首页 票到是暂估冲回

票到是暂估冲回

举报
开通vip

票到是暂估冲回票到是暂估冲回 暂估入库 票到冲回 具体金蝶K3软件中的设置来说,存货核算,金蝶把与暂估相关的核算参为设置为两个: 一是“暂估差异的生成方式”,有单到回冲和单到补差两个。 二是“暂估冲回凭证的生成方式”,有单到回冲和月初一次冲回两个。 上述参数的设置表明,金蝶在外购入库单的暂估处理上,关于单据冲回已经取消了月初回冲的方式,但有保留了会计凭证月初一次冲回,使之更符合计算机业务下的存货核算处理。 五、暂估核算与外购入库核算的会计分录,假定是单到冲回冲: (一)、暂估核算 1、暂估入库(基于暂估外购入库单...

票到是暂估冲回
票到是暂估冲回 暂估入库 票到冲回 具体金蝶K3软件中的设置来说,存货核算,金蝶把与暂估相关的核算参为设置为两个: 一是“暂估差异的生成方式”,有单到回冲和单到补差两个。 二是“暂估冲回凭证的生成方式”,有单到回冲和月初一次冲回两个。 上述参数的设置 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf 明,金蝶在外购入库单的暂估处理上,关于单据冲回已经取消了月初回冲的方式,但有保留了会计凭证月初一次冲回,使之更符合计算机业务下的存货核算处理。 五、暂估核算与外购入库核算的会计分录,假定是单到冲回冲: (一)、暂估核算 1、暂估入库(基于暂估外购入库单) 借:材料 贷:材料采购(暂估) 月底,确认暂估金额(基于暂估外购入库单) 借:材料采购 贷:应付账款--暂估 2、次月收到发票,先冲回(基于暂估外购入库单) the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note 借:材料采购(红字) 贷:应付账款--暂估(红字) 次月收到发票,结算入账(基于已结算的外购入库单) 借:材料 贷:材料采购(结算) 3、次月收到发票,结算入账(基于已结算的采购发票) 借:材料采购 税金 贷:应付账款--供应商 当然,实务中,对于暂估,有的企业可能不会通过材料采购科目,而是直接挂应付账款-暂估科目,那么分录应为 1、暂估入库(基于暂估外购入库单) 借:材料 贷:应付账款--暂估 2、次月收到发票,先冲回(基于暂估外购入库单) 借:材料 贷:应付账款--暂估(红字) the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note 次月收到发票,结算入账(基于已结算的外购入库单) 借:材料 贷:材料采购(结算) 3、次月收到发票,结算入账(基于已结算的采购发票) 借:材料采购 税金 贷:应付账款--供应商 (二)、当月,非暂估外购入库核算 1、外购入库及暂估入库(基于非暂估外购入库单) 借:材料 贷:材料采购(结算) 2、当月收到发票,结算入账(基于已结算的采购发票) 借:材料采购 税金 贷:应付账款--供应商the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note
本文档为【票到是暂估冲回】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_841159
暂无简介~
格式:doc
大小:78KB
软件:Word
页数:9
分类:生活休闲
上传时间:2017-11-15
浏览量:59