SPECIFICATIONS FOR SOLAR POWERED - Houston:太阳能规格-休斯敦
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
Section 16712
SOLAR POWERED SCHOOL ZONE
FIELD EQUIPMENT
PART 1 GENERAL
1.01 SECTION INCLUDES
The purpose of this specification is to provide details of Solar School Zone Flashing Beacon Field Equipment for new installations and replacement parts for existing installations. This cabinet will be designed to protect internal equipment from rain, dust, vandalism and other conditions found in harsh environments.
Field Equipment Includes: cabinets, battery chargers, batteries, solar panels, flashers, and other incidentals required for Solar Powered School Zone Field Equipment.
1.02 PRODUCTS INSTALLED BUT NOT FURNISHED
A. Paging System. Unless otherwise specified in the bid items, the City of
Houston will furnish pager equipment for installation in the School Zone
Cabinet by the Contractor. Contractor shall arrange for pick up of pager
equipment by contacting the City of Houston Representative at 2200
Patterson, Houston, Texas 77008 713/803-3012, in writing, a minimum of
14 days in advance of need.
B. Signs. School Zone Beacon signs shall be furnished for installation by
the Contractor. All School Zone signs shall remain covered until the
installation is inspected and accepted by the City.
1.03 UNIT PRICES
A. Measurement
Solar Powered School Zone Equipment shall be measured as described
as follows:
1. SOLAR FLASHING BEACON ASSEMBLY, COMPLETE, IN
PLACE -- This Item will be measured on the basis of EACH
assembly complete in place, tested, and accepted. This item shall
include one pole with cap and base, one cabinet assembly, two
beacons, solar panel, two batteries, battery charger, flasher, and
terminal strips, and all conductors, and incidentals necessary to
provide a complete functional Solar Flashing Beacon assembly.
2. SOLAR FLASHING BEACON, ASSEMBLY, COMPLETE, PARTS--
This item shall include one pole with cap and base, one cabinet
16712-1
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
assembly, two beacons, solar panel, two batteries, battery charger,
flasher, and terminal strips. This item will be measured on the
basis of EACH complete assembly furnished and accepted.
3. FLASHING BEACON CABINET ASSEMBLY -- will be measured as
EACH unit furnished and accepted.
4. AUTOMATIC BATTERY CHARGER -- will be measured as EACH
unit furnished and accepted.
5. BATTERIES, 12 VDC, FURNISHED -- will be measured as EACH
unit furnished and accepted.
6. SOLAR PANEL ARRAY, FURNISHED -- will be measured as
EACH unit furnished and accepted.
7. SIGNAL BEACONS, FURNISHED -- will be measured as each
PAIR of beacons furnished.
8. PAGING EQUIPMENT -- Each Paging Unit installed under this
contract shall be measured as each unit installed, tested, and
accepted by the City of Houston.
9. SOLAR FLASHING BEACON ASSEMBLY, WITH TIME CLOCK,
COMPLETE, IN PLACE -- This Item will be measured on the basis
of EACH assembly complete in place, tested, and accepted. This
item shall include one pole with cap and base, one cabinet
assembly, one programmable flashing beacon time-based control
unit, two beacons, solar panel, two batteries, battery charger,
flasher, and terminal strips, and all conductors, and incidentals
necessary to provide a complete functional Solar Flashing Beacon
assembly.
B. Payment The work performed and materials furnished shall be measured
as indicated under “Measurement” and will be paid for at the unit price bid
for each item, as specified in the work order. This price shall be full
compensation for excavating, backfilling, for constructing, furnishing,
installing, and testing Solar Powered School Zone Equipment. This price
shall also be full compensation for; concrete and reinforcing steel;
electrical conductors, connections, grounding rods, galvanized pipe,
fittings, pole caps, pole bases, straps, foundations, anchor bolts, anchor
plates (when required) and any other incidentals necessary to complete
the work.
PART 2 PRODUCTS
2.01 MATERIALS
A. CABINET COMPONENTS
1. General: The cabinet door shall be constructed from 5052H32-
sheet alloy and shall have a thickness of .125 inch. There shall be
no vertical seams in the cabinet shell. All External welds shall be
16712-2
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
made using the Heliarc method, whereas the wire welding method
shall make internal welds. All welds shall be neatly formed and
free from cracks, blowholes and other irregularities. The nominal
outside dimensions shall be 26 inch (h) x 15.25 inch (w) x 15.75 inch
(d). There shall also be a lip over-hang cross the top of the cabinet
covering the top of the door to help in preventing moisture from
getting into the cabinet.
