首页 改—工衣管理办法

改—工衣管理办法

举报
开通vip

改—工衣管理办法改—工衣管理办法 工 衣 管 理 办 法 文件编号:S-T-004 版本 DCC 版 本: 1.0版 制订日期: 2006.5.15 制订单位: 行政部 发 行 章: r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good ...

改—工衣管理办法
改—工衣管理办法 工 衣 管 理 办 法 文件编号:S-T-004 版本 DCC 版 本: 1.0版 制订日期: 2006.5.15 制订单位: 行政部 发 行 章: r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 审 查 会 签 董 总 协 制 管 财 行 业 制 资 工 品 文 事 经 理 会 政 务 造材 程 保 管 代 部 部 部 部 部 部 部 中 理 订 长 理 表 心 本文不得擅自涂改或影印 表单编号:F-D-001-A 文件编号 S-T-004 工 衣 管 理 办 法 总共页次 1 OF 1 文 件 修 订 履 历 版本 修订理由与内容简述 修订页次 修订日期 1. 0 新发行 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 本文不得擅自涂改或影印 表单编号:F-D-002-A r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 文件编号 S-T-00Greatlink (ShenZhen) 4 版 次 1.0版 文件名称 工 衣 管 理 办 法 总共页次 1 OF 4 1、目的: 规范工衣的发放和领用管理,提高公司良好形象,展示员工精神面貌,特制定工衣管制 办法(以下简称本办法) 2、范围: 凡本公司职工皆适用本办法。 3、定义: 3.1 夏天工衣 3.1.1 部门主管、组长级以上以及办公室助理人员,白色体恤 3.1.2 制造部班长、领班,深红色体恤;制造部员工,粉红色体恤;制造部生技人员,蓝 色体恤。 3.1.3 品保部除主管外一律橙色体恤。 3.1.4 仓库工作人员、水电工作人员一律蓝色体恤。 3.1.5 7S小组成员,黄色体恤。 3.1.6 前台人员套装,2套/人。 3.2 冬天工衣 3.2.1部门主管、组长级以上以及办公室助理人员,绿色外套。 3.2.2 制造部班长、领班,深红色外套;制造部员工,红色外套;制造部生技人员,蓝色 外套。 3.2.3 品保部除主管外一律橙色外套。 3.2.4 仓库工作人员、水电工作人员一律蓝色外套。 3.2.5 7S小组成员,黄色外套。 3.2.6 前台人员,统一外套。(裤子自己买,但要统一黑色的西裤) 4、权责: 4.1总务:负责请购/订购、收货/验收、发放、保管。 4.2 宿舍管理员:负责工衣的回收。 4.3.财会:负责请购/订购单,收货/验收单、送货单核对账款,并办理付款相关事宜。 4.4 清潔工:負責回收工衣的清洗與整理。 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 本文不得擅自涂改或影印 表单编号:F-D-003-A r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 文件编号 S-T-004 Greatlink (ShenZhen) 版 次 1.0版 文件名称 工 衣 管 理 办 法 总共页次 2 OF 4 5、 流程 快递问题件怎么处理流程河南自建厂房流程下载关于规范招聘需求审批流程制作流程表下载邮件下载流程设计 图: 无 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 本文不得擅自涂改或影印 表单编号:F-D-003-A r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 文件编号 S-T-004 Greatlink (ShenZhen) 版 次 1.0版 文件名称 工 衣 管 理 办 法 总共页次 3 OF 4 6)内容: 6.1 工衣制作 6.1.1总务统筹办理工衣请购/订购、收货/验收事宜。 6.2 工衣的发放 6.2.1 新入职员工工衣的发放 6.2.1.1 新入职员工于教育培训课成的第三天领取工衣,由教育培训老师统一到总务 处领取工衣,再分发到每一位员工手上。每人两件,原则上一新一旧。 6.2.1.2 拿到工衣后,当时试穿,如有尺寸不符,即时换取尺寸合适的,逾期不予更 換。 6.2.2 因岗位调动,需换工衣的,需将原来的工衣交回到总务换取新工作岗位的工衣。 6.2.3 正常折旧、损耗而报废的需要重新领取工衣的,需要需将原来的工衣交回到总务, 办理相关工衣领取手续,换取新的工衣。 6.2.4 非正常折旧损耗、丢失的需要重新领取工衣的,无需将旧工衣交回,可直接到总 务办理相关工衣领取手续。 6.2.5 其余情况一律不办理换服事宜。 6.3 工衣报废 6.3.1 夏装: 6.3.1.1职员、办公室、助理,班长等非体力消耗大的岗位:报废年限2年。 6.3.1.2仓库、生技和水电工体力劳动强的岗位:报废年限1年。 6.3.2 冬装: 6.3.2.1 职员、办公室、助理,班长等非体力消耗大的岗位:报废年限4年。 6.3.2.2 仓库、生技和水电工体力劳动强的岗位:报废年限2年。 6.4工衣扣款 6.4.1 “6.2.1”情况:领取的工衣无论新旧均须在当月薪资扣除相应费用充当押金。 6.4.2 “6.2.4”情况:须在当月薪资扣除相应费用。 6.4.3 “6.2.2”、“6.2.3”、“6.2.6”以及 “6.3”情况:无须扣款。 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 本文不得擅自涂改或影印 表单编号:F-D-003-A r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 文件编号 S-T-00Greatlink (ShenZhen) 4 版 次 1.0版 文件名称 工 衣 管 理 办 法 总共页次 4 OF 4 6.5 工衣回收保管及返还押金 6.5.1 离职时须将工衣交还至宿舍管理员处,宿舍管理员依据工衣的新旧程度以及损坏的 原因等给予办理押金返还手续;属个人原因损坏导致不能回收再利用的,不能给予 办理押金返还;如无人为损坏,宿舍管理员需作好记录通知会计在其离职当月退还 押金。 6.5.2 回收的工衣,公司清洁工负责清洗、整理,总务统一收回并归类摆放、保管。 6.6 工衣报废 凡属正常折旧损耗和非个人原因损坏的,均由总务统一进行报废处理。 6.7 工衣的穿着规定 凡本公司职工,上班时间以及加班时间(包括星期六、日)均须穿着。 7、奖惩: 相关权责人员,如未依程序 要求 对教师党员的评价套管和固井爆破片与爆破装置仓库管理基本要求三甲医院都需要复审吗 如期完成工作,造成公司损失或严重影响其它部门工作, 将依獎懲辦法进行处置。 8、参考文件: 无 9、表单附件: 无 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 本文不得擅自涂改或影印 表单编号:F-D-003-A r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
本文档为【改—工衣管理办法】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_079973
暂无简介~
格式:doc
大小:77KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-10-23
浏览量:10