首页 中原海外施工队伍的现场总结

中原海外施工队伍的现场总结

举报
开通vip

中原海外施工队伍的现场总结钻井(Drilling) 钻井(Drilling) 1.​ Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业。 2.​ Prepare bell nipple. 准备‘喇叭口’。 3.​ Make up 2 joints of drill pipe. 接两根钻杆。 4.​ Break out this connection. 卸开该接头。 5.​ Run hole opener to sea bed. ...

中原海外施工队伍的现场总结
钻井(Drilling) 钻井(Drilling) 1.​ Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业。 2.​ Prepare bell nipple. 准备‘喇叭口’。 3.​ Make up 2 joints of drill pipe. 接两根钻杆。 4.​ Break out this connection. 卸开该接头。 5.​ Run hole opener to sea bed. 下扩眼器到海底。 6.​ Mix gel fluid for drilling conductor hole. 为钻导管配制高粘度泥浆。 7.​ Make up bottom hole assembly (BHA). 组合下部钻具。 8.​ Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车方碰装置。 9.​ Number stands on trip out and in. 起下钻给立柱编号。 10.​ Pick up BHA and run to seafloor. 将下部钻具下到海底。 11.​ Pick up stands. 接立柱。 12.​ Don’t drill faster than 15 minutes for 1 stand. 钻进速度别超过15分钟1 个立柱。 13.​ Drop TOTCO. 投(陶特)测斜仪。 14.​ Fish TOTCO with overshot .用打捞筒捞起测斜仪。 15.​ Resume drilling to T.D. 继续钻进到总井深。 16.​ Circulate 15 minutes. 循环15分钟。 17.​ Run in hole. 下钻。 18.​ Put out of hole. 起钻。 19.​ Make an inventory of all ring gaskets. 开一个所有垫圈的清单。 20.​ Use spinning tong. 是用气动扳手。 21.​ Operate the air winch. 是用气动绞车。 22.​ Lay down 57 joints of 5” drill pipe. 甩57根 5” 钻杆。 23.​ Pick up drill stem test tool. 提起钻柱测试工具。 24.​ Circulate mud for 2 hours. 循环泥浆2 个小时。 25.​ Move string during circulation. 再循环时注意活动钻具。 26.​ Circulate hole clean. 循环清洗井眼。 27.​ Circulate bottoms up. 循环泥浆几周。 28.​ Fill up every 5 stands. 每5柱灌一次泥浆。 29.​ Check mud weight every 15 minutes. 每15分钟检查一次泥浆比重。 30.​ Reverse out excess cement. 反循环提出多余的水泥浆。 31.​ Change (replace) old mud by new mud. 用新的泥浆替出旧的泥浆。 32.​ Stop drilling. 停止钻时。 33.​ Drilling ahead. 钻进。 34.​ Pull out of hole bit. 起出钻头。 35.​ Change bit. 换钻头。 36.​ Run the wear bushing. 下抗磨补芯。 37.​ The bit thread type is regular pin. 钻头丝扣是正规公扣。 38.​ What’s the make-up torque? 上扣的扭矩要多大? 39.​ Run in 9” collar. 下9” 钻铤。 40.​ The cathead can’t give enough torque. 猫头的力量不够。 41.​ Connect crossover sub. 接上配合接头。 42.​ The tong angle is too small. 大钳的角度太小。 43.​ Sotp circulating. 停止循环泥浆。 44.​ Break out the stand. 卸立柱。 45.​ Set the single into the mouse-hole. 把这个单根放进鼠洞。 46.​ Can we break out the pipe with rotary table? 可以用转盘卸扣吗? 47.​ No! Break it out with tongs. 不行!要用大钳卸扣。 48.​ Spin it out with the air spanner. 用气动扳手卸扣。 49.​ Put the pipe wiper on the string. 装上钻杆刮泥器。 50.​ Don’t set this stand back. 这柱钻杆不要放在钻杆盒上。 51.​ Make up the lift sub. 接好提升短节。 52.​ Secure the safety clamp. 上好安全卡瓦。 53.​ The bit is nearing the shoe. 钻头快到套管鞋了。 54.​ Slow down the running speed. 放慢下放速度。 55.​ This is the undergauged interval. 这是缩径井段 56.​ This is the drilling program. 这是钻井 设计 领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计 关于书的成语关于读书的排比句社区图书漂流公约怎么写关于读书的小报汉书pdf 。 57.​ How much weight on bit is required? 要加多少钻压? 58.​ Keep the rotary speed at 120-140 RPM. 转速保持120-140转/分。 59.​ Keep the flow rate 3000 LPM. 保持排量 3000 升/分。 60.​ The pump pressure is too high. 泵压太高了。 61.​ Don’t ream the hole too fast. 划眼不要太快。 62.​ Notice the rotary torque. 注意转盘扭矩的变化。 63.​ The penetration rate is getting slower. 钻速变慢了。 64.​ The bit is nearly worn out. 钻头快磨光了。 65.​ Stop drilling at 2000 meters. 钻至2000 米停钻。 66.​ Circulate for one hour. 循环一个小时。 67.​ The pump pressure has increased. 泵压升高了。 68.​ One nozzle may be plugged. 可能有个水眼(喷嘴)堵了。 69.​ What is the hook load? 悬重多少? 70.​ What’s the pick-up weight? 上提悬重是多少? 71.​ What’s the lowering weight? 下放悬重是多少? 72.​ Run in HWDP. 下加重钻杆。 73.​ A stabilizer is needed here.这里需要一个扶正器。 74.​ This is a flexible sub. 这是挠性接头。 75.​ This is the BHA log. 这是下部钻具组合记录。 76.​ Record all outside and inside diameters. 记录好所有(入井工具)内外径。 77.​ We need a short drill collar. 需要一根短钻铤。 78.​ Pull the cat line. 拉猫头。 79.​ Operate the break lever (break). 操作(扶)刹把。 80.​ Stop the pumps. 停泵。 81.​ Make a wiper trip. 通井。 82.​ Retrieve wear bushing. 取出耐磨补芯。 83.​ Bleed off pressure. (释)放压(力)。 84.​ Keep 5 wraps on the drum. 滚筒上留5 圈。 85.​ Set slips. 座上卡瓦。 86.​ If tight hole, repeat wiper trip. 如果井径紧,重复划眼。 87.​ Setback bottom hole assembly. 将下部钻具立于钻杆盒内。 88.​ Make sure all alarms are on. 确保所有警报信号都开着。 89.​ Lay down TDS spinner. 拆下顶驱的旋扣器。 90.​ Run in hole bit # 15 to bottom. 用15 好钻头下钻到底。 91.​ Run in hole to casing shoe. 下钻至套管鞋。 92.​ Pick up same bit and BHA. 装行同样的钻头和钻具组合。 93.​ Lay down 5” HW Drill pipe. 甩 5” 的加重钻杆。 94.​ Move string every 2 hours. 每2个小时活动一次钻具。 95.​ Keep area around shaker clean. 保持振动筛区域干净。 96.​ Control trip gas. 控制起下钻气。 97.​ Ream if needed. 如有必要进行划眼。 98.​ Select the best penetration. 选择最佳的钻进速度。 99.​ Fix the traveling assembly. 固定流动系统。 100.​ Check power tongs and spinning rope are on drill floor. 检查动力钳和尾绳是否在钻台上。 101.​ What is the weight on bit(WOB)? 钻压是多少? 102.​ What is the BHA of this well? 这口井的下部钻具如何组合? 103.​ Drill out cement. 钻穿水泥。 104.​ Drill out 20” casing shoe. 钻穿20” 套管鞋。 105.​ Latch the elevator. 扣吊卡。 106.​ Unlatch the elevator. 开吊卡。 107.​ Set the slip. 放卡瓦。 108.​ Adjust the crown-o-matic ( crown saver). 调整防碰天车。 109.​ Lock the hook pin. 锁紧大沟销子。 110.​ Check OD of stabilizers.检查扶正器的外径。 111.​ Perform leak off test. 进行地层破裂(渗漏)试验。 112.​ Connect kill and choke line. 接上压井和放喷管线。 113.​ Reverse out the drill pipe. 