首页 Z-006-Data_Sheet

Z-006-Data_Sheet

举报
开通vip

Z-006-Data_Sheet PRESERVATION RECORD ELECTRICAL (EP-01) Sheet no. PO no. : Area : MC Package no. Manufacturer : System : Description : Subsystem : Tag no. (Applicable Items) VALID STATUS CODE = OK, NA INSPECTION ITEM SUPPL. FABR. HOOKUP COMMENTS ...

Z-006-Data_Sheet
PRESERVATION RECORD ELECTRICAL (EP-01) Sheet no. PO no. : Area : MC Package no. Manufacturer : System : Description : Subsystem : Tag no. (Applicable Items) VALID STATUS CODE = OK, NA INSPECTION ITEM SUPPL. FABR. HOOKUP COMMENTS 01 Supplier’s initial preserv. instructions issued 02 Preservation performed 03 Preservation labels fixed 04 Toxicological data sheets attached 05 Corrosion inhibitor installed 06 Frost precautions taken 07 Storage/transport protection implemented 08 Ship loose items marked and preserved 09 Insulation resistance performed (Ref . EP-02) 10 Periodical preservation carried out 11 12 13 14 15 16 17 18 SUPPLIERS ADDITIONAL MAINTENANCE REQUIREMENT LIST INTERVAL VERIFIED SUPPLIER FABRICATION HOOKUP Name Sign Date Name Sign Date PRESERVATION RECORD INSULATION RESISTANCE (EP-02) Sheet no. MC Package no. TAG.NO. AREA INSULATION RESISTANCE M.ohm PHASE TO PHASE PHASE TO EARTH MEGGER TEST DATE R/S S/T R/T R S T VERIFIED SUPPLIER FABRICATION HOOKUP Name Sign Date Name Sign Date PRESERVATION MAINTENANCE CHECK LIST ELECTRICAL EQUIPMENT (EP-03) Sheet no. INTERVAL IN WEEKS CHECK DESCRIPTION Note: Ensure that equipment is not energised other than for heating and that safety precautions are followed. GENERAL CHECK ITEMS 1 Shafts on rotating equipment which are not locked shall be rotated 1 1/4 turn in the rotating direction to avoid brinelling when located in one position for long periods. Make sure that the new shaft position varies from check to check. Bearings with lube oil housing, check that oil level is adequate prior to rotation. 2 Inspect for corrosion, cleanliness and moisture and add preservative as required and ensure sealing and protection. 2 Ensure that preservation labels are in position. 1 Inspect and punch list any damage to the equipment. 2 Ensure that heating works using an ammeter or handfeeling the unit. Ensure that indication light on temporary heating distribution panel is working. 4 Inspect connection boxes for moisture and replace corrosion inhibitor if necessary. SPECIAL CHECK ITEMS 4 For switchboard, pull out at least one circuit breaker and inspect. 4 For heaters that are not temporarily energised, measure insulation resistance phase to phase and phase to earth. 4 For motors, generators and transformers measure insulation resistance phase to phase and phase to earth. 4 For batteries, follow suppliers instruction. 4 Ensure that non terminated cables are fitted with shrinking shroud. AREA RELATED CHECK 4 Check for physical damage to cable trays, light fittings, push-button etc. 2 Check that battery, switchboard and electrical equipment rooms are clean and dry. Note: Ensure that shipping stops are fitted on relevant equipment, prior to transfer of equipment. PRESERVATION RECORD INSTRUMENT (IP-01) Sheet no. PO no. : Area : MC Package no. Manufacturer : System : Description : Subsystem : Tag no. (Applicable Items) VALID STATUS CODE = OK, NA INSPECTION ITEM SUPPL. FABR. HOOKUP COMMENTS 01 Supplier’s initial preserv. instructions issued 02 Preservation performed 03 Preservation labels fixed 04 Toxicological data sheets attached 05 Corrosion inhibitor installed 06 Frost precautions taken 07 Storage/transport protection implemented 08 Ship loose items marked and preserved 09 Periodical preservation carried out 10 11 12 13 14 15 16 17 18 SUPPLIERS ADDITIONAL MAINTENANCE REQUIREMENT LIST INTERVAL VERIFIED SUPPLIER FABRICATION HOOKUP Name Sign Date Name Sign Date PRESERVATION MAINTENANCE CHECK LIST INSTRUMENT EQUIPMENT (IP-02) Sheet no. INTERVAL IN WEEKS CHECK DESCRIPTION Note: Ensure that unit is not energised. GENERAL CHECK ITEMS 1 Ensure that all covers or doors on units are properly secured and sealed. If unit is protected with purge instrument air, ensure that recommended pressure and humidity is maintained. 