保利贝森公馆133平米
设计
领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计
和
施工
文明施工目标施工进度表下载283施工进度表下载施工现场晴雨表下载施工日志模板免费下载
对比图
保利贝森公馆1 3 3平米设计和施工对比图
【楼盘地址】青羊区青羊大道贝森路36号
【主力户型】二居,187?,三居,137?,三居,140?,
保利贝森公馆的小区环境优美,绿化做的很好,在这里生活很惬意,
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
客厅效果图
高度国际装饰的样板间工地在5栋1单元901,大家都可以去参观哦,
开工仪式筹办的很精彩,大家都很开心,有剪彩,有礼花,有红
酒??????开工大吉,
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
高度国际装饰的样板间工地在5栋1单元901,大家都可以去参观哦,
有邻居们的监督,施工更是透明,有保证
高度国际的
工程
路基工程安全技术交底工程项目施工成本控制工程量增项单年度零星工程技术标正投影法基本原理
是过硬的,先进的德国工艺,门把手都保护起来了的,
做好每一个细节。大家看这工地保护就能感觉出来。
高度国际装饰when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 cdgdgj.com received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
工地的规章
制度
关于办公室下班关闭电源制度矿山事故隐患举报和奖励制度制度下载人事管理制度doc盘点制度下载
规定的很详细,工人不能在施工现场抽烟,住宿,吃
饭。马桶也是统一标准的,严禁脏、乱、差,每周五公司的领导会去
工地视察。
楼梯,门窗,护栏,等等全部都做了保护,
醒目的红色标语也起到了提示的作用,
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
绿色的是防尘地固,做到无尘施工,现在水电差不多改完了,隐蔽工程的用材用料都可以在工地现场看到,跟我们公司展示的是一模一样的。
八年工程质保,您值得拥有(*^__^*) 嘻嘻……,
【工地考察】5栋1单元901
【地址】高新区中航国际交流中心B座16层
【来电】要爸爸,要伞领舅,要舅舅领。
高度国际装饰when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 cdgdgj.com received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter