Designation: B 117 – 07a
Standard Practice for
Operating Salt Spray (Fog) Apparatus1
This standard is issued under the fixed designation B 117; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (e) indicates an editorial change since the last revision or reapproval.
This standard has been approved for use by agencies of the Department of Defense.
1. Scope
1.1 This practice covers the apparatus, procedure, and
conditions required to create and maintain the salt spray (fog)
test environment. Suitable apparatus which may be used is
described in Appendix X1.
1.2 This practice does not prescribe the type of test speci-
men or exposure periods to be used for a specific product, nor
the interpretation to be given to the results.
1.3 The values stated in SI units are to be regarded as the
standard. The values given in parentheses are for information
only.
1.4 This standard does not purport to address all of the
safety concerns, if any, associated with its use. It is the
responsibility of the user of this standard to establish appro-
priate safety and health practices and determine the applica-
bility of regulatory limitations prior to use.
2. Referenced Documents
2.1 ASTM Standards: 2
B 368 Test Method for Copper-Accelerated Acetic Acid-
Salt Spray (Fog) Testing (CASS Test)
D 609 Practice for Preparation of Cold-Rolled Steel Panels
for Testing Paint, Varnish, Conversion Coatings, and
Related Coating Products
D 1193 Specification for Reagent Water
D 1654 Test Method for Evaluation of Painted or Coated
Specimens Subjected to Corrosive Environments
E 70 Test Method for pH of Aqueous Solutions With the
Glass Electrode
E 691 Practice for Conducting an Interlaboratory Study to
Determine the Precision of a Test Method
G 85 Practice for Modified Salt Spray (Fog) Testing
3. Significance and Use
3.1 This practice provides a controlled corrosive environ-
ment which has been utilized to produce relative corrosion
resistance information for specimens of metals and coated
metals exposed in a given test chamber.
3.2 Prediction of performance in natural environments has
seldom been correlated with salt spray results when used as
stand alone data.
3.2.1 Correlation and extrapolation of corrosion perfor-
mance based on exposure to the test environment provided by
this practice are not always predictable.
3.2.2 Correlation and extrapolation should be considered
only in cases where appropriate corroborating long-term atmo-
spheric exposures have been conducted.
3.3 The reproducibility of results in the salt spray exposure
is highly dependent on the type of specimens tested and the
evaluation criteria selected, as well as the control of the
operating variables. In any testing program, sufficient repli-
cates should be included to establish the variability of the
results. Variability has been observed when similar specimens
are tested in different fog chambers even though the testing
conditions are nominally similar and within the ranges speci-
fied in this practice.
4. Apparatus
4.1 The apparatus required for salt spray (fog) exposure
consists of a fog chamber, a salt solution reservoir, a supply of
suitably conditioned compressed air, one or more atomizing
nozzles, specimen supports, provision for heating the chamber,
and necessary means of control. The size and detailed con-
struction of the apparatus are optional, provided the conditions
obtained meet the requirements of this practice.
4.2 Drops of solution which accumulate on the ceiling or
cover of the chamber shall not be permitted to fall on the
specimens being exposed.
1 This practice is under the jurisdiction of ASTM Committee G01 on Corrosion
of Metals and is the direct responsibility of Subcommittee G01.05 on Laboratory
Corrosion Tests.
Current edition approved Dec. 15, 2007. Published January 2008. Originally
approved in 1939. Last previous edition approved in 2007 as B 117–07.
2 For referenced ASTM standards, visit the ASTM website, www.astm.org, or
contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
Standards volume information, refer to the standard’s Document Summary page on
the ASTM website.
1
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.
-
-
`
`
,
`
`
,
`
`
`
`
`
`
,
`
,
,
,
`
,
,
`
,
,
,
`
`
,
-
`
-
`
,
,
`
,
,
`
,
`
,
,
`
-
-
-
4.3 Drops of solution which fall from the specimens shall
not be returned to the solution reservoir for respraying.
4.4 Material of construction shall be such that it will not
affect the corrosiveness of the fog.
4.5 All water used for this practice shall conform to Type IV
water in Specification D 1193 (except that for this practice
limits for chlorides and sodium may be ignored). This does not
apply to running tap water. All other water will be referred to
as reagent grade.
5. Test Specimens
5.1 The type and number of test specimens to be used, as
well as the criteria for the evaluation of the test results, shall be
defined in the specifications covering the material or product
being exposed or shall be mutually agreed upon between the
purchaser and the seller.