反循环清洗钻杆。 114.​ Make a short trip. 进行短起下钻。 115.​ Change the cutters. 换割刀。 116.​ Slug the pipe. 灌重泥浆。 117.​ Drill the stand down.. 钻完立柱。 118.​ Start(run)the shale shaker. 开振动筛。 119.​ Start the desanders. 开除砂器。 120.​ Start the desilters. 开除泥器。 121.​ Change it with a 40 mesh screen. 换成40 目筛布。 122.​ Shut it off. 关掉。 123.​ Pull it to the cat ramp. 把它拉到坡道上去。 124.​ Make a fast connection. 接单根要快。 125.​ Don’t dump the mud into the sea. 不要把泥浆放到海里。 126.​ Disconnect it with a chain tong. 用链钳卸扣。 127.​ Put a thread protector. 加一个(丝扣)护箍。 128.​ Can we use the power slips? 可以用动力卡瓦吗? 下套管与固井(Casing and cementing) 129.​ Run in hole to bottom for wiper trip. 下钻通井。 130.​ This is the casing program. 这是套管程序。 131.​ Prepare for running casing. 准备下套管。 132.​ Make everything ready for running 7” casing. 做好下7” 套管的准备。 133.​ Make cementing job. 固井。 134.​ Displace cementing with mud pump. 用泥浆泵替水泥浆。 135.​ Set cement plug from 2940 to 2790m. 在2940到2790米井段打水泥塞。 136.​ Pick up cementing head. 接水泥头。 137.​ Cement samples are hard. 水泥样已凝固。 138.​ Pump in 3 cubic meters of spacer. 注隔离液3方。 139.​ Pump down the plug. 泵压(胶)塞。 140.​ Wait on cement. 候凝。 141.​ The guide shoe will be connected. 接引鞋。 142.​ Connect the float collar. 接浮箍。 143.​ Connect the air line to the casing stabbing board. 接好套管扶正台的气管线。 144.​ Run casing with the 350T slip elevator. 用350吨卡瓦式吊卡下套管。 145.​ Clean and dry 20” casing threads with rags. 清洁并擦干20” 套管丝扣。 146.​ Where is the rabbit for drifting the casing? 套管通径规在哪? 拖航、抛锚、定位 Rig Move, Anchoring and Positioning 147.​ What is our position now? 我们现在的船位在哪里? 148.​ What’s the moving speed now? / What is the towing speed? 拖航速度是多少? 149.​ The speed is about 4 knots. 船速是4 节左右。 150.​ Which one is the main tug? 主拖船是那条。 151.​ The main tug is Nanhai 205. 主拖船是南海205。 152.​ Which one is chase boat? 护航船是哪一条? 153.​ How much is the horse power? 有多大马力? 154.​ She(it)has 6000 HP(horse power). 有6000马力。 155.​ Move the rig off location 50 feet. 将平台移开50英尺。 156.​ We are ready to drop the anchors. 已经做好抛锚准备了吗? 157.​ Secure all the movable equipment. 固定各种活动设备。 158.​ Preload. (自动式)压载。 159.​ Ballast. (半潜式)压载。 160.​ Put the preload water into the tank. 向压载舱里灌压载水。 161.​ We need 5500 tons of preload water. 需要5500吨压载水。 162.​ Shall we preload right now? 马上开始压载。 163.​ Drain the water off. 防水。 164.​ The rig is overloaded. 平台已超载。 165.​ Jack up (jack down) the rig. 升/浆船。 166.​ The draft is 3.5 meters. 船体吃水3.5米。 167.​ The jetting pressure is 100 psi. 冲桩压力是100psi。 168.​ Penetrate the legs. 插桩。 169.​ How much penetration do we have? (插桩)入泥多深了? 170.​ No. 1 and No.2 legs indicate 10 meters. 1、2 号桩插入10米。 171.