2. The cabinet door opening shall be double flanged around all sides to
form a uniform surface. This is to assure maxim contact with the
door gasketing material.
3. All inside and outside edges of the cabinet shall be free of burrs. 4. All single position door restraint shall be provided to hold the door
open at a maximum 90-degree angle. This is to prevent door
movement in wind conditions.
5. Four (8) louvered vents (4 per side) shall be provided for adequate
ventilation of internal components.
6. DOOR AND HARDWARE
a. The Door will be a minimum of 80% of the front surface area
and shall be hinged on the right side when facing the cabinet.
b. The door shall be furnished with a gasket ?” x 2” closed celled
neoprene that shall form a weather tight seal between the
cabinet flange and the door. A 3/8” x 5/8” retainer shall be used
to hold gasket in place.
c. The door gasketing shall be sprayed with silicone lubricant so
that it does not adhere to the cabinet body-sealing surface.
d. The hinge shall be continuous and shall fasten to the cabinet
and door by ?-20 carriage bolts, washers an nylok nuts. The
hinge will be made of .90 inch thick stainless steel and shall
have a .25 inch diameter stainless steel hinge pin.
7. The Latching Mechanism shall be a three-point draw type and
shall have the following characteristics:
a. The center catch and cam shall be fabricated from .1875 inch
thick steel and zinc plated.
b. The latching rods shall not make direct contact with the inside of
the cabinet surface, rather this mechanical interface shall be
made by a nylon rollers on each of the latching rod ends.
c. The lock shall be a Corbin #2 lock. Two keys will be furnished
with each lock.
d. On the front side of the door a cover shall be provided over the
key slot to prevent debris from getting into the lock. This device
shall be attached so that it can provide easy access for
unlocking the cabinet.
16712-3
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
e. The latching handle shall have a provision for padlocking in the
closed position. The padlocking position shall be at the extreme
end of the latching handle to preclude the use of pipe by
vandals to force the locking mechanism open.
8. An Operating Handle shall be furnished an shall have the
following characteristics:
a. The handle will be stainless steel with a .750 inch diameter
shank
b. The latching handle shall have a provision for padlocking in the
closed position. The padlocking position shall be in the bottom
middle of the latching handle to preclude the use of pipe by
vandals to force the locking mechanism open.
c. There shall be no exposed hardware of any type mounting the
latching handle to the door.
d. The handle shall have a lock hasp to allow the securing of the
cabinet with a padlock.
9. CABINET LAYOUT
a. Top Shelf: (Top Shelf shall be removable for easy access to
batteries on the bottom). The shelf shall have predrilled holes
to attach the control panel these holes will be ? inch in diameter
and shall be centered 7 inches apart 3 inches from the front of
the shelf. The top shelf shall have a minimum depth of 9 inches
and shall span the entire width of the cabinet. In the back
center of the top shelf a half moon shape hole with a diameter of
2 inches shall be in place for ease of bringing cables up to the
controller panel. The front lip of the shelf shall be turned up a
minimum of ? inch and shall be free from sharp edges and
burrs. In addition ? x ? inch bolts with wing nut shall be
supplied for attaching control panel to shelf. The top shelf shall
be removable but made rigidly mounted with the use of simple
tools.
b. The cabinet shall be provided with a battery shelf fabricated
from 5052H32 aluminum having a thickness of .125 inch. The
shelf shall be welded into the cabinet for maximum rigidity. A ?
inch of Styrofoam shall be supplied to cover the bottom, sides
and back of the cabinet where the batteries will sit.
10. Cabinet Finish: Unless otherwise specified, the outside surface of the cabinet shall have a smooth, uniform, polish aluminum finish.
