, and autumn ba llage", and wangji alone village and Bula village River suspension, and Bula village la Los end of pass group Highway, and XXres viwangji alone finished small teaching floor, and wangji alone finished pupils canteen, and ancient Dang "culture tourism featuage between road hardening, 11 km of pass group Highway, livelihood project; ordered advance XX finished pupils canteen, and meters vill12
本文档为【天津电缆短路或断路应急预案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_977556
暂无简介~
格式:doc
大小:71KB
软件:Word
页数:0
分类:生活休闲
上传时间:2018-11-09
浏览量:19