​ Fix the upper and lower wedges. 固定上、下楔块。 172.​ Pay out the anchor line. 放出锚缆绳。 173.​ Skid the derrick. 移动井架。 174.​ The rig is short of potable water now. 平台缺饮用水。 175.​ Drop No.2 and No.3 anchors. 抛2、3 号猫。 176.​ Why has the main engine stopped? 主机为什么停机? 177.​ Unleash the drilling tools. 卸开钻具。 178.​ Tight up. 绷紧(上紧)一点。 179.​ Turn on the cooling water for the windlasses. 开猫机刹车冷却水。 180.​ Retrieve the No.1 to No.8 anchors. 起 1# --8# 猫。 181.​ Check the paint marks at the anchor winches. 检查猫机上的油漆记号。 182.​ Prepare for a location move. 准备好移井位。 183.​ Commence anchor handling. 开始起锚(抛锚)。 184.​ Secure all equipment stored on deck. 固定好所有存放在甲板上的设备。 185.​ Carry out stability and load calculatons. 做稳定和载荷试验。 186.​ Pass pendant line, shackle and buoy to anchor handling vessel. 将抛锚短索、卸扣浮标吊给起锚船。 187.​ Lower the windward anchor to seafloor. 抛上风猫到海底。 188.​ Pick up the leeward anchor first. 先起下风猫。 189.​ Take anchor chaser back to rig. 将捞/抛锚环送回平台。 190.​ Hook up towing lines to tug boat. 将拖缆联接到拖轮。 191.​ Sound fog signal for two seconds every twenty seconds. 发大雾信号,每20 分钟响两秒。 打捞 Fishing 192.​ The bit cutters have been lost in the hole. 牙轮落井。 193.​ Run in the reverse-circulation basket. 下反循凡打捞篮。 194.​ There is a lot of junk in the hole. 井下有很多落物。 195.​ The fish is 235.46 meters. 落鱼长度235.46米。 196.​ The fish top is at 2478.34 meters long. 预定位置2478.34米。 197.​ Stop drilling for coring. 停钻准备取芯。 198.​ Make up core bit. 接取芯钻头。 199.​ What type of core bit is it? 这是什么型号的取芯钻头? 200.​ Run in a diamond core bit. 下金刚石取芯钻头。 201.​ Let’s drop the ball for coring. 可以头球取芯了。 202.​ The core has been broken off. 岩芯断了。 203.​ Put the core in the boxes. 把岩芯装进岩芯盒里。 204.​ Don’t break suddenly. 不要猛刹车。 205.​ Take out the core. 岩芯出筒。 206.​ How long is the core? 岩芯多长? 207.​ The core recovery is 98%. 岩芯收获率是98%。 208.​ Run in the core barrel again. 继续下取芯筒(岩芯筒)。 209.​ Run in hole core barrel. 下取芯筒。 210.​ Drop ball. 投钢球。 211.​ Recover core. 取出岩芯。 212.​ Use same parameters as for core 1#. 使用与1# 取芯同样的参数。 213.​ The down-hole problems are very complicated. 惊吓情况很复杂。 214.​ The hole is tight. 遇阻了。 215.​ Overpull while tripping out. 起钻遇卡 (overpull—超拉力)。 216.​ The formation is unstagble. 地层不稳定。 217.​ The well caving is severe. 井壁垮塌严重。 218.​ There are many return cutting. 返出的岩硝特别多。 219.​ The mud returns have decreased. 返出泥浆减少。 220.​ The hole is enlarged. 井眼扩大了。 221.​ The pipe’s stuck. 卡钻了。 222.​ Pull up to 150 tons. 上提150 吨。 223.​ Slack off to 50 tons. 下放50 吨。 224.​ Ream down all the tight points. 在所有遇阻点进行划眼。 225.​ The rotary table can’t rotate. 转盘转不动。 226.​ Where is the sticking point? 卡点在哪里? 227.