16712-4
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
B. SOLAR PANEL
1. The Photovoltaic Module shall provide 12 VDC and be capable of
recharging the system to full capacity, after 6 hours of continuous
operation, in three (3) hours +/- .5 hours during optimum sun
conditions in December. The minimum acceptable wattage output
of the solar panel will be 100 watts. Solar Array sizing calculations
and the parameters used shall be required. Each solar cell shall be
bypass diode protected to prevent power loss if a module is
temporarily shaded. The crystalline silicon solar module shall
consist of cells that are permanently encapsulated between a
tempered glass cover and layers of ethylene vinyl acetate (EVA)
pottant with a polyvinyl fluoride (PVF) and aluminum foil back sheet
to provide a moisture free environment. Units without foil back
sheets must have Underwriter Laboratory (UL) approval. The
module frame shall be made from extruded aluminum alloy and
adequately sized to attach the desired number and size of solar
panels. The mounting bracket shall use tamper proof hardware to
secure the PV module to the frame. An ultraviolet (UV) resistant,
weatherproof junction box providing wire termination for up to #8
AWG wiring shall be provided with the PV module.
C. BATTERY FOR SOLAR POWERED FLASHING BEACONS
1. The Battery (s) shall have a nominal voltage of 12 VDC. The
battery (s) shall be sized to allow four (4) days of autonomy and
provide sufficient power to support remote support remote
communications at an increased power consumption rate of 1
ampere hour per day. The battery (s) shall conform to the following
criteria.
Operating temperature range:
1. Discharge: -26 degrees F to + 140 degrees F.
2. Charge: -4 degrees F to +122 degrees F.
Vents: Pressure relief vents permanently attached.
Sealed Construction: Will not spill or leak.
Flag Terminals: Hold clearances for ?” bolt.
2. Battery (s) shall be housed in the battery cabinet specified in the
above specification. The battery (s) shall carry a prorated warranty
for a minimum of five (5) years.
3. Programmable Control Unit – Programmable time-based control
units, when required as listed in the bid items, shall be RTC Model
CPR2100 Controller, or equal.
16712-5
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
D. BATTERY CHARGER
1. The Charging Unit shall be 100% solid state and be designed for
use as a battery charger in photovoltaic (solar) energy systems.
The charger shall be mounted on the control panel.
a. The charger shall supply maximum solar panel current to the
battery until battery is fully charged (trickle charge will not be
accepted). Battery voltage will be used to determine when
charging is to resume. The resumption threshold shall
compensate for temperature. The charge current must be
tested at least one (1) time per hour.
b. The charger shall supply a charging current of up to 10 Amps
DC to the batteries.
c. The charger shall be a modular design and shall be easily
replaced with the use of simple tools. There shall be no
terminal strip connections on the charging unit it must be a plug
in design. Any meters being used shall be housed in the
charging unit.
d. Metering devices used shall be for checking the battery voltage
and solar panel input voltage . One meter built into the
charging unit will be used for both operations, an external
switching device shall be used to check both measurements.
e. No terminal strip connections are to be on the front of the
control panel, all connections will be made on the back of the
control panel.
f. Charger shall incorporate a low voltage disconnect that shall
prevent battery damage due to extreme discharge.
E. FLASHING UNIT
1. The Flashing Unit shall be a modular design with a plug being
utilized for connecting to the external flashing outputs. The external
outputs shall be made on the back of the control panel. The flasher
shall be easily replaced with the use of simple tools.
a. The flasher shall be a 12 volt DC charger and shall operate in a
range +/ -volts.
b. The flasher shall have a minimum 2 circuits and shall be rated
for a minimum of 50 watts per circuit.
c. The operating temperature range shall be from -20 C to + 75 C.
d. The flasher shall be capable of working both Halogen or LED
bulbs.
16712-6
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
e. The physical size of the flasher unit shall be no larger than 5.50”
(L) x 3” (W) x 2” (D).
f. The housing shall be a minimum 18 Ga. Steel.
g. The flasher shall have a programmable flash rate from 50-70
flashes per minute.
F. SIGNAL BEACONS
1. The School Zone Beacon Assembly shall operate with two (2)
signal beacons. The beacons shall flash alternately (bouncing ball
type). The beacons (signal heads, reflectors, amber lenses, and
lamps) and mounting hardware shall be supplied as part of
this bid.
2. All Flashing Beacons shall be 12’ polycarbonate amber lens with
tunnel visor hood and use ban on mounting or approved equal.
3. Lamps shall be 12VDC, 35-watt halogen with a minimum life of
2,000 hours continuous duty and mounted at the appropriate focal
point to provide the maximum intensity for the 12” signal head.