6. Preparation of Test Specimens
6.1 Specimens shall be suitably cleaned. The cleaning
method shall be optional depending on the nature of the surface
and the contaminants. Care shall be taken that specimens are
not recontaminated after cleaning by excessive or careless
handling.
6.2 Specimens for the evaluation of paints and other organic
coatings shall be prepared in accordance with applicable
specification(s) for the material(s) being exposed, or as agreed
upon between the purchaser and the supplier. Otherwise, the
test specimens shall consist of steel meeting the requirements
of Practice D 609 and shall be cleaned and prepared for coating
in accordance with the applicable procedure of Practice D 609.
6.3 Specimens coated with paints or nonmetallic coatings
shall not be cleaned or handled excessively prior to test.
6.4 Whenever it is desired to determine the development of
corrosion from an abraded area in the paint or organic coating,
a scratch or scribed line shall be made through the coating with
a sharp instrument so as to expose the underlying metal before
testing. The conditions of making the scratch shall be as
defined in Test Method D 1654, unless otherwise agreed upon
between the purchaser and the seller.
6.5 Unless otherwise specified, the cut edges of plated,
coated, or duplex materials and areas containing identification
marks or in contact with the racks or supports shall be
protected with a suitable coating stable under the conditions of
the practice.
NOTE 1—Should it be desirable to cut test specimens from parts or from
preplated, painted, or otherwise coated steel sheet, the cut edges shall be
protected by coating them with paint, wax, tape, or other effective media
so that the development of a galvanic effect between such edges and the
adjacent plated or otherwise coated metal surfaces, is prevented.
7. Position of Specimens During Exposure
7.1 The position of the specimens in the salt spray chamber
during the test shall be such that the following conditions are
met:
7.1.1 Unless otherwise specified, the specimens shall be
supported or suspended between 15 and 30° from the vertical
and preferably parallel to the principal direction of flow of fog
through the chamber, based upon the dominant surface being
tested.
7.1.2 The specimens shall not contact each other or any
metallic material or any material capable of acting as a wick.
7.1.3 Each specimen shall be placed to permit unencum-
bered exposure to the fog.
7.1.4 Salt solution from one specimen shall not drip on any
other specimen.
NOTE 2—Suitable materials for the construction or coating of racks and
supports are glass, rubber, plastic, or suitably coated wood. Bare metal
shall not be used. Specimens shall preferably be supported from the
bottom or the side. Slotted wooden strips are suitable for the support of flat
panels. Suspension from glass hooks or waxed string may be used as long
as the specified position of the specimens is obtained, if necessary by
means of secondary support at the bottom of the specimens.
8. Salt Solution
8.1 The salt solution shall be prepared by dissolving 5 6 1
parts by mass of sodium chloride in 95 parts of water
conforming to Type IV water in Specification D 1193 (except
that for this practice limits for chlorides and sodium may be
ignored). Careful attention should be given to the chemical
content of the salt. The salt used shall be sodium chloride with
not more than 0.3 % by mass of total impurities. Halides
(Bromide, Fluoride, and Iodide) other than Chloride shall
constitute less than 0.1 % by mass of the salt content. Copper
content shall be less than 0.3 ppm by mass. Sodium chloride
containing anti-caking agents shall not be used because such
agents may act as corrosion inhibitors. See Table 1 for a listing
of these impurity restrictions. Upon agreement between the
purchaser and the seller, analysis may be required and limits
TABLE 1 Maximum Allowable Limits for Impurity Levels in
Sodium ChlorideA,B,C
Impurity Description Allowable Amount
Total Impurities # 0.3 %
Halides (Bromide, Fluoride and Iodide) excluding Chloride < 0.1 %
Copper < 0.3 ppm
Anti-caking Agents none
A A common formula used to calculate the amount of salt required by mass to
achieve a 5 % salt solution of a known mass of water is:
0.053 3 Mass of Water 5 Mass of NaCl required
The mass of water is 1 g per 1 mL. To calculate the mass of salt required in
grams to mix 1 L of a 5 % salt solution, multiply 0.053 by 1000 g (35.27 oz, the
mass of 1 L of water). This formula yields a result of 53 g (1.87 oz) of NaCl required
for each liter of water to achieve a 5 % salt solution by mass.
The 0.053 multiplier for the sodium chloride used above is derived by the
following:
1000 g (mass of a full L of water) divided by 0.95
(water is only 95 % of the total mixture by mass) yields 1053 g
This 1053 g is the total mass of the mixture of one L of water with a 5% sodium
chloride concentration. 1053 g minus the original weight of the L of water, 1000 g,
yields 53 g for the weight of the sodium chloride. 53 g of total sodium chloride
divided by the original 1000 g of water yields a 0.053 multiplier for the sodium
chloride.