​ Make a tensile test. 做拉伸试验。 228.​ Back it off above the free point. 在卡点以上倒扣。 229.​ Where is the back-off position? 脱扣的位置在那? 230.​ Plug the well for side reacking. 打水泥侧钻。 异常井况与压井 Abnormal Well condition and Well control. 231.​ The mud is gas cut. 泥浆有气侵。 232.​ The pit level has lowered quickly. 泥浆液面下降很快。 233.​ The hole lost returns. 井口不返泥浆了。 234.​ The returns are unstable. 返出泥浆量忽大忽小。 235.​ Where’s the thief zone? 漏失层在哪里? 236.​ Cut down the flow rate. 降低排量。 237.​ Lower the mud density. 降低比重。 238.​ Cut down the hydrostatic pressure. 减少净压。 239.​ The gas smell is strong. 天然气味度很浓。 240.​ There’s some trace of oil. 发现有油花。(trace—痕迹) 241.​ The pump pressure is fluctuating. 泵压不稳。Fluctuate—波动 242.​ It is a zone of abnormal pressure. 这是异常压力层。 243.​ The hole(well)is kicking! 井涌了! 244.​ Shut in the BOP! 关闭防喷器! 245.​ Sound the general alarm quickly! 快发出综合报警! 246.​ the stand pipe pressure is 10kg/cm。立管压力10公斤/平方厘米。 247.​ The casing pressure is 25kg./cm. 套压25公斤/平方厘米。 248.​ Fill out the kill sheet. 填写压井记录表。 249.​ Kill the well. 压井。 250.​ There’s a combination of lost returns and the kick. 又喷又涌,情况复杂。 251.​ Reverse the gas out of the hole. 反循环排气。 252.​ What’s the lag time? 迟到时间是多少? 253.​ The well is now stable. 现在井眼已经稳定。 防喷器与水下设备 BOP and Subsea Equipment 254.​ Cut off the 30” conductor. 割掉30”隔水管。(conductor指自升式平台的隔水管)。 255.​ Weld on the 30” bottom flange. 焊接30”法兰。 256.​ Hoist and nipple up 30” diverter. 吊装30”转喷器。 257.​ Change the 5” pipe rams to 3-1/2”rams. 把这个5”闸板焕成3-1/2”。 258.​ Install blind ram. 安装防喷器的盲板芯子。 259.​ Check the seal ring of the conductor. 检查隔水管密封圈。 260.​ Cut off the lifting eye of the conductor. 切割隔水管耳环。 261.​ Test BOP. 测试防喷器。 262.​ Change annular BOP packing. 更换万能防喷器芯子。 263.​ Full pressure test the ram preventers. 对闸板防喷器进行全压试压。 264.​ Test annular BOP at 2500psi. 万能防喷器试压至2500psi。 265.​ Check annular pressure. 检查环形空间压力。 266.​ Confirm the angle of the guide base. 确定基板角度。 267.​ The thread is covered with the quick-release protectors. 已戴好快卸护丝。 268.​ Estabish the guide lines. 装导向绳。 269.​ Connect the TGB running tool. 接临时导向基板送入工具。 270.​ Land the TGB to sea. 下临时导向基板到海底。 271.​ Retrieve the running tool. 退出送入工具。 272.​ Run the BOP and risers. 下防喷器和隔水管。 273.​ Pick up the marine riser. 吊出隔水管(riser—指半潜式平台的隔水管)。 274.​ Pick up the slip joint. 起伸缩节。 275.​ Adjust the riser tensioners. 调整隔水管张力。 276.​ Function test the diverter system. 对转喷器系统进行功能试验。 277.​ Retrieve the pin connector. 取出销钉连接器。 278.​ Move the BOP to the moonpool door. 将防喷器移到圆井甲板的活动门上。 279.​ Run the test plug. 下试压塞。 280.​ Close the upper pipe ram. 关上部钻杆闸板防喷器。 281.​ Open the kill line valve. 开压井管线阀。 282.