三阶魔方—花样玩法口诀
三阶魔方花样玩法
首先要明白公示中各个符号的含义哦:
, 其实每个符号都是跟英文单词缩写有关的,比如说,U代
表
关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf
的是
三阶魔方的顶面,而英文单词UP大家并不陌生,符号U正是来
自Up(上)。同理,与顶面相对的是底面,用D表示(Down下),
还有F(Front前面)——正面,B(Back后面)——后面,L(Left
左边)——左面,R(Right右边)——右面。
, 还有一点需要注意的是,U表示顺时针旋转90度,U’ 表示的是
顶面逆时针旋转90度,依次类推,U2表示顺时针旋转180度。 , 另外,运用公式时,首先得选好哪面是正面,选好后,在适用~
最后,祝大家玩得愉快*(^_^)*
1. 六面回字公式
U' D F' B L R' U' D
2. 四色回字公式
B2 L R B L2 B F D U' B F R2 F' L R 3. 对称棋盘公式
L2 R2 F2 B2 U2 D2
4. 循环棋盘公式
D2 F2 U'B2 F2 L2 R2 D R' B F D'U L R D2 U2 F'U2
circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high
5. 六面十字公式
B2 F' L2 R2 D2 B2 F2 L2 R2 U2 F'
6. 四面十字公式
D F2 R2 F2 D' U R2 F2 R2 U'
7. 双色十字公式
U' D F' B L R' U' D L2 R2 F2 B2 U2 D2 8. 三色十字公式
B F' L2 R2 U D'
9. 四色十字公式
U2 R B D B F' L' U' B F' L F L' R D U2 F' R' U2 10. 五彩十字公式
L2 D' F2 D B D L F R' U' R' D' F L2 B F2 L 11. 六面皇后公式
R2 B2 U2 L2 B2 U2 F2 L2 D L' R F L2 F' U' D L 12. 六面五色公式
U B2 L2 B F' U F' D2 L D2 F D R2 F2 R' B' U' R' 13. 六面六色公式
D2 U2 L2 B R2 D' L2 R2 D2 B2 F2 U' R2 B' R2 14. 六面彩条公式
F2 U2 F2 B2 U2 F B
15. 六面三条公式
(U2 L2)3 (U2 R2)3 U D L2 R2
d firolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots fillewith thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot b place ot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to al's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slchanneed before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable ll 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checkinstaerpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, p static measures. 5.1.3.2.6 site the-circuit board by hand or tool, the operator shall take antinstrument cable protection pipe should avoid high.5.1 ioperation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1t from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the heighjunction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center 6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install5.1.4.ric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. e outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, elect2
16. 六面凹字公式
F2 L' R B2 U2 L R' D2
17. 六面凹字公式
U D L2 F2 U D' B2 R2 D2
18. 六面凸字公式
F2 R F2 R'U2 F2 L U2 B2 U2 F'U2 R D' B2 D F'D2 R F
19. 六面工字公式
D2 ML' F2 B2 ML' D2
20. 六面Q字公式
D F2 U' B F' L R' D L2 U' B R2 B' U L2 U' 21. 六面J字公式
D2 L2 D R2 U B2 U2 B R' B' D B2 R' F R2 F' U R'
22. 六面L字公式
L R U D F' B' L R
23. 六面彩E公式
F2 R2 F2 U' R' B2 F L R' U L' R U B U2 F2 D' U'
24. 六面C U公式
D' U B D' L' R F D' B' D' U L
25. 六面T字公式
U2 F2 R2 D U' L2 B2 D U或者B2 D2 L R' D2 B2 L R' 26. 四面Z字公式
( F B R L )3 (U D')2
t exup in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall no needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch es areasures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof meexpanst be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate ers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannon workn, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constructioshould be carefully checked before the process piping and equipment layout, and check the cable trough the practical directioction ble tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Constrube normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument caon should static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take antition pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high(3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protecmber; ore than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify nuceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be m3
27. 四面I字公式
R2 F2 R2 L2 F2 L2
28. 四面L字公式
B F D U L2 D U' B F'
29. 四面O字公式
U R2 L2 U D' F2 B2 D'
30. 四面E字公式
R2 U2 F2 R2 U2 R2 F2 U2 31. 四面V Y公式
D2 R L U2 R2 L2 U2 R L 32. 四面C U公式
R2 F2 B2 L2 U F2 R2 L2 B2 D' 33. C C T V公式一
B2 R2 D2 U2 F2 L R' U2 L' R' 34. C C T V公式二
L2 B2 R2 D2 R2 F2 U2 F2 R2 U2 R2 35. 六面斜线公式
B L2 U2 L2 B' F' U2 R' B F R2 D' L R' D' U R F'
36. 三色斜线公式
R F2 L' D2 F2 L' R2 B' L' B' F' D' U R F' D R' B R'
37. 四面斜线公式
F B L R F B L R F B L R
5.1.4.ric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. e outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electd firolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots fillewith thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot b place ot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to al's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slchanneed before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable ll 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checkinstaerpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, p static measures. 5.1.3.2.6 site the-circuit board by hand or tool, the operator shall take antinstrument cable protection pipe should avoid high.5.1 ioperation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1t from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the heighjunction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center 6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install4
38. 大小魔方公式
U2 L2 F2 U' B2 D R F' R F' R F' D' B2 U' 39. 大中小魔公式
BL'D2LDF'D2FD'B'F'RU2R'U'BU2B'UF (R'D2RB'U2B)2 40. 大中小魔公式
F D2 L2 B D B' F2 U' F U F2 U2 F' L D F' U 41. 六面弓箭公式
R U F2 D'R L'F B'D' F' R F2 R U2 F R2 F'R'U'F'U2 F R 42. 六面双环公式
B R L' D' R2 D R' L B' R2 U B2 U' D B2 R L U2 R' L' B2 D'
43. 六面蛇形公式
B R L' D' R2 D R' L B' R2 U B2 U' D R2 D' 44. 彩带魔方公式
D2 L' U2 FL2 D2 U R2 D L2 B' L2 U L D' R2 U' 45. 六面鱼形公式
L2 D B2 U R2 B2 D L' B2 F'D'U R'D2 R'B2 F'U'F'
tion pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high(3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protecmber; ore than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify nuceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be mt exup in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall no needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch es areasures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof meexpanst be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate ers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannon workn, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, constructioshould be carefully checked before the process piping and equipment layout, and check the cable trough the practical directioction ble tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Constrube normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument caon should static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installati-circuit board by hand or tool, the operator shall take anti5