As an example: to mix the equivalent of 200 L (52.83 gal) of 5 % sodium chloride
solution, mix 10.6 kg (23.37 lb) of sodium chloride into 200 L (52.83 gal) of water.
200 L of water weighs 200 000 g. 200 000 g of water 3 0.053 (sodium chloride
multiplier) = 10 600 g of sodium chloride, or 10.6 kg.
B In order to ensure that the proper salt concentration was achieved when mixing
the solution, it is recommended that the solution be checked with either a salimeter
hydrometer or specific gravity hydrometer. When using a salimeter hydrometer, the
measurement should be between 4 and 6 % at 25°C (77°F). When using a specific
gravity hydrometer, the measurement should be between 1.0255 and 1.0400 at
25°C (77°F).
C If the purity of the salt used is >99.9%, then the limits for halides can be
ignored. This is due to the fact that the halides cannot be $0.1% with a salt purity
of >99.9%. If the salt used is of lower purity, then test for halides.
B 117 – 07a
2
-
-
`
`
,
`
`
,
`
`
`
`
`
`
,
`
,
,
,
`
,
,
`
,
,
,
`
`
,
-
`
-
`
,
,
`
,
,
`
,
`
,
,
`
-
-
-
established for elements or compounds not specified in the
chemical composition given above.
8.2 The pH of the salt solution shall be such that when
atomized at 35°C (95°F) the collected solution will be in the
pH range from 6.5 to 7.2 (Note 3). Before the solution is
atomized it shall be free of suspended solids (Note 4). The pH
measurement shall be made at 25°C (77°F) using a suitable
glass pH-sensing electrode, reference electrode, and pH meter
system in accordance with Test Method E 70.
NOTE 3—Temperature affects the pH of a salt solution prepared from
water saturated with carbon dioxide at room temperature and pH adjust-
ment may be made by the following three methods:
(1) When the pH of a salt solution is adjusted at room temperature, and
atomized at 35°C (95°F), the pH of the collected solution will be higher
than the original solution due to the loss of carbon dioxide at the higher
temperature. When the pH of the salt solution is adjusted at room
temperature, it is therefore necessary to adjust it below 6.5 so the collected
solution after atomizing at 35°C (95°F) will meet the pH limits of 6.5 to
7.2. Take about a 50-mL sample of the salt solution as prepared at room
temperature, boil gently for 30 s, cool, and determine the pH. When the
pH of the salt solution is adjusted to 6.5 to 7.2 by this procedure, the pH
of the atomized and collected solution at 35°C (95°F) will come within
this range.
(2) Heating the salt solution to boiling and cooling to 35°C (95°F) and
maintaining it at 35°C (95°F) for approximately 48 h before adjusting the
pH produces a solution the pH of which does not materially change when
atomized at 35°C (95°F).
(3) Heating the water from which the salt solution is prepared to 35°C
(95°F) or above, to expel carbon dioxide, and adjusting the pH of the salt
solution within the limits of 6.5 to 7.2 produces a solution the pH of which
does not materially change when atomized at 35°C (95°F).
NOTE 4—The freshly prepared salt solution may be filtered or decanted
before it is placed in the reservoir, or the end of the tube leading from the
solution to the atomizer may be covered with a double layer of cheesecloth
to prevent plugging of the nozzle.
NOTE 5—The pH can be adjusted by additions of dilute ACS reagent
grade hydrochloric acid or sodium hydroxide solutions.
9. Air Supply
9.1 The compressed air supply to the Air Saturator Tower
shall be free of grease, oil, and dirt before use by passing
through well-maintained filters. (Note 6) This air should be
maintained at a sufficient pressure at the base of the Air
Saturator Tower to meet the suggested pressures of Table 2 at
the top of the Air Saturator Tower.
NOTE 6—The air supply may be freed from oil and dirt by passing it
through a suitable oil/water extractor (that is commercially available) to
stop any oil from reaching the Air Saturator Tower. Many oil/water
extractors have an expiration indicator, proper preventive maintenance
intervals should take these into account.
9.2 The compressed air supply to the atomizer nozzle or
nozzles shall be conditioned by introducing it into the bottom
of a tower fillwed with water. A common method of introduc-
ing the air is through an air dispersion device (X1.4.1). The
level of the water must be maintained automatically to ensure
adequate humidification. It is common practice to maintain the
temperature in this tower between 46 and 49°C (114–121°F) to
offset the cooling effect of expansion to atmospheric pressure
during the atomization process. Table 2 shows the temperature,
at different pressures, that are commonly used to offset the
cooling effect of expansion to atmospheric pressure.