​ The compensation capacity is 400000 pounds. 补偿压力是400千磅。 283.​ The locking load is 100000 pounds. 锁紧负荷100千磅。 284.​ Support the riser. 接隔水管支撑环。 285.​ Remove the hose bundles. 卸下跨接软管。(hose bundle: 软管束) 286.​ Assure the self-controlled rotation. 保证自动转动。 287.​ Set the LMRP on the test stump. 将下部防喷器插入总成座放到试压桩上。 288.​ Connect the flex joint to the riser. 连接隔水管与挠性接头。 289.​ Land the BOP onto the well head. 座防喷器到井口头。 290.​ Run the subsea TV for monitoring. 下水下电视观察。 291.​ Remove all the riser running tools. 取出所有的隔水管送入工具。 292.​ BOP carrier. 防喷器叉车。 293.​ Lower the universal guide frame. 下放万能导向架。 294.​ Paint mark the top 6 meters of 30” conductor white. 在30”隔水管的顶部6米处用白漆涂上记号。 295.​ Check adequate length for guidelines. 检查导向绳的长度是否足够。 296.​ Move temporary guide base(TGB)into moonpool. 将临时导向基板移到圆井甲板。 297.​ Test pull to check connection. 试拉检查连接。 298.​ Grease TGB and running tool as required. 按要求给临时导向基板及下入工具上黄油。 299.​ Test fitTGB and running tool. 用下入工具试临时导向基板连接。 300.​ Check for junk inside shoe joint. 检查浮鞋内有无落物。 301.​ Pick for 30” conductor handing slings and shackles. 吊上下30”导管的索具和卸扣。 302.​ Is slope indicator properly mounted? 水平仪是否装好? 303.​ Ensure subsea TV is in good condition. 确保水下电视处于良好的状态。 304.​ Place BOP stack on the test stump. 将防喷器放在试压桩上。 305.​ Check condition of all 30” casing connectors. 检查所有30” 套管接头的情况。 306.​ Replace O-rings as required. 按需要、更换O型密封圈。 307.​ attach slope indicator below camera position. 在摄像机下面装上水平仪。 308.​ Inspect and repair diverter. 检查并修理转喷器。 309.​ Prepare spud plate and wire-line to check water depth. 准备测探板和钢丝绳测量水深。 310.​ Record all pressure test on a chart recorder. 用试压表记录试压记录。 311.​ Visually inspect all sealing element. 目视检查所有密封件。 312.​ Check and tighten all bolts. 加查并上紧所有螺栓。 313.​ Bleed off surface accumulators. 地面管线排空气。 314.​ Check for leaks. 检查有无泄漏。 315.​ Lift BOP stack and replace wellhead connector AX ring. 吊起防喷器组并更换连接器AX密封圈。 316.​ Function test wellhead. 对井口头进行功能试验。 317.​ Fill kill and choke calves with seawater. 将压井阀和阻流阀注满海水。 318.​ Pressure test to 500psi then bleed off test pressure. 试压到500psi然后放掉压力。 319.​ Reduce hydraulic control manifold pressure to 5200kpa. 将液压控制管汇压力减小到5200千帕。 320.​ Switch to alternate control pod. 将闸门关到倒控制面板。 321.​ Guidelines are slacked off. 导向绳松了。 322.​ Slack off drill pope and release running the tool. 放松钻杆并卸开下入工具。 323.​ Run subsea TV to observe bit entering the TGB. 下水下电视观察钻头是否进入导向基板。 324.​ Don’t rotate until hole opener passes through the TGB. 再扩眼器通过临时导向基板之前不要旋转。 325.​ Position permanent guide base(PGB) below rotary table. 在转盘下安放永久导向基板。 326.​ Monitor riser level via trip tank. 用计量灌来控制隔水管内的液面。 