英语国际音标,以及新旧国际音标对照表
英语国际音标表(48个)
元音(20个)
长元音 /ɑ:/ /?:/ / ?:/ /i:/ /U:/ 短元音 / ?/ /?/ /?/ /?/ /?/ /e/ /æ/
/e?/ /a?/ /??/ 双元音 /??/ /e?/ /??/
/??/ /a?/
辅音(28个)
轻辅音 /p/ / t/ / k/ /f/ /θ/ /s/ 浊辅音 /b/ /d/ /g/ /v/ /ð/ /z/ 轻辅音 /?/ / h/ /ts/ /t?/ /tr/ 浊辅音 /?/ / r/ /dz/ /d?/ /dr/ 鼻音 /m/ /n/ /?/
半元音 / j/ / w/
边音 / ?/
新旧英语国际音标对照表新旧英语国际音标对照表新旧英语国际音标对照表
新 i: ? e æ З: ? Λ u: ? ?:
旧 i: i e æ ?: ? Λ u: u ?:
Vowels ?aIe
新 ? ɑ: eI aI ?I ??
元音 ? ? ? ?
?iε
旧 ? ɑ: ei ai ?i au u?
u ? ?
meet the standard requirements. Post weld heat treatment of pipes after heat treatment, hardness tests should be conducted, hardness test sampling of not less than 10%, hardness 120%,15CrMo hardness of carbon steel pipe shall be less than base metal steel after heat treatment, hardness should not be greater than the parent material of 125%. Rate of pipeline nondestructive testing shall be carried out according to the design requirements, no no design requirements the SH3501-2002 table 10 "percentage of radiographic examination of welded joints and acceptable level", and fixed number not less than the total number of 40% weld inspection. This project has a wall thickness of 32mm 20# steel high pressure tube, x-rays cannot penetrate, the situation may not allow non-destructive testing by γ-ray, used weld backing and two-layer welds before filled by x ray detection method, the other layer by ultrasonic detector method. Should be consistent with existing national standards for radiographic testing of the ... Gas tank used chain for this project promoted the upsidedown construction. Chain reversal installation method shown in the following figure: welders Welders and welding methods to participate in this project should be in accordance with the Ministry of personnel issued by the boilers and pressure vessels welder examination rules for qualification examination, after passing the qualification certificate of welding work. Tank welding manual arc welding, automatic welding. Manual arc welding company has a number of excellent welder, took part in all kinds of large, medium and small storage tank, pressure vessel welding, with rich experience, manual welding characteristics are not subject to location restrictions, welding deformation easy to control. This engineering welding construction of shielded metal arc welding methods.
p b t d k g f v s z
Consonants 无变化 ð m n ? l r h w j ϑ 辅音
? ? t? d? tr dr ts dz
英语音标及字母组合对照
1.元音:
1) [i:] 字母组合:ee ea e ie ei ,eo ey i,
three tree green sheep meet beef see seek eat tea meat leave lead teacher team mean speak clean please
he she me
piece receive ceiling
2) [ I ]发音字母 i y e ui u a
sit picture it is list six mix fix fit pig big build miss
myth many twenty happy dictionary
defect decide delicious
3) [ æ ] 发音字母 a
bag hand and ant happy hat map mad bad black back glad flag shall man
4) [e] 字母组合 ea e a ,ue,u,ie,ai,ei,ay,
head bread pleasure
elephant electric remember sell shell lesson better bed desk hotel yes
many any
meet the standard requirements. Post weld heat treatment of pipes after heat treatment, hardness tests should be conducted, hardness test sampling of not less than 10%, hardness 120%,15CrMo hardness of carbon steel pipe shall be less than base metal steel after heat treatment, hardness should not be greater than the parent material of 125%. Rate of pipeline nondestructive testing shall be carried out according to the design requirements, no no design requirements the SH3501-2002 table 10 "percentage of radiographic examination of welded joints and acceptable level", and fixed number not less than the total number of 40% weld inspection. This project has a wall thickness of 32mm 20# steel high pressure tube, x-rays cannot penetrate, the situation may not allow non-destructive testing by γ-ray, used weld backing and two-layer welds before filled by x ray detection method, the other layer by ultrasonic detector method. Should be consistent with existing national standards for radiographic testing of the ... Gas tank used chain for this project promoted the upsidedown construction. Chain reversal installation method shown in the following figure: welders Welders and welding methods to participate in this project should be in accordance with the Ministry of personnel issued by the boilers and pressure vessels welder examination rules for qualification examination, after passing the qualification certificate of welding work. Tank welding manual arc welding, automatic welding. Manual arc welding company has a number of excellent welder, took part in all kinds of large, medium and small storage tank, pressure vessel welding, with rich experience, manual welding characteristics are not subject to location restrictions, welding deformation easy to control. This engineering welding construction of shielded metal arc welding methods.