9.3 Careful attention should be given to the relationship of
tower temperature to pressure since this relationship can have
a direct impact to maintaining proper collection rates (Note 7).
It is preferable to saturate the air at temperatures well above the
chamber temperature as insurance of a wet fog as listed in
Table 2.
NOTE 7—If the tower is run outside of these suggested temperature and
pressure ranges to acheive proper collection rates as described in 10.2 of
this practice, other means of verifying the proper corrosion rate in the
chamber should be investigated, such as the use of control specimens
(panels of known performance in the test conducted). It is preferred that
control panels be provided that bracket the expected test specimen
performance. The controls allow for the normalization of test conditions
during repeated running of the test and will also allow comparisons of test
results from different repeats of the same test. (Refer to Appendix X3,
Evaluation of Corrosive Conditions, for mass loss procedures).
10. Conditions in the Salt Spray Chamber
10.1 Temperature—The exposure zone of the salt spray
chamber shall be maintained at 35 6 2°C (95 6 3°F). Each set
point and its tolerance represents an operational control point
for equilibrium conditions at a single location in the cabinet
which may not necessarily represent the uniformity of condi-
tions throughout the cabinet. The temperature within the
exposure zone of the closed cabinet shall be recorded (Note 8)
at least once daily (except on Saturdays, Sundays, and holidays
when the salt spray test is not interrupted for exposing,
rearranging, or removing test specimens or to check and
replenish the solution in the reservoir)
NOTE 8—A suitable method to record the temperature is by a continu-
ous recording device or by a thermometer which can be read from outside
the closed cabinet. The recorded temperature must be obtained with the
salt spray chamber closed to avoid a false low reading because of wet-bulb
effect when the chamber is open.
10.2 Atomization and Quantity of Fog—Place at least two
clean fog collectors per atomizer tower within the exposure
zone so that no drops of solution will be collected from the test
specimens or any other source. Position the collectors in the
proximity of the test specimens, one nearest to any nozzle and
the other farthest from all nozzles. A typical arrangement is
shown in Fig. 1. The fog shall be such that for each 80
cm2 (12.4 in.2) of horizontal collecting area, there will be
collected from 1.0 to 2.0 mL of solution per hour based on an
average run of at least 16 h (Note 9). The sodium chloride
concentration of the collected solution shall be 5 6 1 mass %
(Notes 9-11). The pH of the collected solution shall be 6.5 to
7.2. The pH measurement shall be made as described in 8.2
(Note 3).
NOTE 9—Suitable collecting devices are glass or plastic funnels with
TABLE 2 Suggested Temperature and Pressure guideline for the
top of the Air Saturator Tower for the operation of a test at 35°C
(95°F)
Air Pressure, kPa Temperature, ° C Air Pressure, PSI Temperature, ° F
83 46 12 114
96 47 14 117
110 48 16 119
124 49 18 121
B 117 – 07a
3
--``,``,``````,`,,,`,,`,,,``,-`-`,,`,,`,`,,`---
the stems inserted through stoppers into graduated cylinders, or crystal-
lizing dishes. Funnels and dishes with a diameter of 10 cm (3.94 in.) have
an area of about 80 cm2 (12.4 in.2).
NOTE 10—A solution having a specific gravity of 1.0255 to 1.0400 at
25°C (77°F) will meet the concentration requirement. The sodium
chloride concentration may also be determined using a suitable salinity
meter (for example, utilizing a sodium ion-selective glass electrode) or
colorimetrically as follows. Dilute 5 mL of the collected solution to 100
mL with distilled water and mix thoroughly; pipet a 10-mL aliquot into an
evaporating dish or casserole; add 40 mL of distilled water and 1 mL of
1 % potassium chromate solution (chloride-free) and titrate with 0.1 N
silver nitrate solution to the first appearance of a permanent red coloration.
A solution that requires between 3.4 and 5.1 mL of 0.1 N silver nitrate
solution will meet the concentration requirements.
NOTE 11—Salt solutions from 2 to 6 % will give the same results,
though for uniformity the limits are set at 4 to 6 %.
10.3 The nozzle or nozzles shall be so directed or baffled
that none of the spray can impinge directly on the test
specimens.
11. Continuity of Exposure
11.1 Unless otherwise specified in the specifications cover-
ing the material or product being tested, the test shall be
continuous for the duration of the entire test period. Continu-
ous operation implies that the chamber be closed and the spray
op
本文档为【ASTMB117-2007A】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。