327.​ Pressure test to 5000psi. 试压5000psi. 328.​ Pick up test mandril and place in BOP stack. 吊起试压防喷器芯子并装入防喷器组 安全与消防 Safety and Firefighting 329.​ Get a work Permit before you can start the hot work. 办理作业 许可 商标使用许可商标使用许可商标使用许可商标使用许可商标使用许可 证才能进行动火作业。 330.​ Welding is not allowed. 不准动焊。 331.​ Put on your (safety) helmet. 带上安全帽。 332.​ It’s a high voltage area. 这是高压区。 333.​ That’s against the rule. 这是违章作业。 334.​ Don’t walk under the crane load. 不要再吊物下走动。 335.​ The repairing is under way. 正在检修。 336.​ Keep your hands clear! / keep you hands off、Do not touch! 不要乱动(不要触摸)。 337.​ Wear and secure your safety belt. 带上并系好安全带。 338.​ Life jacket must he worn when working outboard or overhead. 舷外或高空作业要穿救生衣。 339.​ Have your breathing apparatus near you. 保证附近有防毒面具。 340.​ It’s a drill. 这是演习。 341.​ It was a BOP drill. 这是防喷演习。 342.​ Get in the lifeboat in order. 按顺序进入救生艇。 343.​ Put on life jacket! 穿好救生衣。 344.​ Abandon the vessel! 弃船! 345.​ Sound the abandonment alarm! 发出弃船警报! 346.​ Go to the helideck! 去飞机坪集合! 347.​ Aboard the lifeboat. 登上救生艇。 348.​ Aboard the supply boat to shore! 乘拖船上岸。 349.​ Check life saving apparatus periodically. 定期检查救生设备。 350.​ It’s for fire fighting. 这是消防用的。 351.​ Start the fire pump. 启动消防泵。 352.​ This rope is too small. 这绳子太细。 353.​ It should be function tested. 需做功能测试。 354.​ A warning notice should be set up. 要挂警告牌。 355.​ Do you have an emergency program (contingency plan)? 你们有没有应急计划? 356.​ It must be ready in an emergency condition. 必须保持良好的应急状态。 357.​ Will the typhoon bit our rig? 台风要袭击(经过)我们的平台吗? 358.​ We will have to evacuate the rig. 我们要撤离平台。 359.​ Personnel on board (POB). 在船总人数。 360.​ Sound fire alarm. 发消防警报。 361.​ This is a fire drill. 这是消防演习。 362.​ Conduct-abandon ship drill. 举行弃船演习。 363.​ Release the boat hooks. 释放救生吊钩。 364.​ Board the life boat. 要挂警告牌。 365.​ Remove the rust and paint with anti-corrosive primer. 除锈后上防锈底漆 366.​ Three raft are located near life boat station port side. 在左舷救生艇站附近还有3个救生筏。 367.​ Wear work vests when working below. 在圆井甲板面下面工作时必须穿工作救生衣。 368.​ The station bills need to be updated. 应急部署表须更新。 369.​ Check he expiry date for all foam extinguisher. 检查所有泡沫灭火器的过期时间。 370.​ Close all the water-tight doors. 关闭所有水密门。 371.​ Safety procedure shall be followed at all the times. 在任何时间都应遵守安全程序。 372.​ Anchor wires should have a Spelter type socket at anchor side. 抛锚绳靠锚的一端应使用锌压头。 373.​ Colour code all the connection at the loading station. 在供给站管线接头处用颜色标明各管线。 374.​ Verify that a high level alarm is installed on the sludge tank. 确认污水舱安装有高位警报。 375.​ Don’t switch on during drilling operation. 钻井作业期间不能合闸。 376.