5) [ε:] 字母组合ir ur ear er or
girl shirt skirt thirty thirteen third bird turn burn murder nurse turtle Thursday burger
learn earn earth heard
term her nerd serve
work worm work world
6) [ε] 字母组合 er or ou ar o a e u
teacher leader remember player speaker farmer powder doctor actor mayor author tractor
delicious gracious pleasure
familiar collar dollar
together tomorrow today shallop lesson Washington control polite
around account ago elephant manta banana Canada Japan china
men listen
famulus Saturday
7) [a:] 字母组合 ar a
car farm card arm garden
fast class last glass plant aunt calm 8) [ ? ] 发音字母 u o ou oo
up supper lunch fun gun hunt cup bus come mother dose brother love above
trouble rough flourish
blood flood
9) [?: ]字母组合 al or au our ar
meet the standard requirements. Post weld heat treatment of pipes after heat treatment, hardness tests should be conducted, hardness test sampling of not less than 10%, hardness 120%,15CrMo hardness of carbon steel pipe shall be less than base metal steel after heat treatment, hardness should not be greater than the parent material of 125%. Rate of pipeline nondestructive testing shall be carried out according to the design requirements, no no design requirements the SH3501-2002 table 10 "percentage of radiographic examination of welded joints and acceptable level", and fixed number not less than the total number of 40% weld inspection. This project has a wall thickness of 32mm 20# steel high pressure tube, x-rays cannot penetrate, the situation may not allow non-destructive testing by γ-ray, used weld backing and two-layer welds before filled by x ray detection method, the other layer by ultrasonic detector method. Should be consistent with existing national standards for radiographic testing of the ... Gas tank used chain for this project promoted the upsidedown construction. Chain reversal installation method shown in the following figure: welders Welders and welding methods to participate in this project should be in accordance with the Ministry of personnel issued by the boilers and pressure vessels welder examination rules for qualification examination, after passing the qualification certificate of welding work. Tank welding manual arc welding, automatic welding. Manual arc welding company has a number of excellent welder, took part in all kinds of large, medium and small storage tank, pressure vessel welding, with rich experience, manual welding characteristics are not subject to location restrictions, welding deformation easy to control. This engineering welding construction of shielded metal arc welding methods.
small wall talk tall hall ball call walk short more lord horse for forty sport door floor store
author caught autumn
four mourn court bought
warm quarrel quarter
10) [ ? ] ([?])发音字母 o a ou
hot lost lot fox box mop hop loss collar not want wash watch
11) [u:] 字母组合 oo o u
food moon room gloom broom doom goose tooth shoe do two
true truth blue full prude
12) [u] 字母组合 oo ou u o
look good foot book wood
should could
put full bull pull push
woman wolf
13) [ei] 发音字母 a ay ea ai ey
name cake late gate plane April
play say may way
great break
rain paint plain
they grey
14) [ai] 发音字母 i y
bike fine find die nine light night high my try fly eye
meet the standard requirements. Post weld heat treatment of pipes after heat treatment, hardness tests should be conducted, hardness test sampling of not less than 10%, hardness 120%,15CrMo hardness of carbon steel pipe shall be less than base metal steel after heat treatment, hardness should not be greater than the parent material of 125%. Rate of pipeline nondestructive testing shall be carried out according to the design requirements, no no design requirements the SH3501-2002 table 10 "percentage of radiographic examination of welded joints and acceptable level", and fixed number not less than the total number of 40% weld inspection. This project has a wall thickness of 32mm 20# steel high pressure tube, x-rays cannot penetrate, the situation may not allow non-destructive testing by γ-ray, used weld backing and two-layer welds before filled by x ray detection method, the other layer by ultrasonic detector method. Should be consistent with existing national standards for radiographic testing of the ... Gas tank used chain for this project promoted the upsidedown construction. Chain reversal installation method shown in the following figure: welders Welders and welding methods to participate in this project should be in accordance with the Ministry of personnel issued by the boilers and pressure vessels welder examination rules for qualification examination, after passing the qualification certificate of welding work. Tank welding manual arc welding, automatic welding. Manual arc welding company has a number of excellent welder, took part in all kinds of large, medium and small storage tank, pressure vessel welding, with rich experience, manual welding characteristics are not subject to location restrictions, welding deformation easy to control. This engineering welding construction of shielded metal arc welding methods.
15) [au] 字母组合 ou ow
house out flour ground account count sound loud
around mouse
flower down now cow how town 16) [εu] 发音字母 o ow oa
home cold go no phone host ghost know low below grow blow show flow boat coat goal
17) [ ?? ] 字母组合oy oi
boy toy joy
oil soil voice choice
18) [iε] 字母组合 eer ear
beer deer
ear near
here fierce idea
19) [ ?? ] ([e?])字母组合ear air ere
pear bear
chair air fair
there where
care
20) [uε] [au?]字母组合our ower
hour tour
flower shower
meet the standard requirements. Post weld heat treatment of pipes after heat treatment, hardness tests should be conducted, hardness test sampling of not less than 10%, hardness 120%,15CrMo hardness of carbon steel pipe shall be less than base metal steel after heat treatment, hardness should not be greater than the parent material of 125%. Rate of pipeline nondestructive testing shall be carried out according to the design requirements, no no design requirements the SH3501-2002 table 10 "percentage of radiographic examination of welded joints and acceptable level", and fixed number not less than the total number of 40% weld inspection. This project has a wall thickness of 32mm 20# steel high pressure tube, x-rays cannot penetrate, the situation may not allow non-destructive testing by γ-ray, used weld backing and two-layer welds before filled by x ray detection method, the other layer by ultrasonic detector method. Should be consistent with existing national standards for radiographic testing of the ... Gas tank used chain for this project promoted the upsidedown construction. Chain reversal installation method shown in the following figure: welders Welders and welding methods to participate in this project should be in accordance with the Ministry of personnel issued by the boilers and pressure vessels welder examination rules for qualification examination, after passing the qualification certificate of welding work. Tank welding manual arc welding, automatic welding. Manual arc welding company has a number of excellent welder, took part in all kinds of large, medium and small storage tank, pressure vessel welding, with rich experience, manual welding characteristics are not subject to location restrictions, welding deformation easy to control. This engineering welding construction of shielded metal arc welding methods.
本文档为【英语国际音标,以及新旧国际音标对照表】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。