1 Inspect and punch list any damage to the equipment. 4 Inspect units for corrosion damage, moisture etc. Clean and dry unit carefully. Replace corrosion inhibitor where required. 4 Check that external surfaces or paintwork are not damaged. 4 Ensure that recommended preservatives are in good condition. Re-apply as necessary to unpainted sliding and static surfaces. Do NOT apply to working electrical parts. Wipe off preservative from non-metallic surfaces. 4 Ensure that all hinges, cover threads and fasteners are greased. 4 Ensure that all necessary covers, end caps and plugs are in position on cables, tubing ends and associated control equipment. Replace any missing covers, plugs, caps etc. 4 Ensure that preservation labels are in position. Correct and update as required. 2 Check that all sensitive instrumentation exposed to damage are protected. SPECIAL CHECK ITEMS 8 Check that gas detector heads are stored in their respective factory sealed bags in a suitable storage location. 4 Ensure that non terminated cables are fitted with shrinking shroud. AREA RELATED CHECK 4 Check for physical damage and damage of preservation protection. 2 Check that instrument rooms are clean and dry. Note: Ensure that shipping stops are fitted on relevant equipment, prior to transfer of equipment from suppliers and module contractors. PRESERVATION RECORD MECHANICAL (MP-01) Sheet no. PO no. : Area : MC Package no. Manufacturer : System : Description : Subsystem : Tag no. (Applicable Items) VALID STATUS CODE = OK, NA INSPECTION ITEM SUPPL. FABR. HOOKUP COMMENTS 01 Supplier’s initial preserv. instructions issued 02 Preservation performed 03 Preservation labels fixed 04 Toxicological data sheets attached 05 Corrosion inhibitor installed 06 Frost precautions taken 07 Storage/transport protection implemented 08 Ship loose items marked and preserved 09 Equipment enclosure sealed off 10 In/outlets sealed off 11 Insulated part protected 12 Periodical preservation carried out 13 14 15 16 17 18 SUPPLIERS ADDITIONAL MAINTENANCE REQUIREMENT LIST INTERVAL VERIFIED SUPPLIER FABRICATION HOOKUP Name Sign Date Name Sign Date PRESERVATION MAINTENANCE CHECK LIST MECHANICAL (MP-02) Sheet no. INTERVAL IN WEEKS CHECK DESCRIPTION 1 Shafts on rotating equipment which are not locked shall be rotated 1 1/4 turn in the rotating direction to avoid brinelling when located in one position for long periods. Make sure that the new shaft position varies from check to check. Bearings with lube oil housing, check that oil level is adequate prior to rotation. 1 Check that compartment heater is working. 1 Check and report that preservation of control-, instrument-, switchgear-rooms, quarters and offices are maintained as per preservation requirements. 1 Inspect and punch list any damage to the equipment. 4 Check storage and preservation condition on all mechanical shipped loose equipment. 4 Check that dust blinds are fitted on nozzles in and out from skids on single items of equipment and on free pipe ends and ducts. 4 Check that painted and machined surfaces, which shall be coated with a rust preventive wax or oil are maintained. 4 Check that the protective cover are maintained. 24 Open up access hatch or inspection nozzles, check and report internal condition of surfaces and existing preservation on carbon steel coolers, heater, crude/gas meters, tanks and vessel, centrifugal, screw-reciprocating compressors. 4 Check for physical damage and damage of preservation protection. _927021809.bin _927021813.bin _927021815.bin _927021817.bin _927021814.bin _927021811.bin _927021812.bin _927021810.bin _927021800.bin _927021804.bin _927021806.bin _927021808.bin _927021805.bin _927021802.bin _927021803.bin _927021801.bin _927021795.bin _927021797.bin _927021798.bin _927021796.bin _927021793.bin _927021794.bin _927021791.bin _927021792.bin _927021788.bin _927021790.bin _927021787.bin
本文档为【Z-006-Data_Sheet】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_829858
暂无简介~
格式:doc
大小:273KB
软件:Word
页数:7
分类:生活休闲
上传时间:2018-09-05
浏览量:12