​ Provide two independent means to start the emergency generator engine. 应急发电机应有两套独立的启动 方法 快递客服问题件处理详细方法山木方法pdf计算方法pdf华与华方法下载八字理论方法下载 。 377.​ Have the boom pennant wires of port crane re-certified. 重新认证左舷吊车扒杆变幅绳。 378.​ Clean the intemals of the emergency switchboard. 清洁应急配电盘内部。 直升机与供应商Helicopter and Supply Vessel 379.​ Load out Contractor’s riser at Zhanjiang anchorage. 在湛江锚地把承包商的隔水管装上平台。 380.​ Offload casing.(从供应船上)卸套管。 381.​ Load (offload/unload)the boat. 装(卸)船。 382.​ Get the food container loaded on the boat. 把食品集装箱装上船(拖轮)。 383.​ The helicopter will land on rig soon. 直升机很快就要在平台上降落。 384.​ Tell the base to get (send) a chopper here. 通知基地派飞机来。 385.​ Helicopters are not allowed to land here. 直升机不能降落。 386.​ Report the weather condition to the pilot. 向飞机驾驶员报天气。 387.​ Inform the boat come to stand-by. 通知拖轮过来待命。 388.​ Call the boat to come along port side. 通知拖轮过来靠左舷。 389.​ We will take the personnel basket. 我们乘坐吊篮。 检修 Repair and maintenance. 390.​ Have an overall check. 进行全面检查。 391.​ MPI the brake linkage system. 对刹车连接系统进行磁粉探伤。 392.​ Demonstrate that the make-up cathead can pull 7000 Ibs. 证明 住所证明下载场所使用证明下载诊断证明下载住所证明下载爱问住所证明下载爱问 上扣警备锚头能拉到7000磅。 393.​ Determine the origin of the air leak and rectify this. 找出漏气的地方并处理。 394.​ Adjust the brake band equalizer beam properly. 适当调整刹带平衡梁。 395.​ Note that the 3000 hour inspection on TDS is due. 注意顶驱的3000小时保养时间已到。 396.​ Check sheave rope pocket wear with a 1-3/8”+1/32” template. 用1-3/8”+1/32” 量规检查绳槽的磨损情况。 397.​ Repair the handrails on the crown. 修理天车的栏杆。 398.​ Function test the anti-freefall brake on monthly basis. 每月对天车防碰装置进行功能试验。 399.​ Get me a spanner, please. 请递给我一把扳手。 400.​ Renew brake rim because of excessive wear. 更换磨损严重的刹车鼓。 401.​ Clearly mark safe working load (SWL) on the air winch below the rig floor. 标明钻台地下气动绞车的安全工作负荷。 402.​ Measure the master bushings for wear. 测量主补芯磨损情况。 403.​ Have BOP ram opened up for internal inspection. 打开防喷器闸板进行内部检查。 404.​ Install a ground cable on the triplex pump motor. 给三抽缸泵马达安装接地线。 405.​ We need a 48”pipe wrench. 我们需要一把48” 的管钳。 406.​ Strike it with a sledge hammer. 用大锤打。 407.​ We want a triangle file. 需要一把三角锉刀。 408.​ Tighten up the screw. 紧一下螺丝。 409.​ Check it with a level. 用水平尺量一下。 410.​ Put some engine oil. 抹点机油。 411.​ Have it greased. 给它上黄油。 412.​ Put out of hole test string. 取出测试管串。 413.​ Check all the equipment. 检查所有设备。 414.​ There’s something wrong with it. 有点毛病。 415.​ Rig inspection will be performed in August. 船检安排在8月
本文档为【中原海外施工队伍的现场总结】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_530428
暂无简介~
格式:doc
大小:117KB
软件:Word
页数:18
分类:
上传时间:2011-09-13
浏览量:17