PART 3 EXECUTION
3.01 CONSTRUCTION
A. CABINET MOUNTING
1. The cabinet shall be arranged for side of pole mounting. Two sets
of holes shall be predrilled to accommodate two Pelco SE 1100
mounting brackets. The top set shall accommodate the wire inlet to
the cabinet. These mounting brackets shall be supplied as part of
the complete cabinet package.
B. CONTROL PANEL
1. The control panel shall be 12 inches high by 14 inches wide and
have a 4 inch lip at the bottom for the purpose of fastening to the
upper shelf. The panel will set up for the charging unit and flashing
unit to mount on the panel, also mounted on the panel will be the
paging unit.
16712-7
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
C. Solar Panel Mounting Hardware. The photovoltaic module mounting
assembly shall be constructed of galvanized steel (ASTM A-153 Class A)
or aluminum, of adequate design and strength to provide a means of
securely attaching the PV module frame to a pole at a permanent angle of
45 to 50 degrees. The pole mounting hardware shall accommodate a
steel 4 ?” pole. The bracket at an inscribed angular position about the
pole. Mounting Hardware may mount on the side of the pole or on the top
of the pole as long as the bracket is of adequate strength to withstand the
weight and wind stresses.
D. PHYSICAL AND ELECTRICAL INTERFACE
1. A Physical and Electrical Interface needs to be maintained for
the connection of the pager unit. This interface will need to be a
terminal strip on the rear of the control panel. This terminal strip
will be where the harness will hook up for the pager unit. The
terminal Strip will need to be clearly labeled DC+,DC-, Earth
Ground, Relay N/O, Relay Common.
2. A Physical and Electrical Interface will have to be maintained
between the solar panel, batteries, and signals, both 9.1.1 and
9.1.2 can be utilized on (1) terminal block to save space. All
labeling shall be silk-screened.
3.02 TESTING
A. Solar Powered School Zone Beacons Assemblies shall meet or
exceed all applicable Texas Manual on Uniform Traffic Control Devices
and /or Institute Transportation Engineers standards and these
specifications. In addition to testing of pre-shipment samples, complete
testing of school zone beacon assemblies may be required at any time
prior to acceptance ITE specified signal lamp intensity shall be
maintained
3.03 TRAINING
Training requirements are listed below. The City shall furnish the training classroom and the Project Manager shall schedule the training sessions.
A. Assembly. One (8) hour training class on field assembly training shall be
provided as Requested by the city Project Manager, for the City’s
installation contractors and City of Houston’s Department of Public Works
and Engineering Traffic Management and Maintenance Division
personnel. The instructional training shall be for up to twenty (20)
Persons at the request of the Project Manager.
16712-8
09/02/04
CITY OF HOUSTON SOLAR POWERED SCHOOL ZONE
STANDARD SPECIFICATION FIELD EQUIPMENT
B. Maintenance. One training class consisting of eight (8) hours of
Maintenance training shall be provided for up to twenty (20) persons, as
requested by the city Project Manager.
C. Paging Equipment Installation. The Contractor shall be required to
attend six(6) hours Training, furnished by City Staff or the City’s Vendor
on the proper Installation and Maintenance of the City’s School Zone
Paging System Field Equipment. The training will be scheduled by the
Project Manager and all field personnel involved in the installation of
school zone paging equipment, are required to attend. Make-up training
will be paid for by the Contractor.
3.04 CERTIFICATION
A. Certification. A Vendor Representative shall provide to the City’s Project
Manager in writing that the City’s Installation Contractors has been trained
to successfully assemble, program and operate the beacon assemblies in
accordance with manufacturer’s specifications and operating manual.
3.05 DOCUMENTATION
A. Each Solar Powered School Zone Assembly both complete and as parts,
shall be provided with the following documentation:
1. Complete accurate schematic diagrams
2. Complete parts list including names and part numbers for vendors,
for parts not identified by universal numbers.
3. Operating and Maintenance Manual including simple programming
instructions and a programming guide.
3.06 WARRANTY All equipment, except batteries, shall be warranted free from
defects in Material and workmanship for three (3) years from date delivered to
the City of Houston warehouse. Batteries shall be warranted as specified in the
specifications.
END OF SECTION
16712-9
09/02/04
本文档为【SPECIFICATIONS FOR SOLAR POWERED - Houston:太阳能规格-休斯敦】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。