首页 个人简历及自荐信

个人简历及自荐信

举报
开通vip

个人简历及自荐信个人简历及自荐信 supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition...

个人简历及自荐信
个人简历及自荐信 supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded 个人简历 姓 名 性 别 男 个 民 族 汉 出生年月 籍 贯 皖宿州市萧县 政治面貌 入党积极分子 人 毕 业 学 校 安徽国防科技职业技术学院 基 学 历 大 专 专 业 电气自动化101 本 联系地址 安徽国防科技学院 邮 编 237011 联系电话 手机:XXXX 信 E-mail xxxxxQQ.com QQ Xxxxx 息 家 庭 Xxxxxx。 所在地 求职 单片机开发、plc与电气相关的工作等。 意向 教育 2010. 9 - 2013. 6 安徽国防科技职业技术学院 电气自动化 背景 所获 在全国大学生电子 设计 领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计 竞赛安徽赛区暨“微师”杯安徽省第六届大学生设计竞赛证书 中获二等奖、电工高级证 、计算机一二级证书、电工上岗证等。 1.2010-2011参加青年志愿者协会小组成员。 校内职 2.2011-2012担任电气自动化101班的宣传委员。任职青年志愿者期间曾多次参务 及 与活动:1.养老院照顾老人,2.残疾人学校3.社区做义工4.做兼职(发传单)等. 经验 supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded 掌握电子 电路 模拟电路李宁答案12数字电路仿真实验电路与电子学第1章单片机复位电路图组合逻辑电路课后答案 的基本理论和实验技术,具备分析和设计电子设备的基本能力,熟基本 练掌握C语言,掌握8051系列单片机C开发和汇编开发。 技能 会使用的软件: Multisim 、Protel99 SE和PCB版设计 、电气和Auto CAD设计 、VC和VB 等基本的办公软件的处理(Word 、Excel、Power point)。 高等数学、英语、计算机基础应用教程、电路分析和电工基础、机械制图、大学生就业指导教程、毛泽东思想和中国特色社会主义理论体系概论、电子技术基础、电机与电气控制技术、组态软件控制技术、机械 工程 路基工程安全技术交底工程项目施工成本控制工程量增项单年度零星工程技术标正投影法基本原理 基础、现在企业管理概论、Protel99 主要 SE和PCB版设计教程、电力电子技术、C语言、PLC编程及应用、电子CAD、工厂供电、课程 新编市场营销、自动检测技术与转换技术、单片机技术、数控技术、自动化控制原理与系统、电子设计自动化(EDA)技术、数字信号处理(DSP)技术、微机原理等课程,单片机原理及应用,传感器技术与工程应用。 优秀 专业 水平 个人 爱好 计算机、旅行、读书、打篮球、羽毛球、登山。 本人性格开朗、稳重、有活力,待人热情、真诚。工作认真负责,积极主动,喜欢探索,能吃苦耐劳。有较强的组织能力、实际动手能力和团体协作精神,能迅速的适应各种环境,并融合其中。 在电子技术、设计开发电子产品方面有较强的基础,熟练掌握protel、组态、PLC编程 等常用专业软件,单片机和微机控制技术方面有较好的功自我评底。熟悉51系列单片机、微机原理与接口技术,并熟练掌握计算机的一般价 操作,以及各种办公应用软件的使用。 在英语方面具备一定的听、说、读、写能力,熟悉自动化专业英语,具备一定的专业翻译能力。 尊敬的领导: 您好~ 器必试而先知其利钝,马必骑而后知其良驽supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded 感谢您在百忙之中,阅读我的自荐信。我是安徽国防科技职业技术学院2013应届大学毕业生,专业是电气自动化。明年7月我将顺利毕业。近期获知贵公司正在招聘人才,我自信我在大学的学习情况会有助于我来应聘这些职位。 我有很好的计算机知识和应用能力。对单片机技术和计算机控制技术非常了解,成功学会炉温巡回检测系统,我还长期关注工控网站,了解工控方面的最新动态。在电子方面,我曾做过电子设计大赛,这虽然只是个小型的自动控制系统,但这锻炼了我的电子设计能力,加深了我对自动控制原理知识的理解。我能熟练的进行Windows 98/NT/2000/XP操作,并能使用C, 汇编等语言进行编程。另外我还能运用 OFFICE, MATLAB,AUTOCAD,PROTEL等软件进行相关工作。 我特别喜爱集体项目的体育运动,这不仅锻炼了我的身体,更重要的是我从中深刻的理解了团队精神的内涵。我深知从事自动控制工作的人员尤其应该具备团队精神,因为这些工作需要一个团队才能很好的完成,可以说是否具有团队精神将决定到一件工作能否顺利完成,所以这对贵公司的发展也是非常有利的~ 在大学期间我学到的不仅仅是知识,最重要的是我学到了好的学习方法。在大学期间学到的知识还远远不能满足工作中的需要,所以学习方法也就显得非常重要,这能帮助我更快地融入到公司中去,来为公司服务~ 在大学中,我积极参加各种社团活动和社会实践活动。这些活动丰富了我的阅历,也增强了我的社会交往能力和对新环境的适应能力。在思想政治方面,我也 要求 对教师党员的评价套管和固井爆破片与爆破装置仓库管理基本要求三甲医院都需要复审吗 上进,积极靠近党组织,关注国家大supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded 事。 由于我是大学的应届毕业生,所以在实践和工作经验方面还有所欠缺,我会在这方面努力完善自我,希望贵公司能给我这个机会,我会把我的满腔的热情投入到工作中来回报公司对我的知遇之恩~ 我非常希望能加盟贵公司,发挥我的潜力,和公司共同进步~真诚的期待着和您的再次见面,我将感到万分荣幸~ 最后: 祝您健康,快乐~ 祝贵公司飞黄腾达~ 此 致 敬 礼 自荐人:xxx 时 间: 2012年3月25日 附 件: 器必试而先知其利钝,马必骑而后知其良驽supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded 器必试而先知其利钝,马必骑而后知其良驽supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking ... Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage ... Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together ... Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded
本文档为【个人简历及自荐信】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_105949
暂无简介~
格式:doc
大小:79KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-10-20
浏览量:8